Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Metallurgical Processing Plant Ramp-Up Periods ù How to Reap the æRewardsÆ

    Fundamentally, the development of a minerals processing project is a very risky enterprise. Most mining companies do not have sufficient financial resources to undertake significant projects and hence

    Jan 1, 2003

  • AUSIMM
    Discharge Chemistry From Above-Drainage Underground Mines in 1968 and 2000

    By J Demchak, L M. McDonald

    The duration of acid mine drainage flowing out of underground mines is important in the design of watershed restoration and abandoned mine land reclamation projects. People conducting land reclamation

    Jan 1, 2003

  • AUSIMM
    Water for a Sustainable Minerals Industry ù A Review

    This paper summarises the results of a study carried out for the Sustainable Minerals Institute, University of Queensland, aimed at identifying the major water-related issues facing the minerals indus

    Jan 1, 2003

  • AUSIMM
    Use of an Intact Core and Stable-Metal Isotopes to Examine Leaching Characteristics of a Fluvial Tailings Deposit

    By K S. Smith, B P. Jackson, P J. Lamothe

    The upper Arkansas River south of Leadville, Colorado, USA, contains deposits of fluvial tailings from historical mining operations in the Leadville area. These deposits are possible non-point sources

    Jan 1, 2003

  • AUSIMM
    Alluvial Sapphire Mining in the New England Region of New South Wales (The AuslMM Annual Conference Rotorua New Zealand 1990)

    By DAVID C LAURENCE

    The richer, shallower sapphire deposits of the New England region of New South Wales which have been traditionally mined by the small miner are almost worked out. Larger mining and exploration compani

    Jan 1, 1990

  • AUSIMM
    Paper No. 188. A Graphic Method of Computing Mine Values.

    THOSE who have had occ.asion to sample a mine not infrequently find that it is impossible to take their sample cuts at regular distances apart, owing to the ground being close timbered, a stope having

    Jan 1, 1911

  • AUSIMM
    The Inclusive Management of Operating Risk, Efficiency and Organisational Dynamics at the Cosmo Howley Mine

    By Johnson G. D

    The typical management systems used to address the issue of operating risk centre around technologies that identify, analyse and evaluate the risk factors. These logical systems such as HAZOPs, Faul

    Jan 1, 1994

  • AUSIMM
    Moving Broken Hill into the Third Dimension

    Pasminco is actively addressing the optimal utilisation of the known orebody at the Broken Hill mine, in addition to actively exploring for economic mineralisation in the region. As part of the poli

    Jan 1, 1997

  • AUSIMM
    Proportion of Energy Attributable to Comminution

    By G R. Ballantyne, M S. Powell, M Tiang

    This paper reviews the proportion of energy attributable to comminution within the Australian gold and copper mining sector. The need for this is motivated by inconsistencies in the quoted energy usag

    Oct 29, 2012

  • AUSIMM
    EastLink Tunnel - Permanent Concrete Lining and Waterproofing Design

    By E Taylor, F Lebbing

    The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid

    Jan 1, 2008

  • AUSIMM
    Keynote Address The Problems of Strong Roof Beds and Water Bearing Strata in the Control of Longwall Faces

    The difference between a hypothetical and a theoretical approach is considered and the advantages in using a hypothesis is discussed. Virgin horizontal stresses play an important role in stabilisin

    Jan 1, 1986

  • AUSIMM
    Geostatistical Evaluation of A Beach Sand Rutile Deposit

    This study begins with the semivario- gram modelling of variables rutile grade and clay content from a beach sand rutile deposit. This is followed by two dimensional block kriging. The deposit was

    Jan 1, 1986

  • AUSIMM
    Modern Technology Applied to Wirebar Casting

    By Hunter T. C

    The wirebar furnacing and casting facility commissioned in 1970 at Copper Refineries Pty. Ltd. (CRL), Townsville, comprising a 70 tonne/ hour ASARCO shaft furnace and a Walker type casting wheel, c

    Jan 1, 1977

  • AUSIMM
    Thermal Degradation of Lump Ore in the Top Shaft of Blast Furnaces

    By M Kilburn, A Edenton, M Adam, A Dehghan-Manshadi, R Smyth, L Lu

    The blast furnace is a counter current reactor. The counter current principle of the furnace makes it very efficient in transferring the heat and mass required to drive the reduction reactions inside

    Aug 12, 2013

  • AUSIMM
    Excavation Design and Mining Methods in the 1100 Orebody, Mount Isa Mine, Australia

    By Sullivan BJK

    The 1100 orebody is a massive copper sul- phide orebody which contains a major portion of the Isa Mine copper ore reserves of 130 million tonnes at 3.2%. The underground mining of a deposit as larg

    Jan 1, 1978

  • AUSIMM
    On the Planning of Underground Storage of Stormwater and Mechanical Boring of Sewer Shield Tunnelling in Tokyo

    Tokyo Metropolitan Government designs the stormwater storage plans in underground, as a measure of flood control in completed urban district and improvement of combined sewarage system. This time,

    Jan 1, 1987

  • AUSIMM
    Effect of Dissolved Gas on the Force Between Silica and Glass in Aqueous Ocyadecyltrimetylammonium Chloride Solutions

    By W A. Ducker, R-H Yoon, M Mao

    Froth flotation relies on an attractive force between a particle and a bubble to selectively extract particles from a mixture. The range and magnitude of this attractive force is an area of ongoing in

    Jan 1, 2005

  • AUSIMM
    Water Management to Protect Wetland to the North of the Rhenish Lignite District

    By Trumpff H

    Opencast Lignite Mining requires topwall strata of seams to be fully depleted and footwall aquifers sufficiently depressurized. To prevent a spread of the cone of depression into protected wetlands

    Jan 1, 1988

  • AUSIMM
    Geological Structure of the West Area Pit, State Coal Mines, Wonthaggi

    This paper is written as a supplement to that of Edwards, Baker and Knight on "The Geology of the Wonthaggi Coalfield" 1, the West Area pit being in an early developmental stage at the time

    Jan 1, 1953

  • AUSIMM
    Cooperative Strategies for Businesses with Particular Focus on Kwinana

    By B McIntosh

    Sustainability in its simplest assessment has been defined as æmeeting the needs of the present without jeopardising the needs of future generationsÆ. For the mining industry alone, this statement cou

    Jan 1, 2004