Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Controls on Disseminated Gold Mineralisation at Fosterville, Victoria, Australia

    The Fosterville Goldfield has a modest past production (0.3 Moz), but is now emerging as a significant goldfield (2.6 Moz resources, including 1.1 Moz reserves) with implications for exploration withi

    Jan 1, 2005

  • AUSIMM
    The Iron Magnet Deposit

    By G Bubner, C Gaughan

    Magnetite mineralisation within the South Middleback Range has been known since the early 1930s; however, it was not until 1989 that BHP (then owners of the Middleback Ranges mining leases) drilled 10

    Jan 1, 2005

  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    Status Quo and Future Evaluations of Global Rare Earth Mining (with Respect to Special Rare Earth Element-industry Criteria)

    By H Mischo, G Barakos, J Gutzmer

    The continuously growing demand for rare earth elements (REEs), in combination with the crisis of 2009 and the price spike of 2011, has initiated a treasure hunt for rare earth deposits all over the w

    Nov 4, 2015

  • AUSIMM
    Geometallurgical Guidelines for Miners, Geologists and Process Engineers - Discovery to Design

    By D David

    Geometallurgy is often a misunderstood and poorly defined concept. The first thing the paper will attempt is to provide a definition of geometallurgy. Ultimately this paper has been written to provide

    Sep 29, 2013

  • AUSIMM
    From Blasthole to Reverse Circulation Sampling – Changing Grade Control Methods at Black Star Open Cut Zinc-Lead Mine, Mount Isa, Queensland

    By B Young

    Variable bench heights, interaction with underground workings and a steeply dipping orebody are challenges faced daily by geologists at Xstrata Zinc’s Black Star Open Cut (BSOC) Zinc/Lead/Silver mine

    Aug 22, 2011

  • AUSIMM
    The Use of a Portable Aerosol Counting System to Characterize Dust Clouds and Evaluate Control Methods in Underground Metal Mines

    By Bigu J, Grenier M. G, Knight G

    Particulate control is a major concern in underground mining and the subject of continuing research world wide. In Canada the federal government's Mining Research Laboratory at EIIiot Lake, O

    Jan 1, 1988

  • AUSIMM
    Combining Multi-Camera-Data of Flotation Circuit with PCA and PLS

    By H Hy÷tyniemi

    In this paper multivariate data analysis performed on a new multi-camera system implemented to zinc flotation circuit of PyhSsalmi mine is presented. Image-analysis-based system was developed to take

    Jan 1, 2005

  • AUSIMM
    Coarse Gold Separation at Bendigo

    Bendigo Mining operates a 600 000 t/a comminution, gravity, flotation and leaching processing plant for the recovery of gold from their Kangaroo Flat Operation, in the Bendigo goldfields. The free gol

    Aug 1, 2010

  • AUSIMM
    Shifting Waters in the Pilbara’s Iron Ore Industry

    By I Brandes de Roos

    Water has played a key role in the Pilbara’s 60-year history of iron ore operations. In contrast to many of the current-day mining environments, iron ore mining was initially hosted by geological form

    Jul 13, 2015

  • AUSIMM
    QAQC – proactive Quality Management (QM) supporting reconciliation results

    By O Dominguez

    Significant value can be added to ore supplied from the mine to the mill by measuring its quality in real time and performing grade control additional to that within the mine. Responsibility for ore q

    Mar 22, 2022

  • AUSIMM
    Faulting in Heavy Mineral Deposits – Friend or Foe?

    By C Buchanan

    For a long time there has been a known relationship between the northern Heavy Mineral (HM) deposits of the Murray Basin to the extensive north east trending ridges in the area. These ridges have been

    Aug 22, 2011

  • AUSIMM
    The Restructuring of Ranger - A Case Study or Necessity is the Mother of Invention

    By S S Solomons

    In 1991 the uranium spot market price dropped to approximately US$7/Ib U308, a historical low in real terms and the short-term outlook for the industry in the next five years was grim. At this time

    Jan 1, 1994

  • AUSIMM
    Impact of Co-disposing Mixed Plant Rejects on Spoil Pile Settlements

    By D J. Williams, A K. Kho, A Shokouhi, N Tucker

    The disposal of dewatered coalmine tailings and coarse reject within spoil piles is gaining popularity as a means of eliminating separate surface tailings storage facilities or dams. The contrasting c

    Jul 27, 2015

  • AUSIMM
    Whole-of-System Analysis Using CFD to Reduce Emissions of Fugitives Gases Inside a Copper Smelter Building

    By E Nik, A Manzoori, H Namavari, P Witt

    The smelter building at Sarcheshmeh Copper Complex, Iran, houses two reverberatory furnaces and five Pierce-Smith converters. Under normal operating conditions SO2 emissions fill the building, posing

    Jan 1, 2004

  • AUSIMM
    Recent Developments in the Gravity Concentration of Gold at Peko Mines LTD, Warrego N.T.

    From August 1962 to June 1976 Peko Mines Ltd. produced Gold Bullion at the Peko Control Mill using 18x24 Denver Mineral Jigs and strake tables. Gold ores treated during this period were obtained fr

    Jan 1, 1978

  • AUSIMM
    Passivation effect of immobilised ferric (hydroxy-)xanthate upon calcium/magnesium precipitates on the pyrite depression in alkaline conditions

    By T Suwa, S Ishida, J Xue, S Fuchida, H Shimada, Y Aoki, C Tokoro

    Pyrite depression with prolonged pre-conditioning treatment in high salinity water has attracted much of researchers’ interest in recent years considering the increased utilisation of multiple stage f

    Aug 24, 2022

  • AUSIMM
    Gold Dredging In New Zealand

    The history of gold dredging in New Zealand, leading to the develop- ment of the `New Zealand Type' dredge is considered. Much of this infor- mation has come from contemporaneous publications by

    Jan 1, 1988

  • AUSIMM
    A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors

    By R M. Krek

    The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy

    Mar 24, 2014

  • AUSIMM
    Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals Industry

    By A Woodley, A N. Danoucaras

    In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2

    Nov 26, 2013