Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Trends in Surface Drilling and Blasting

    By A. Bauer

    This paper describes the trends in recent years in explosives formulated to produce larger blast-hole spacings and over-all lower drilling and blasting costs in hard formations. A consideration of cur

    Jan 1, 1968

  • CIM
    The Internal Shaft at Dome Mines, Limited

    By Chas Kemsley

    NO. 6 shaft at Dome Mines, Limited, is an internal shaft going down vertically from the sixteenth, or 2,000-ft., level to the twenty-ninth, or 4,000-ft., level, with loading station and sump below thi

    Jan 1, 1938

  • CIM
    Removal and destruction of ammonia from a uranium plant effluent

    By P. A. Riveros, W. D. Gould, R. Molnar, D. W. Koren, P. Bédard

    This paper reports the results of the field demonstration campaign of a new process for removing and destroying ammonia from mining/ metallurgical effluent solutions. The 50-day campaign was carried o

    Jan 1, 2003

  • CIM
    The Flat Landing Brook Zn-Pb-Ag Massive Sulfide Deposit, Bathurst Mining Camp, New Brunswick, Canada

    By D. R. Lentz, J. A. Walker

    "Abstract -The Flat Landing Brook Zn-Pb-Ag deposit of the Bathurst Mining Camp occurs within a narrow thrust-bound nappe containing felsic volcanic and volcaniclastic rocks of the Tetagouche Group. Wi

    Jan 1, 2006

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit (4178b3ee-8316-4d7e-a069-b76cea76f353)

    By P. K. Frempong, S. D. Butt

    "A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is no

    Jan 1, 2004

  • CIM
    Geostatistical resource estimation for the Poura narrow-vein gold deposit

    A case study for the application of a novel geostatistical technique for resource estimation of a narrow steeply dipping, gold-silver mineralized quartz vein deposit is presented. The technique is nov

    Feb 1, 2004

  • CIM
    Selective desliming of sedimentary phosphate ores

    By G. W. Poling, E. M. Coelho

    "Sedimentary phosphate ores make up approximately 87% of the world's known reserves and are generally more difficult to beneficiate than igneous ores. In almost all cases, desliming prior to flot

    Jan 1, 1986

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • CIM
    An Automated Approach to Generating Haul Roads

    By S. Hill

    For a mining operation, the determination of the best place to build haul roads is typically done by hand, or with the assistance of rudimentary shortest path optimisation algorithms. Straight line, p

    Aug 1, 2013

  • CIM
    Radioactive Methods of Determining the Age of Minerals and Rocks

    By Alfred C. Lane

    WE recently received from Professor A. C. Lane, Emeritus Professor of Geology and Mineralogy, Tufts College, Mass., and a Corresponding Member of this Institute, a very interesting account of some rec

    Jan 1, 1938

  • CIM
    An Investigation in the Stand up Time of Stopesat Birchtree Mine in Thompson, Manitoba

    By Matthew Violot

    Introduction ?Located off highway 6, approximately 5 km, SW of Thompson, Manitoba ?Base metal mine: Nickel? Maximum Depth: 4100 ft ?Started Production in 1966 (INCO, 2006)?Halted in 1978?Re-opened

    Nov 1, 2011

  • CIM
    Investigation of Method of Addition of Surfactant to the Pressure Leaching of Nickel-Containing Pyrrhotite Concentrates

    By E. M. Timoshenko, A. V. Tarasov

    The results of laboratory, bench-scale and semi-commercial investigations of a method for adding surfactant (technical-grade lignosulphonate) to the process of pressure leaching of nickel-containing p

    Jan 1, 2004

  • CIM
    Gas Dispersion Management In A Copper I Molybdenum Separation Circuit

    The effect of superficial gas rate distribution (Jg profile) on down-the-bank metallurgical response was tested in the rougher-scavenger bank (eight 10-m3 tank cells, 4 roughers and 4 scavengers) at H

    Jan 1, 2007

  • CIM
    Engineering, Construction and Project Management of Ambatovy Nickel Project

    By Ed McConaghy, P. LaRochelle

    The Ambatovy Nickel Project comprises the development of mine, hydrometallurgical processing facilities and necessary infrastructure in Madagascar, positioning Ambatovy as one of the world’s largest p

    Jan 1, 2015

  • CIM
    Thermodynamic Modeling of Copper Chloride-Containing Systems in High Temperature Processes

    By P. Taskinen, D. Lindberg, H. Viitala

    The formation of copper chlorides in flue dust or deposits in heat recovery boiler of copper smelters or waste-fired boilers may lead to formation of corrosive partially molten deposits on walls and h

    Jan 1, 2019

  • CIM
    High resolution magnetic anomaly maps from ERLIS compilation: An example from Kirkland Lake

    By S. Manning, W. Morris

    Mineral exploration assessment file information has long been considered a useful resource for developing mineral exploration strategies, and one of the most common data sets fled in assessment report

    Jan 1, 1997

  • CIM
    Notes on Coal Cleaning

    By Harry Wilton-Clark

    Introduction Coal cleaning may be taken as meaning the separation of coal-as-mined into two or more fractions. Coal cleaning includes coal washing, together with any other means used in the ultimate

    Jan 1, 1934

  • CIM
    Assessment of Energy Efficiency and GHG Emissions for Iron- and Steel Production

    By Freislich. M., Y. Gordon

    "In the changing global market scenario for raw materials for the steel industry, a number of novel iron- and steelmaking process technologies are being developed to provide the steel companies with e

    Jan 1, 2012

  • CIM
    Precious-Metal-Bearing Volcanogenic Massive Sulphide Deposits, Campo Morado, Guerrero, Mexico

    By Robert Cluff

    The Campo Morado precious-metal-bearing, volcanogenic massive sulphide district occurs in a Lower Cretaceous felsic volcanic sequence in a northerly trending belt in the Guerrero Terrane in northeaste

    May 1, 2006

  • CIM
    Reducing maintenance costs through predictive fault detection

    By Y. Faitakis

    In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis.

    Jan 1, 2004