Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • CIM
    Method of Assessing Pillar Conditions in Salt Mines

    By H. Blaha, H. Wagner

    "Room and pillar workings in salt mines are preferred sites for underground waste disposal. A critical issue in selecting waste disposal sites is long-term behaviour of such workings. The long-term be

    Jan 1, 2015

  • CIM
    A First Step towards Gas Dispersion Management: Manipulation of Gas Distribution in Flotation Circuits

    By James A. Finch, Jason S. Doucet, Cesar O. Gomez

    "Exercising control over the physical environment of flotation as a step towards process optimization is the driving force for characterizing gas dispersion in flotation cells, a subject of considerab

    Jan 1, 2006

  • CIM
    Améliorations apportées au minage de la zone 1 à la mine Doyon

    By François Girard

    La zone 1 de la mine Doyon (zone altérée), se situe à l?extrémité sud de la mine et est constituée d?une série de veines étroites à fort pendage et ayant des épontes de très faible résistance. Les épo

    Feb 1, 2008

  • CIM
    Preparation and Characterization of Straight Y-Shaped Silica Nanorods by Thermal Chemical Evaporation Method

    By G. Zhu

    The straight Y-shaped silica nanorods have been synthesized on Si wafer by thermal chemical evaporation of mixed powders of silica and graphite at 1300_ and condensation on Si substrate without assist

    May 1, 2008

  • CIM
    Slag loss control with Bessemer mattes

    By P. Toscano

    The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv

    Jan 1, 2004

  • CIM
    Slag loss control with Bessemer mattes (7a7d6df1-1191-4a91-90b7-94a6293af197)

    By P. Toscano, T. A. Utigard

    "The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-con

    Jan 1, 2004

  • CIM
    A Mercury Determination Method and its Use for Exploration in British Columbia

    By J. J. Barakso, C. Tarnocai

    This paper outlines a method of testing for the mercury content of rocks, soils and plants. Techniques of sample collecting are described and the analytical procedures outlined. Examples are given of

    Jan 1, 1970

  • CIM
    Assessment of Acid Rock Drainage and Metal Leaching Risks at Barrick Gold Corporation

    Barrick Gold Corporation is the gold industry leader, with 25 operating mines and a pipeline of large, long-life projects located across five continents, in addition to large land positions on some of

    Jan 1, 2011

  • CIM
    Quantitative modelling of the segregation of magmatic sulphides: an exploration guide

    By P. C. Lightfoot, J. M. Duke, A. J. Naldrett

    "The segregation of magmatic sulphides from mafic and ultramafic silicate magmas, in many circumstances, leaves the magma with a lower-than-normal Ni/MgO ratio, which is characteristic of both lavas e

    Jan 1, 1984

  • CIM
    Outotec® Flash Smelting Technology Development

    By Jaana Romppanen, Satu Jyrkönen, Tiina Ranki, Peter Björklund, Markku Lahtinen, Kaj Eklund, Päivi Suikkanen

    Outotec is continuously developing our existing process equipment and new equipment solutions to enhance the Flash Smelting process. Thanks to the long operating history of the Outotec Flash Smelting

    Jan 1, 2019

  • CIM
    A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams Mine

    By David Evans, David Barnes, Robert Raponi

    "The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind

    Jan 1, 1997

  • CIM
    The St. Lawrence deposit, Seeley’s Bay, SE Ontario — A major wollastonite skarn in the Frontenac Terrane (ef6c9811-507f-4964-b191-8a798691efa4)

    By T. A. Grammatikopoulos, B. Vasily, A. H. Clark

    "The St. Lawrence deposit is a large wollastonite skarn (ca. 9 Mt @ 41.3% wollastonite) adjoining the gabbroic-to-syenitic Leo Lake pluton in the granulite facies Frontenac Terrane of the Grenvillian

    Jan 1, 2003

  • CIM
    A Simulation Model For Underground Roadway Development Processes

    By Ernest Baafi

    A simulation model RoadSIM using the ARENA modelling system has been developed to evaluate roadway development options for a given development panel configuration. The RoadSIM simulation system has pr

    Oct 1, 2009

  • CIM
    The Determination of Selection Elements and Lumped Parameters for Grinding Mills

    By A. L. Mular

    This paper provides a worthwhile contribution to the knowledge needed for calculating and using mathematical models of grinding circuits. The computer search algorithm proposed should remove much of t

    Jan 1, 1970

  • CIM
    CIP - Who Needs It? A combination circuit of Gravity, Flotation and Intensive Leach may provide the Optimal Environmental and Cost Outcome for Gold Plants.

    By Garry Johansen, Andrew McCallum, Sandy Gray, Gary Patrick, Jennifer Abols

    "The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold pro

    Jan 1, 2003

  • CIM
    Keys to successful monitoring of evaporite and coal mines

    By E. De Souza

    The instrumentation and monitoring of rock behaviour have played an important and necessary role in the practice of potash, rocksalt, gypsum, trona and coal mining. The art of rock instrumentation app

    Jan 1, 1998

  • CIM
    Applications of a Process Control Computer at Brenda Mines Limited

    By C. Larsen, E. Gratch, B. Flintoff, R. Bradburn

    "In 1973 Brenda Mines Limited first investigated the potential use of a process computer to aid in the development of a control system for the concentrator grinding circuit. This initial study and its

    Jan 1, 1978

  • CIM
    Mining Coal Under the Sea in Nova Scotia

    By Francis Gray

    Mr. F. W. Gray: It is not my intention to read my paper as it is too long, so I will touch only on the high lights. The Sydney field is the most favourable example of undersea coal mining that exists,

    Jan 1, 1927

  • CIM
    Melt Extraction of Gold Fibers and Precious Metal Doped Fibers and Preparation of Porous Gold Fiber Structures

    By Olaf Andersen

    Crucible melt extraction yields short metal fibers with eqivalent diameters as low as 50 µm from almost arbitrary metals and alloys. Highly porous components can be made from such fibers by suitable d

    Oct 1, 2003