Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Investigation of a complex rock slope displacement at Brenda Mines

    By Peter N. Calder, Garston Blackwell

    "The history and analysis of a structurally complex open-pit rock slope displacement are described. The failure involved part of the only haulage access to a major ore zone. The ongoing movement was m

    Jan 1, 1980

  • CIM
    Vehicle Mobility Performance in Muskeg A Second Report

    By J. G. Thomson

    Development of the Canadian North, a subject of growing national interest, must in part await the development of better forms of trans-port. The estimated 500,000 square miles of muskeg terrain in the

    Jan 1, 1961

  • CIM
    Performance of Rock Slopes during the 2010/11 Canterbury Earthquakes (New Zealand)

    By G. Archibald, M. McSaveney, J. Wartman, M. Yetton, C. Massey, C. Holden, A. Kaiser

    "The 2010/11 Canterbury earthquakes triggered many mass movements in the Port Hills including rockfalls, rock and debris avalanches, slides and slumps and associated cliff-top cracking. The most abund

    Jan 1, 2015

  • CIM
    The Electric Mining Shovel - Designed for Digging

    By K. D. Bulin

    "An interesting brief history review of shovels as the primary excavating tool will permit the reader to see that immeasurable development and resources have preceded the shovel excavators which today

    Jan 1, 1973

  • CIM
    Quantifying Solidification Path in Rapid Solidification Using 3D Measurements

    By Hani Henein

    Most metals and alloys processed undergo a solidification processing step. Increasingly, there is a growing number of solidification processing routes that involve rapid solidification of the alloy.

    Jan 1, 2016

  • CIM
    Effect of Mechanical Twinning on the Flow Stress of a Magnesium Alloy Sheet during Strain Path Changes

    By A. Jain

    During sheet forming, metal experiences not only multi-axial load, it also undergoes strain path changes. For example, metal in the flange region may be drawn, may bend and unbend through a bead, befo

    Jan 1, 2006

  • CIM
    Electrical Power Cables as Applied to Mining Projects

    By C. F. Starr

    This paper deals with the various types of cable in use in mines, with special attention paid to their construction. There will be a few comments regarding the different insulants, jacketing materials

    Jan 1, 1969

  • CIM
    Geology of the QR gold deposit, Quesnel River area, British Columbia

    By P. E. Fox, R. S. Cameron

    "The QR gold deposit lies in the Cariboo plateau region of central British Columbia. The deposit was discovered in 1977 and since then a mineable reserve of 1.3 million tonnes grading 4.7 g/t Au has'

    Jan 1, 1995

  • CIM
    Modelling the high pressure leaching of laterite using Aspen Plus and OLI

    By V. G. Papangelakis, M. Cheung, M. Dry

    The high pressure acid leaching of laterite was modelled and simulated using a combination of two commercially available software packages, namely Aspen Plus 11.1 and the OLI Stream Analyzer. New kine

    Jan 1, 2005

  • CIM
    Communicating Geological Engineering Results to Manage Slope Instability

    By R. Yost

    "This paper describes a case study that illustrates how detailed geological engineering results were communicated to address a range of stability challenges in a producing mining environment. Instead

    Jan 1, 2017

  • CIM
    The Application of Neutron Activation Analysis to the Determination of Copper in Minerals

    By H. P. Dibbs

    An account is given of the application of neutron activation analysis to the rapid, non-destructive determination of copper in minerals, using a 14-MeV neutron source. Elements that interfere in the d

    Jan 1, 1970

  • CIM
    Scale Prevention in the Presence of High Solid Slurries

    By Laura A. Sanders

    Mineral scale formation is prevalent in numerous mining operations. Such scale formation can occur in the direct-contact heat exchangers ahead of an autoclave. In these heat exchangers, the incoming s

    May 1, 2013

  • CIM
    Uranium extraction from saline solutions using weak base anionic resins

    By K. Soldenhoff, M. Fainerman-Melnikova

    The use of strong base resins for uranium recovery is severely affected by the presence of chloride ions in solution. In areas where high-quality process water is not readily available, the use of sal

    Jan 1, 2012

  • CIM
    Administration Building Miners? Change-Rooms and General Offices of the McIntyre Porcupine Mines, Limited

    By Angus D. Campbell

    Introduction In the Twentieth Annual Report of the Mcintyre Porcupine Mines, Limited, for the year ending March 31st, 1932, the General Manager, Mr. R. J. Ennis, said: "During the period under revie

    Jan 1, 1933

  • CIM
    Improving the Flotation Circuit Performance Using Empirical Simulation at Nunavik Nickel Concentrator

    By J. Bouchard, A. Clapperton, L. Ebacher, N. Singh

    "Canadian Royalties Inc. owns and exploits the Nunavik Nickel project: a copper and nickel deposit in Nunavik, Quebec. Froth flotation is used to produce nickel and copper concentrates. As is the case

    Jan 1, 2018

  • CIM
    The Effects of Thermal History on Mine Climate Simulation Results

    By G. Danko, C. Lu

    "High temperature and humidity at the working negatively affect safety and health in deep and hot underground mines. It is necessary to predict during design the dynamic changes in temperature with he

    Jan 1, 2019

  • CIM
    A Computer-Assisted National Coal Inventory

    By J. A. Irvine

    In 1972, a cooperative program to map and estimate the quantity of Tertiary coal resources in southern Saskatchewan was initiated by the federal and Saskatchewan governments. More than 700 exploratory

    Jan 1, 1978

  • CIM
    Operation Optimization and Capacity Expansion in Jinlong Copper Flash Smelter

    By Z. Jun, L. Kerning

    Jinlong copper smelter and refinery, originally designed for 100,000tpa primary copper and started up in 1997, has been expanding its capacity on the basis of operational optimization and by modifying

    Jan 1, 2007

  • CIM
    Guyana Goldfields Flagship Aurora Project – Road to Success

    By Jon Errey, Aleksandar Petrovic, Karl Haase

    "Developing a gold deposit of this magnitude in the Amazonian jungle of Guyana posed many challenges. This paper describes not only the process & logistical challenges arising from the remote mine sit

    Jan 1, 2016

  • CIM
    Developing Maintenance Plans Designed to Reduce Efficiency Losses in Fired Equipment

    By Jason J. Ballentine

    This case study presents the results of a maintenance review of a soot blower system at a coal fired power generation station. The power generation station was following a ?repair when it breaks? main

    May 1, 2007