Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mineralogical Evaluation of PGE Behaviour in Fe-Ni-S and Cu-Ni-S Mattes and Fayalite Slag: Geological Implications

    By Selischop F, Tredoux M

    The distribution of platinum-group elements (pGEs) has been investigated in matte and slag samples from Waterval Smelter (Rustenburg Platinum Mines). The study showed that a strong preference of PGEs

    Jan 1, 1994

  • AUSIMM
    Conditions for Caving

    The mechanism of caving is of interest to the mining engineer only in areas where he is directly concerned. One area is surface subsidence which is outside the scope of this paper. Another area is a

    Jan 1, 1974

  • AUSIMM
    Surface Monitoring, Understanding and Modification at Molecular Level in Mineral Beneficiation by Infrared External Reflection Spectroscopy

    By E Mielczarski

    Determination of the adsorbed layer composition and structure at molecular and atomic levels and understanding adsorption mechanisms and dynamics are vitally important for the preparation of surface l

    Jan 1, 2005

  • AUSIMM
    Optimising Moisture Control for Zinc - Lead Sintering

    By Bowden MW

    Sintering of lead-zinc concentrates is practised by Sulphide Corporation to provide both desulfurised lump sinter feed, for simultaneous reduction to zinc and lead in the Imperial Smelting Process bla

    Jan 1, 1985

  • AUSIMM
    The Changing Influences on the Economics of Developing New Underground Coal Mines in New South Wales

    This paper examines the cost and economic consequences of varying a number of key factors in the course of developing and operating new underground longwall coal mines with both shallow and deep cov

    Jan 1, 1988

  • AUSIMM
    Epithermal Gold Prospects in the Conway Area, Northern Drummond Basin, Queensland

    By Hoffmann CF, White NC, Tedder IJ, Wood DG

    Since the discovery of Pajingo in 1984, the northern Drummond Basin has emerged as a significant new gold province, and has become the focus of intense exploration for epithermal gold mineralisation.

    Jan 1, 1990

  • AUSIMM
    Probability Analysis of Rock and Soil Slopes in a Complex Geology Environment

    In the stability assessment of open pit walls, geotechnical engineers have to deal with uncertainty related to structural geology, rock mechanical parameters, groundwater and so on. This uncertainty

    Jan 1, 1997

  • AUSIMM
    The Derivation of Thermodynamic Properties of Slags from Slag Fuming Plant Data

    A Kellogg type computer model of the slag fuming process is applied in reverse to derive some thermodynamic properties of components in lead blast furnace slag. At 1200¦C, the average activity coe

    Jan 1, 1980

  • AUSIMM
    Reconciliation at KCGM Fimiston Operation

    By T Berryman

    The Fimiston reserve is being depleted at the rate of one million ounces per year; most of which is processed by the Fimiston plant, with the remainder being stockpiled. As for most other large open c

    Jan 1, 2006

  • AUSIMM
    Sheet Flotation - Two Dimensional Packed Columns

    By Williams M

    Sheet flotation is a new two dimensional column flotation cell that produces continuous spectrum of products. Analogous to a shaking table in its performance and analysis, sheet flotation is a sheet

    Jan 1, 1993

  • AUSIMM
    Exploration Philosophy and Future Trends

    Projections of metal requirements for Japan and the United States indicate growing competit- ion for Australia's mineral output and a critical need for continuing discovery of new reserves. Th

    Jan 1, 1973

  • AUSIMM
    An Investigation into a Water Inflow at Wongawilli Colliery, Southern Coalfield, New South Wales

    By Poole GR

    An unusually high flow of water from an oxtr.iction panel in Wongawilli Colliery pr,;npted the investigation of the possible sources of the water. It is more probable that water is derived f r,m s

    Jan 1, 1986

  • AUSIMM
    The Commercial Evaluation of Coal Properties

    In preparation of this Paper, the emphasis has been laid on the commercial rather than on the technical and scientific aspects of coal evaluation. It is intended to describe and comment on the princi

    Jan 1, 1975

  • AUSIMM
    Mathematical Modelling of the Convergence and Vertical Stress Patterns Around a Longwall Panel in New South Wales

    By Pattinaja MA

    Mathematical modelling was carried out to determine the probable convergence and vertical stress patterns around a retreating longwall panel in an underground coal mine in New South Wales. An &apo

    Jan 1, 1986

  • AUSIMM
    Process design and commissioning of the Goedehoop coal processing plant

    By Swann CA

    In order to meet export sales requirements from 1983 onwards, Amcoal developed a new underground mine in the Witbank area of the Transvaal. The mine was required to produce 5 million tons of run o

    Jan 1, 1986

  • AUSIMM
    Olympic Dam: Some Developments in Geological Understanding Over Nearly Two Decades

    The Olympic Dam copper-uranium-gold-silver deposit, located approximately 520 km north-northwest of Adelaide, South Australia (Figure 1) was discovered in 1975 by Western Mining Corporation. A joint v

    Jan 1, 1993

  • AUSIMM
    A Case Study into the Treatment of Low Grade Austalian Gold Ores Heap Leaching vs Carbon-in-Pulp

    By Noakes MJ, Willsteed TV

    In the past few years an elevated gold price has resulted in the evaluation of many small scale surface gold deposits in Australia typically containing about 2-3 g/t Au. Operators have tended to assum

    Jan 1, 1984

  • AUSIMM
    Methane Drainage in Underground Coal Mines in China

    By Boshou B

    In China, there are approximately 3,000,000 million m3 of gas (methane) included in highly gassy mines liable to coal/gas outbursts; the amount of methane pre-drainage possible is estimated at 400,

    Jan 1, 1988

  • AUSIMM
    Operating Experience of Roller Seed Screens at the Whyalla Pellet Plant

    Roller seed screens were installed at The Broken Hill Proprietary Company Limited (B.H.P.) Whyalla pellet plant to replace vibrating screens on the green ball circuits. The installation of roller

    Jan 1, 1984

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988