Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016By J Darbritz
"This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016
Nov 15, 2016
-
The MTM copper processBy R W. Shaw
The MTM Process targets treating lower grade and/or problem concentrates that are not attractive to smelters. The process has been developed at laboratory scale for copper and is based on a related de
Aug 24, 2022
-
The Perseverance Gold Copper Deposit – A New Peak Mines ChallengeBy B Taylor
The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent
Aug 22, 2011
-
The Mineral Wealth of Nations (4aa887e7-f3ad-4ddc-afe8-5174ce2ed19b)In the geologically prospective nations which rim the Pacific Ocean, mineral deposits offer great potential to create wealth for social and economic development. The paper first examines the geologic
Jan 1, 1995
-
The Downward Trend of Mining - Infrastructure CostsBy Glassock C. D
Most Australian mining projects are becoming smaller, more remote and with lower grades of ore. Their small size has been making it harder for mining companies to absorb the large infrastructure co
Jan 1, 1997
-
The Mineralized Rift Valleys of Tasmania - DiscussionBy King D, Dickinson S. B, Matheson R. S
Graham Hall and V. M. Cottle (Rosebery, Tas.) : In their paper on "The Mineralized Rift Valleys of Tasmania", Campana, Dickinson, King and Matheson have summarized a wealth of data from many
Jan 1, 1959
-
Movable Belt Conveyor at the Yallourn North Open Cut of the State Electricity Commision of VictoriaBy Anderson C. G
The design of crawler-mounted conveyor belts installed for the handling of brown coal in open cuts is described.INTRODUCTIONThe State Electricity Commission of Victoria operates two brown coal open cu
Jan 1, 1955
-
Design and Construction of the New Car Dumper Facility for the Dampier Port Upgrade ProjectBy A Radici, M Attwill
The Dampier Port Upgrade Project (DPU) involves an upgrade to Hamersley IronÆs Parker Point iron ore port facility at Dampier, Western Australia. The $US700 million DPU Project will increase Hamersley
Jan 1, 2005
-
Blasting at Shallow Depths: Problems and ImprovementsRock formation at shallow depths is generally associated with complex geology consisting of many joints, fractures, bedding planes, etc. Fragmentation results from primary blasts in such strata are
Jan 1, 1995
-
The Application of Physical Modelling Techniques to Problems in TunnellingBy Enever J, Walton R, Wold M
Photoelastic and equivalent material model ling techniques for studying stresses and defor- mations and modes of failure in geological and engineering structures are described. The appli- cation of t
Jan 1, 1976
-
Pemali Open Pit Mine Slope Stability ProblemBy Bhattacharyya A. K>
The Pemali Open Pit Mine is situated in a small island called Bangka in Indonesia. It produces approximately 165,000 m3/year of tin ore with an average grade of 3.67 kg/m' of tin from a primary
Jan 1, 1989
-
Mining-Hydrological Characteristics of the Underground Copper Mine of Neves-Corvo, PortugalBy Real F, Carvalho P
During the development of the Neves-Corvo Underground Copper Mine, since 1981, inflow of water has been encountered in the mine workings, which consist of a ramp from surface 5 km long, a shaft 575
Jan 1, 1988
-
Selective Open Pit Mining and Ore Treatment at Croydon Gold Mine, North QueenslandBy Kandemir H, Stafford G
The Croydon Gold Mine is located in northwest Queensland and is a joint venture between Central Coast Exploration N.L. and Pancontinental Mining Ltd. The mining operation commenced in 1987 and co
Jan 1, 1989
-
Practical Optimisation of the Flotation Circuit at West Cliff WasheryBy Kazis JV
The beneficiation of fine coal has been the major problem facing the coal preparation engineer in recent years. The influence of clay slime, particle size and reagent type are but a few of the many
Jan 1, 1984
-
Wear of Dragline Wire RopesBy H Bartosiewi, M Kuruppu, F Mashiri
Wire ropes are one of the most heavily used components in a dragline. They are subjected to harsh conditions during the regular usage of a dragline in a mining operation. Hoist ropes are subjected to
Jan 1, 2005
-
Arc-Backarc Systems of Northern Kermadec-TongaOver the past seven years, a combination of New Zealand-, Australian- and German-led research voyages using the research vessels Tangaroa, Southern Surveyor, and Sonne respectively, have revolutionise
Jan 1, 2005
-
Telfer Commences Underground Mining - A Case StudyNewmont Australia Limited has for some 15 years mined a number of large open cuts associated with the Telfer Gold Dome deposits. The principal ore body exploited has been the East Flank of the Main
Jan 1, 1991
-
Evolution of Mining and Current Practices in the Prince Lyell Orebody, Mount Lyell Mining and Railway Company LimitedBy Kennewell G. J
This paper aims to present the evolution of the mining method in the Prince Lyell orebody. Initial strategy and practical experience are detailed as are the reasons for and benefits of changes to the
Jan 1, 1992
-
A Review of BHP - Utah Coal Limited's Dragline Stripping OperationsBHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut
Jan 1, 1989
-
The Diesel Electric and Compressed Air Central Power Plant of Western New South Wales Electric Power Pty. Ltd.for the Broken Hill MinesBroken Hill is situated at an elevation of approximately 1000 ft. above sea-level, on the Barrier Ranges, in the State of New South Wales, Australia. It is approximately 700, 280 and 330 miles from th
Jan 1, 1932