Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Stabilisation of Large Scale Spoil Piles in Deep Open Strip Coal Mines

    By Eckersley J, Boyd G

    A brief review is presented of the mechanisms and causes of spoil pile failures which have occurred at the Goonyella Mine. In particular, the results of a recent geo- technical investigation of the

    Jan 1, 1981

  • AUSIMM
    Channel Iron Deposits (CID) of the Hamersley Province (Western Australia)

    By R C. Morris

    The channel iron deposits (CID) (Ramanaidou, Horwitz and Morris, 1991; Morris, Ramanaidou and Horwitz, 1993; Ramanaidou, Morris and Horwitz, 2003; Morris and Ramanaidou, 2007) are one of the two major

    Jan 1, 2007

  • AUSIMM
    The Wellington Dam Catchment - A Water in Mining Case Study

    The Wellington Dam catchment has high value water, agriculture and coal and power generating resources. These conflicting land uses are managed through consultation and regulation. The Wellington Dam

    Jan 1, 2006

  • AUSIMM
    Geohydrological Containment System and Microbial Water Treatment Plant for Metal-Contaminated Groundwater at Budelco

    By Buisman C. J N, Koch R. O

    Soil and groundwater beneath the Budelco zinc production plant at Budel-Dorplein (The Netherlands) are contaminated with metals and sulphate. To avoid contamination of nearby drinking water aquifers

    Jan 1, 1993

  • AUSIMM
    Argyle Diamond Mine Open Pit

    By Wall J, Platell R, Knight P

    The Argyle diamond mine is located in the East Kimberley area of Western Australia, some 100 km south of the town of Kununurra. The diamondiferous Argyle olivine-lamproite diatreme was discovered in

    Jan 1, 1994

  • AUSIMM
    Developments in Coal Mine Tailings Disposal and Rehabilitation

    The conventional approach to the disposal of fine coal mine tailings, which involves piping the tailings as an aqueous slurry to a storage where they remain in the form of a permanent wet deposit,

    Jan 1, 1991

  • AUSIMM
    Construction of the Brunswick Street Rail Tunnels

    The paper, one of two papers on the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling conference, describes documentation, tendering and construction aspects.Ten

    Jan 1, 1993

  • AUSIMM
    Direct Reduction of PbS with C and CaO Thermodynamics and Kinetics

    By Lee H. G, El-Rahaiby S. K

    The literature relating to reduction of sulphides by carbon using lime as sulphur-absorbent is reviewed. A stage-wise thermodynamic model is employed to evaluate the practical feasibility of the direc

    Jan 1, 1991

  • AUSIMM
    Paleoichnology of Uncia Formation (Silurian) ôLa Cumbreö Zone from ôRealö Andean Belt. Department of La Paz, Bolivia

    By Marquez W

    Trace fossils have been found in Bolivian Silurian sediments in "La Iumhre" area close to La Paz-Bolivia.Tracks, are good indicators of depth and environment. A detailed study of the ichnogenus is ma

    Jan 1, 1990

  • AUSIMM
    Mechanised Tunnelling Technologies for Mining Applications

    The increasing global demand for rough materials forces almost every mine to look at the mechanisation in their processes. This will not onlyimprove performance but with safety issues becoming more an

    Jan 1, 2008

  • AUSIMM
    The Geology of the Wonthaggi Coalfield, Victoria

    By Knight J. L, Baker G

    The Wonthaggi coalfield is in South Gippsland, about 90 miles southeast of Melbourne. It is situated on the down-faulted block of the South Gippsland highlands that lies south of the Kongwak fault, be

    Jan 1, 1944

  • AUSIMM
    Study of the Adsorption of Metal Ions onto Pyroxene

    By V Malysiak, N J. Shackleton

    In the flotation of platinum group minerals pyroxene is a major gangue mineral. This study shows using zeta potential and ToF-SIMS analyses that when pyroxene is exposed to copper, nickel and/or calci

    Jan 1, 2005

  • AUSIMM
    Mineral Fuels Alternatives and the Greenhouse Effect

    Distillation of the large and growing greenhouse literature indicates that: ò Global warming has occurred over the past century or more; ò Build-up of CO2 (and lesser greenhouse gases) in the atmos

    Jan 1, 1989

  • AUSIMM
    Ancestral Pacific Margins in Eastern Australia Some Lessons from the Modern Pacific Rim

    By Mallett CW, Hammond RL

    Geological maps of the Pacific Rim recently published by the Circum-Pacific Council for Energy and Mineral Resources have provided a useful perspective from which to view modern plate interaction

    Jan 1, 1987

  • AUSIMM
    Modelling for Large Primary Tin Deposits

    Ore deposit modelling is becoming an increasingly accepted tool in mineral exploration. Successful models have already been proposed for several ore deposits of base metals and gold, but tin has s

    Jan 1, 1986

  • AUSIMM
    Developments at MHD 'Berzelius' Duisburg

    By Tack K

    During its 28-year life the MHD ISP smelter has gone through two phases, each of about a dozen years. The first phase was a learning one; in the second phase the lessons were applied and throughput

    Jan 1, 1993

  • AUSIMM
    The Mining of J Lens

    By Reeves I. And Farquhar J, Pearce S

    The irregular shape of the Rosebery orebody, coupled with the inconsistencies in grade over short strike lengths, has meant stoping blocks have had to be small to combat dilution and stability probl

    Jan 1, 1993

  • AUSIMM
    Evaluation of Cyclical Voltammetry as an Electrolyte Screening Technique

    By Grady B. V O, Cavell K. J, Ault A. R, Newman O. M G, Malcolm J. McPhersqn

    Cyclic voltammetry (CV) has been evaluated as a technique for monitoring the quality of an industrial zinc sulphate electrolyte. The basis of the method involves measuring a change in the polarisati

    Jan 1, 1993

  • AUSIMM
    The Application Of Drag Pick Rock Cutting Machines In Metalliferous Mining

    Drag pick roadheaders and continuous miners have been applied in the coal mining industry for several decades, having replaced drill-blast methods as the primary means of excavating coal and coal-

    Jan 1, 1987

  • AUSIMM
    No. 3 Shaft Sub-Brace Area

    With the sinking of the No. 3 Shaft and the erection of a changehouse nearby, a sub-brace level structure was provided incorporating a time office, underground foremenÆs office and lamp room, in conju

    Jan 1, 1957