Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New Methods for Mapping the Structure of Rock Masses

    Remote sensing techniques can be used to map joint sets in a rock mass for the estimation of in situ block size distribution and improved optimisation of blasting. This paper reviews remote sensing us

    Jan 1, 2001

  • AUSIMM
    Considerations for Design of Production Level Drawpoint Layouts for a Deep Block Cave

    By P Bartlett, K Naidoo

    Premier Diamond Mine is planning a new, mechanised, block cave, with a production level approximately 1000 m below surface. A high degree of tunnel damage is expected, due to stress and the relatively

    Jan 1, 2000

  • AUSIMM
    Bucket Wheel Excavator Mining System Experience at NZ Steel Mining Ltd's Ironsand Operation

    At the Waikato North Head Ironsand operation, NZ Steel Mining Ltd is using a Bucket Wheel Excavator û shiftable conveyor mining system to excavate Titanomagnetite bearing sand and clay. The syst

    Jan 1, 1986

  • AUSIMM
    Project Evaluation – A Non-Executive Director’s Perspective

    By R Knight

    "In project evaluation there are two matters of keen interest to non-executive directors: the process by which an investment recommendation is reached, as well as the investment itself, as presented.

    Mar 8, 2016

  • AUSIMM
    Application of Engineering Discipline and a Full-process Optimisation Focus – Productivity to Profitability without Profuse Pruning

    By W R. Adamson

    "Optimisation of drill and blast design and engineering can deliver a significant positive impact on the profitability of any mining operation; however, true engineering of the blasting process is les

    Aug 24, 2015

  • AUSIMM
    Grade Estimation for Short-Term Planning in Block Caving Mines

    By M Scoble, W S. Dunbar

    This paper reviews methods for grade estimation in short-term mine planning for block caving. Two particular tools are used: Ordinary Kriging and Simple Kriging with moving averages. It is also consid

    Jan 1, 2000

  • AUSIMM
    Lead Smelting at Sulphide Corporation Ltd.'s Cockle Creek Works

    THIS paper is not intended to be a detailed description of the lead, smelting plant at Cockle Creek, as this has been covered in previous papers for the Institute in 1918, Proceedings No. 31, by other

    Jan 1, 1923

  • AUSIMM
    Pyrometallurgical process simulations using CALPHAD thermodynamic databases

    By M-A Van Ende, N Kumar, I-H Jung

    In order to utilise the powerful thermodynamic databases for process simulations, a concept called Effective Equilibrium Reaction Zone (EERZ) was introduced to couple thermodynamic database calculatio

    Aug 21, 2024

  • AUSIMM
    æThere is an Emptiness for Maori Here in WaihiÆ - Understanding Indigenous Perspectives on Post-Mine Land Uses in Closure Planning

    By T Hill, J Everingham, P Clark

    Currently, social impact assessment (SIA) is used to determine social impacts across the life-of-mine (LOM) to closure. This paper draws on recently completed SIA reports from the Martha gold mine in

    Jul 10, 2012

  • AUSIMM
    Field Characterisation of Two Full-Scale Waste Rock Piles

    By D J. Williams, G W. Wilson, S, A B. Tran

    A comprehensive field program was implemented to evaluate the internal structure and hydrology of two full-scale waste rock piles. The excavation of waste rock dumps for in-pit disposal at the two min

    Jan 1, 2003

  • AUSIMM
    Autonomous Mapping of Mine Face Geology Using Hyperspectral Data

    By E Nettleton, A Melkumyan

    Identification of geology and mineralogy in situ on the mine face is essential if mining processes are to be automated for tasks such as exploration, grading and reconciliation. Hyperspectral data acq

    Sep 26, 2011

  • AUSIMM
    Use of Pre-injection and Spiling in Front of Hard Rock TBM Excavation

    Hard rock TBMs are very often open machine layouts, with just a part roof shield over the front of the machine. The whole system is designed for fast face advance and the economy of the project often

    Jan 1, 1999

  • AUSIMM
    Cut-and-Break, a 'New' Method of Rock Excavation

    By Seib W

    In cut-and-break rock excavation use is made of the fact that breaking rock in tension towards a free face requires a specific energy of excavation which is small in comparison with that required for

    Jan 1, 1992

  • AUSIMM
    Blasting in Reactive Ground

    By N Tyson

    Throughout Australia and the world, there have been in recent years a number of incidents involving the reaction of ammonium nitrate based explosives with ground containing certain types of sulphides.

    Jan 1, 2001

  • AUSIMM
    "Development of a Real-Time Adherence to Mine Plan Tools as Part of an Integrated Remote Mine Control Centre"

    By S D. Dessureault

    In one of North AmericaÆs largest mines, which contains more than six active coal-producing faces, mine controllers must meet the complex challenge of adhering to the mine plan while also ensuring cus

    Sep 26, 2011

  • AUSIMM
    Development of Climate-based Suitability Indices for the Improvement of Success in Rehabilitation

    By A Lechner, T Baumgartl, S Arnold, P Audet

    When revegetation is a part of a rehabilitation strategy at mine sites in arid and semi-arid environments, its success can be strongly affected by the availability of water prior or during the time of

    Jul 16, 2014

  • AUSIMM
    Accurate Underground Wireless Ranging and Tracking

    By M Hedley

    Tracking plant and personnel in underground environments provides multiple potential benefits for a mine including increasing safety, better monitoring of production, traffic control, and in the futur

    Mar 21, 2011

  • AUSIMM
    Hydromechanical Processes During In Situ Coal Gasification

    By J Liu

    In situ coal gasification is a method of extracting a high proportion of the energy value from coal without the need for mining. In situ conversion of coal to combustible gases is achieved by drilling

    Jan 1, 2004

  • AUSIMM
    The Discovery of the Wabu Ridge Gold Skarn, Irian Jaya, Indonesia

    By L Soebari, W Sunyoto

    The Wabu Ridge Gold Skarn deposit is located at elevations of up to 3100 metres above sea level, in the Central Highlands of Irian Jaya, Indonesia, 35 km NNW of the Grasberg porphyry deposit. Wabu is

    Jan 1, 1999

  • AUSIMM
    The Spent Pot Lining Treatment and Fluoride Recycling Project

    By G Swayn, J Harpley

    Spent Pot Lining (SPL) is an unavoidable waste product of the electrolytic process in the smelting of aluminium. SPL is considered to be a hazardous waste in various countries because it contains sign

    Jan 1, 2002