Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone Mine

    By A Sinuhaji, R Poedjono, G Flumerfelt

    PT Freeport Indonesia is currently building the DOZ mine. It is a 25 000 tonne/day block caving operation which is scheduled to reach designed production levels by the fourth quarter of 2002. This pap

    Jan 1, 2002

  • AUSIMM
    Process Control and Flocculant Optimisation of Tailings Thickeners at PT Freeport

    By M Simanjuntak, A M. Supomo

    PT Freeport IndonesiaÆs copper/gold operation disposes of approximately 222 000 dry metric tonnes of tailings per day via two thickeners. Reduction of the flocculant dosage rates in each of the tailin

    Jan 1, 2003

  • AUSIMM
    Long Shaft ù A Deep Level Mining Success Story

    By G McLeay, T Moran

    Long Shaft has traditionally been seen as one of the most challenging mines in the Kambalda area with operations having been suspended by the previous owners in 1999. When mining recommenced in Octobe

    Jan 1, 2005

  • AUSIMM
    Electrolytic reduction of metal sulfides/oxides in molten salts for sustainable metal production

    By X Hu, J Björkvall, L Sundqvist Ökvist

    The metal production industry is a significant contributor to global CO2 emissions due to the use of fossil fuels such as coal and coke. To mitigate these emissions and meet climate goals, innovative

    Jun 19, 2024

  • AUSIMM
    The Geology of the Eloise Copper-Gold, Deposit, NW Queensland, Australia

    By T. Baker

    The Eloise Cu-Au deposit is 60 km SE of Cloncurry in NW Queensland and has a current indicated reserve of 3.2 Mt @ 5.8 per cent Cu, 1.5gA Au and I9g/t Ag. It is hosted by metasediments and metabasic

    Jan 1, 1994

  • AUSIMM
    Exploring two approaches for real-time measurement of frother concentration

    By H Park, D J. Holland, L Wang, Y Matviychuk, Y Lee

    Reuse of process water in mineral and coal flotation plants is widespread to effectively reduce freshwater consumption. However, the accumulation of the frother in the recycled process water is a grow

    Aug 24, 2022

  • AUSIMM
    Simulating Mine Backfill in a Fully Drained Condition Using Discrete Element Modelling

    By A Karrech, A Hasan

    This paper presents the numerical simulation of mine backfilling in underground stopes using three-dimensional discrete element modelling (DEM). The simulation predicts the forces exerted at the stope

    Nov 5, 2014

  • AUSIMM
    Performance of Different Constructive Solutions against Explosions in Full-scale Masonry Walls

    By M Chiquito, R Castedo, P Segarra, L M. López, J A. Sanchidrián, J Navarro

    The aim of this work is to assess the performance of different constructive solutions against explosions on the strength of masonry walls. The solutions tested, namely an external metal mesh, a glass

    Aug 24, 2015

  • AUSIMM
    Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW Process

    The Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.

    Jan 1, 1993

  • AUSIMM
    The Automation of Western Mining Corporation's Olympic Dam Underground Rail Haulage System

    By D Mee

    The Western Mining site at Olympic Dam, near the community of Roxby Downs in South Australia is one of the largest orebodies of its type in the world. It contains known reserves of over 10.6 M tonne o

    Jan 1, 2000

  • AUSIMM
    Floating a Mining Company in the 1980s

    Although mining, particularly of gold and coal, played a significant role in the development of New Zealand, from the time of the spectacular gold rushes of the 1860s its economic importance to the co

    Jan 1, 1982

  • AUSIMM
    The Role of On-Line Analysis and Control in Sustainable Minerals Processing

    By B D. Sowerby, N G. Cutmore

    Improved process control can be achieved through the accurate and reliable on-line measurement of critical process parameters in real time. Over the past few decades on-line analysis techniques have b

    Jan 1, 2002

  • AUSIMM
    Palaeomagnetic, Tectonic, Magmatic and Mineralisation Events in the Proterozoic of Northern Australia

    By Wyborn L. A I, Idnurm M, Hinman M. C

    Comparison of the Proterozoic Apparent Polar Wander Path (APWP) for Australia with the corresponding geology of northern Australia suggests that a number of discrete interplate tectonic events, mani

    Jan 1, 1994

  • AUSIMM
    Vision 2040 – Mining Technology, Policy and Market Innovation

    By D Giurco

    This paper presents the results from research undertaken in the CSIRO-funded Mineral Futures Collaboration Cluster on developing a future vision for the mining and minerals industry – Vision 2040 – in

    Nov 22, 2011

  • AUSIMM
    Development of a Near Field Damage Model for Cemented Hydraulic Fill (MINEFILL '98)

    By Chitombo GPF

    The dilution of blasted ore with cemented backfill materials has been recognised as a significant factor influencing the economics of some underground metalliferous mining operations. Several mechan

    Jan 1, 1998

  • AUSIMM
    Coupled phase diagram experiments and thermodynamic modelling of the CaO-SiO2-Ga2O3 system for Ga recycling

    By I H. Jung, W O. Choe

    Gallium (Ga)-containing compounds such as Gallium Arsenide (GaAs) and Gallium Nitride (GaN) are widely used in electronic devices due to their superior electro-optical properties and their usages incr

    Jun 19, 2024

  • AUSIMM
    Further investigations into the relationship between the non-ideal behaviour of a particle-collector aggregate as determined using partial molar excess Gibbs energy and its hydrophobicity

    By K C. Corin, C T. O’Connor

    In recent years it has been shown that the concept of using partial molar excess Gibbs energy (G̅ex) to explain the behaviour of collectors in the recovery of minerals can be usefully applied to expla

    Aug 24, 2022

  • AUSIMM
    Laboratory Corrosion Tests of Frictional Rock Bolts

    By D W. Airey

    Frictional rock bolts are widely used because of their low cost. However, they have a thin wall section that makes them prone to corrosion, and they cannot be relied on to provide long-term ground sup

    Nov 5, 2014

  • AUSIMM
    Smart Solution to a Sticky Problem ù In-Mine Clay Mapping Using High-Resolution Geophysics

    By P J. Hawke

    Within the Mesa J pisolitic iron ore mine, clay is distributed unevenly throughout the deposit and often forms as pods and channels less than 10 m in width. The mine resource model, based on 50 m + 50

    Jan 1, 2002

  • AUSIMM
    Lump Ore Characteristics and their Impact on Blast Furnace Operation

    By S Hapugoda, A Edenton, M Adam, R J. Holmes, J R. Manuel, R Smyth

    Lump ore is one of the key ferrous feeds used in the blast furnace ironmaking process, normally accounting for ten to 20 per cent of the blast furnace burden. Like other feeds, the characteristics of

    Jan 1, 2009