    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    New Technology for Management and Security of Exploration and Mining Information

    A hidden asset in most exploration and mining activities is data. Common practice involves the spending of large amounts of money to discover, define and prove the viability of a mining project. Some

    Jan 1, 1999

  • AUSIMM
  • AUSIMM
    A methodology for assessing stope design modifying factors for the Olympic Dam Mine

    By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant

    The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order

    Mar 15, 2021

  • AUSIMM
    Dynamic grade control modelling processes at the Waihi Underground Gold Mine

    By A Whaanga, W Vigor-Brown

    IGO Ltd’s (IGO’s) Nova-Bollinger Deposit (Nova-Bollinger) is a magmatic nickel-copper-cobalt (NiCu-Co) sulfide deposit found 160 km east-north-east of the town of Norseman in Western Australia (WA). T

    Mar 22, 2022

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Advances in In Situ Testing of Ventilation Control Devices for Underground Mines

    By M Salu, G J. Kay

    "As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id

    Jun 1, 2012

  • AUSIMM
    What category cyclone is devastating your plant?

    By T G. Vizcarra, B Wong

    Optimisation projects are regularly undertaken without knowing the root cause of an issue. It is all well and good to trial a multitude of flotation reagents, change the operating characteristics of y

    Aug 29, 2018

  • AUSIMM
    Ore variability and process plant performance – the impacts to revenue

    By A Millar, B Wraith

    Process plants are characterised by variability of performance over a wide range of time-scales; reflected in fluctuations in metal recovery, concentrate grade, plant throughput and reagent costs. In

    Aug 24, 2022

  • AUSIMM
    Unlocking resource confidence in coal through use of conditional simulation

    By B Haase, R Saha

    Conditional simulation (CS) has been extensively used in metal industry to assess uncertainty of geo metallurgical variables to build robust distributions around grade tonnages across different time h

    Mar 22, 2022

  • AUSIMM
    Stakeholder Engagement – Who Are You, What Do You Stand for and Why?

    By R M. Lonsdale, M D. Goodz

    "With an ever-increasing dynamic business environment, successful stakeholder engagement is becoming more fundamental to achieving desired outcomes in today’s mineral resource industries. It is impera

    Jun 22, 2016

  • AUSIMM
    Production at Lift 530 m of Tongkuangyu Copper Mine

    By K W. Bian, Y M. Liu

    Tongkuangyu Copper Mine is currently the only mine in China employing block caving. It comprises two large orebodies known as the No 4 orebody and the No 5 orebody. They are approximately 50° in

    May 9, 2016

  • AUSIMM
    Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines

    By P Moarefvand, M Osanloo

    The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela

    Sep 26, 2011

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    Regional scale structural influence on the Ernest Henry orebody below current mining levels

    By E Philippa, B Miller

    Material characterisation, ore sequencing and process capability are commonly regarded as the key parameters to consider in designing and operating an effective pit to plant supply chain. Therefore, a

    Mar 22, 2022

  • AUSIMM
    Monitoring Haul Truck Operator Fatigue Using Gyroscope Data

    By L van Latum, A Koh, I Thomas

    Haul truck drivers are at a high risk of developing fatigue due to the monotonous nature of the work and demanding shift rosters. In the mining industry, fatigue is identified as a major contributing

    Sep 26, 2011

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Costerfield – a Narrow Vein Case Study

    By M McCarthy

    Over the last six years Mandalay Resources has increased production rates and improved safety outcomes at its Costerfield mine in Victoria, Australia. This mine is an underground operation utilising n

    Jun 22, 2016

  • AUSIMM
    Truck Haulage Improvements at the Phu Kham Mine – the Journey to 97 per cent Utilisation of Availability

    By S P. Young, K R. Monro

    Reducing metal prices have forced mining operations to become more efficient and innovate in order to do more with the existing base. Much of this effort has focused on improving the efficiency of loa

    Jun 22, 2016

  • AUSIMM
    Understanding Ore Characteristics and Equipment Selection

    By K T. Broekman, R L. Koenig

    "The Braemar Iron Formation is atypical ore when compared to the current magnetite ores being processed. In attempting to process and economically recover the vast quantities of iron ore stored within

    Aug 12, 2013