Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • CIM
    Comparison of Flotation Grade Dynamics Enabled By Real-Time Measurement

    By F. E. du Plessis

    "The distinction between data suitable for process control and data subject to aliasing only becomes quantifiable with the availability of rapid real-time measurements. Expecting the dynamics of flota

    Jan 1, 2012

  • CIM
    The Greenhills surface coal mining project

    By Clifford Britch

    "Kaiser Resources Ltd. has completed feasibility studies resulting in approval of $277,500,000 for the construction of the Greenhills Surface Coal Mine, located 35 km north of Sparwood, B.C. The mine

    Jan 1, 1981

  • CIM
    Electrical Model of an Electrowinning Circuit Including Stray Current through Electrolyte Piping

    By S. C. Richardson

    The electrowinning (EW) circuit involves using DC current in the electro-deposition of metal ions dissolved in an electrolyte solution. This paper reviews a method to generate an electrical model of a

    Jan 1, 2019

  • CIM
    Applications of geophysical methods to resource development in northern Canada

    By A. E. Taylor, A. S. Judge, P. T. Lafleche

    "Resource development in northern Canada has special requirements which derive from the unique environmental and eco-logical nature of the northern environment. In this paper several case histories in

    Jan 1, 1987

  • CIM
    Maximizing Gravity Recovery through the Application of Multiple Gravity Devices

    By J. A. Abols, P. M. Grady

    Recovery via gravity is one of the oldest mineral processing methods available. Unfortunately, the use of gravity techniques for gold recovery has been in decline for the past century as more effectiv

    Jan 1, 2005

  • CIM
    Tentative identification of chemical elements likely to escape in the atmosphere attheLingan coal-fired power plant, Lingan, Nova Scotia

    By Erwin L. Zodrow

    "The neglect of including the toxic metal mercury in the list of escaping elements (Zodrow, CIM Bulletin, September 1982, pp. 138-140) was pointed out to the author in a private letter by J.E. Rehder,

    Jan 1, 1982

  • CIM
    Cyclone modelling: A review of present technology

    By L. R. Plitt, A. A. Turak, B. C. Flintoff

    "Since the publication of empirical cyclone models by Lynch and Rao in 1975 and by Plitt in 1976, the technical literature on this subject has consisted primarily of reports of applications, with only

    Jan 1, 1987

  • CIM
    Advantages of Tailing Disposal by Thickened Discharge

    By E. I. Robinsky

    "This paper describes a new, proven approach for tailing disposal. Not only is the disclosed system less damaging to the environment, it is also less costly to operate, to close down and maintain in p

    Jan 1, 1976

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • CIM
    Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada

    Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail

    May 1, 2009

  • CIM
    High SO2 Feed Gas Sulfuric Acid Plant Design Option

    By D. J. McLaws

    "Recent innovations in metal smelting technology utilize continuous oxygen-enriched smelting and converting processes which are capable of producing off-gases containing up to 60% SO2 or more. Other S

    Jan 1, 2014

  • CIM
    Nitrogen-Based Collectors for Sulfide Flotation – Tecflote™

    By A. Lewis, J. Zachwieja, M. Widell, P. Zhou, W. W. Geissler, M. Svensson, A. Movahedi, H. Nordberg

    Flotation collectors for sulfide minerals has been traditionally based on xanthate, thiophosphate, thiophosphinate and thiocarbamate, all derived from sulfur chemistry. Tecflote™ is a new family of pa

    Jan 1, 2019

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • CIM
    Tailings Disposal Area Development at Inco Sudbury Operations

    By J. P. Van Cruyningen, M. J. Puro

    "A 2400 acre extension to the existing Tailings Area is under development at Inco's Copper Cliff Milling operations.The new area is being developed in stages as production levels dictate thus minimizi

    Jan 1, 1987

  • CIM
    Gold Passivation: Some Fundamental Issues to Highlight

    By A. Azizi, P. Blatter, A. Bouajila

    "Due to the high reactivity of sulfide minerals in alkaline cyanide solutions, some parasitic reactions inflict a heavy gold surface passivation and excess cyanide consumption resulting in a dramatic

    Jan 1, 2012

  • CIM
    Characteristics of Mineralization at the Main Zone of the Clarence Stream Gold Deposit, Southwestern New Brunswick, Canada: Evidence for an Intrusion-Related Gold System in the Northern Appalachian Orogen

    By K. G. Thorne, L. J. Cabri, L. R. Fyffe, D. R. Lentz, D. Hoy

    "Mineralization at the Main zone of the Clarence Stream gold deposit in southwestern New Brunswick occurs within a parallel series of quartz veins that occupy a NE-trending, steeply north-dipping, bri

    Jan 1, 2008

  • CIM
    The Re-emergence of Resin in Pulp with Strong Base Resins as a Low Cost, Technically Viable Process for the Recovery of Uranium

    By Chris Fleming, John R. Goode, James Brown

    "Data will be produced from two uranium feasibility studies that were conducted in 2008, both involving uranium recovery from leached slurry by resin-in-pulp (RIP) with strong base resins. Excellent m

    Jan 1, 2010

  • CIM
    Unlocking Value through Flotation Equipment Maintenance

    By P. Tolvanen, A. Jalili

    "When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a

    Jan 1, 2015

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004