Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Where is the Risk in Coarse Gold Projects? - ABSTRACT ONLY

    This presentation addresses the sources and weighting of project risk in coarse gold deposits with relevance to experiences at the Ballarat mine and Castlemaine goldfield. With sample representation a

    Aug 1, 2010

  • AUSIMM
    Fire Behaviour in Buffel Grass Dominated Mine Site Rehabilitation in Central Queensland, Australia

    By A Sturgess, P McKenna, P D. Erskine, D Doley, V C. Glenn

    For more than four decades, rehabilitated lands in the Bowen Basin have been planted with buffel grass (Cenchrus Ciliaris), which is often used to provide rapid, stabilising and erosion reducing cover

    Jun 28, 2016

  • AUSIMM
    What Drilling Density is Optimal? ù A Case Study From the Golden Pig Mine

    By D Whitworth

    The Golden Pig mine has embarked on a diamond drill program design philosophy that increases flexibility of the program by greatly increased drill pattern densities. The use of standard broad pattern

    Jan 1, 2002

  • AUSIMM
    Impact of Stope Geometry on Backfill Systems for Bulk Mining

    By A Grice

    AMC has completed a number of backfill options studies, including several in recent years for large, three-dimensional orebodies involving total extraction by longhole open stoping with backfill. This

    Jan 1, 2000

  • AUSIMM
    Understanding Reactions in Iron Ore Pellets

    By A R. Firth

    The induration furnace for iron ore pellets was originally designed to process concentrates with high contents of magnetite. To support the use of haematite concentrates, internal fuel was added to th

    Jul 11, 2011

  • AUSIMM
    Sulphide Corporation Limited Works, Cockle Creek, NSW

    IT will be noticed, from the following contributed papers on the various plant, what an infinite number of parts are required to be kept in active operation in order to derive a resultant product of c

    Jan 1, 1918

  • AUSIMM
    Process Control - A Technology for the Present and Future

    By DJ McKEE

    Process control emerged in the mid-1960s as a new and exciting method of improving the performance of mineral processing operations. The early Australian developments, principally in Broken Hill and

    Jan 1, 1992

  • AUSIMM
    The Simulation of a CIP Plant Incorporating Shifting Equilibria Dependent on Cyanide and Copper

    By R C, K L. Rees, J S. J van Deventer

    In contrast with previously published models for the carbon-in-pulp (CIP) process, the model proposed in this paper incorporates film transfer, intraparticle diffusion, simultaneous leaching, preg-rob

    Jan 1, 1998

  • AUSIMM
    A Review of the Influence of Gas Pressure on Block Stability during Rock Blasting

    Blasting is an essential component of most mining operations, and is used to reduce the rock mass to a workable size distribution, as well as to create stable openings and pit walls. Frequently, there

    Jan 1, 1999

  • AUSIMM
    Permanent Rockbolts - The Problems are in the Detail

    By R Bertuzzi

    Permanent rock bolts in civil engineering are taken as having to serve their design purpose for at least 50 years. In many projects the design life is specified as greater than 100 years. A review of

    Jan 1, 1999

  • AUSIMM
    Practical Conditional Simulation for Geologists and Mining Engineers

    By Coombes J, Richards W. L

    The objective of this paper is to illustrate, in a practical way, how both geologists and mining engineers can use conditional simulation to add value to their decisions. Inherent assumptions, requi

    Jan 1, 1998

  • AUSIMM
    The Mineralised Rift Valleys of Tasmania

    By King D, Dickinson S. B, Matheson R. S

    Commencing in 1956, Rio TInto Australian Exploration Pty Limited in association with Electrolytic Zinc Co of Australasia, Limited, has been carrying out a mineral prospecting program in North-West Tas

    Jan 1, 1994

  • AUSIMM
    Gold Mineralisation at the North End of the Kalgoorlie Field, Mount Percy - Kalgoorlie, Western Australia

    By Bonsall EM, Schwabe MR, Hamlyn DA

    Historically, most of the gold produced from Kalgoorlie has been derived from the gold and gold telluride Golden Mile lode systems dominantly hosted within the Golden Mile Doler-ite and to a lesser ex

    Jan 1, 1984

  • AUSIMM
    Assessment of Ecotoxicology and Health Risk from Bioaccumulation in Fish of Heavy Metals and Metalloids from Historical Mine Practices in the Leichhardt River, Queensland, Australia

    By T Huynh, V Matanitobua, J Zheng, B N. Noller, J C. Ng, H H. Harris

    A risk assessment was undertaken of the aquatic ecosystem and bioaccumulation of metals and metalloids in fish at the Leichhardt River, Mount Isa, Queensland. Residual contamination of metals and meta

    Jul 16, 2014

  • AUSIMM
    Olympic DamÆs Underground Rail Haulage System ù Six Years On

    By C Fearon

    This paper discusses the implementation of an underground rail haulage system during a major expansion of the Olympic Dam mine in 1998. The factors affecting the selection of rail haulage are discusse

    Jan 1, 2005

  • AUSIMM
    Dilution Control at Outokumpu Mines

    By Pitkajarvi J

    Waste rock dilution causes mill feed grade to be lower than mineral resource grade. In nickel mines relative grade decrease (dilution) may be tens of per cent because of irregular ore boundaries and

    Jan 1, 1996

  • AUSIMM
    Mines in the Future - A Management Perspective

    Mines in the future deliver a paradigm shift in the way mining, material handling and processing are performed, unlocking significant value through production efficiency, flexibility and lower costs a

    Jan 1, 2009

  • AUSIMM
    Futuristic Surface Mining Technology

    By Collins J. L, Fytas K

    Surface mining accounts for more than 50% of the world's total mineral production. In future years this status is expected to change somewhat in favour of surface mining. The production technol

    Jan 1, 1988

  • AUSIMM
    Lower Levels Project Development at the C.S.A. Mine, Cobar

    By Grant BPM

    The lower levels at the CSA Mine have been developed to mine reserves between theNo.7 level and No.9 level.Work on major excavations for the project began during 1982 with the develop-ment of the crus

    Jan 1, 1985

  • AUSIMM
    Simulation of Water Quality in Underground Gold Mine Service Water Circuits

    By Wiechers HNS

    In China the hydrogeological type of solid mineral deposits can be divided into A. Mineral deposits with fissure water; B. Mineral deposits with pore water; and C. Mineral deposits with karst water.

    Jan 1, 1988