Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western Australia

    The Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located

    Jan 1, 2006

  • AUSIMM
    Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource Estimate

    By C Switzer, R Logan, S Konopa, P Stoker, R Lewis

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New G

    Mar 18, 2015

  • AUSIMM
    A System for Ore Tracking in Autonomous Mining

    By E Nettleton, A Melkumyan

    A probabilistic system for autonomous tracking of excavated ore in mining would be highly valuable. Currently, mine sites can have a vast array of sensors; examples include excavator load cells, bucke

    Sep 26, 2011

  • AUSIMM
    Energy Efficiency Assessments in Design – Seminal Decisions and Effective Processes

    By M Allen

    Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta

    Aug 8, 2011

  • AUSIMM
    Goafstream Sampling and the Barometer

    By M Brady

    "It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h

    Jun 1, 2012

  • AUSIMM
    Proactive Strata Control Management at Anglo American Metallurgical Coal Australian Open Cut Operations

    Anglo American Metallurgical Coal (AAMC) manages five open cut coal mines in Queensland and New South Wales, producing approximately 30 million tonnes per annum. The size and complexity of these mines

    Nov 25, 2010

  • AUSIMM
    A Modified Software Tool for Mine Waste Rock Dump Planning

    By Z Fu, E Topal, O Erten

    "Mine waste rock management involving waste rock movement and placement, is a critical aspect in the planning of open pit mining operations, as the waste rock haulage cost can be the largest portion o

    Nov 15, 2016

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Petrology of the Broken Hill Lode and its Bearing on Ore Genesis

    LIST OF CONTENTSAbstractIntroductionSelected Sections of the Broken Hill LodeLocality PlansPetrology1. Zinc Corporation Mine: DDH. 5.98, section 30, No. 26 level2. Zinc Corporation Mine: DDH. 838, sec

    Jan 1, 1959

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    Calculating the Value of Iron Ores in Ironmaking and Steelmaking

    By T Honeyands

    At present we are witnessing large investments in the iron ore industry, fuelled by demand from Asia. At the same time, there is a changing landscape in pricing of iron ores, with the recent demise of

    Jul 11, 2011

  • AUSIMM
    Laboratory Calibration and Initial Results of a Soil Moisture Monitoring System at the Mt Leyshon Tailings Dam and Waste Rock Cover System

    By R Neivandt, Kane, M O&apos, D Browne

    Newmont Australia is the operator of the Mt Leyshon mine near Charters Towers, Queensland. Mt Leyshon is an open cut gold mine, which processed on average 5.0 Mt of ore and produced up to 250 000 ounc

    Jan 1, 2003

  • AUSIMM
    The Dynamics of Coupling Between Deformation and Fluid Flow in the EarthÆs Crust: Implications for Ore Genesis

    Permeability and fluid pathways in fracture-controlled hydrothermal systems are governed by a dynamic competition between permeability-creation processes and permeability-destruction processes. Permea

    Jan 1, 2005

  • AUSIMM
    Research on in situ recovery technology of hot-dip galvanised dross

    By X Li, R Chu, X Deng

    The hot-dip galvanising industry is the largest consumer of zinc, with over 40 per cent of the world’s total annual production of zinc used for galvanised steel. The dross generated in the hot-dip gal

    Jun 19, 2024

  • AUSIMM
    Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective

    By A Kleinitz, J Halilovic, K Trappitt

    Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne

    Mar 22, 2022

  • AUSIMM
    Designing Interferometric Synthetic Aperture Radar Surveys for Mine Monitoring with Accuracy Assessment

    By R Ahola, M D. Henschel, M A. McParland

    With the introduction in recent years of third-generation interferometric synthetic aperture radar (InSAR) techniques, monitoring of mine slopes, benches and surrounding areas has benefitted from incr

    Nov 5, 2014

  • AUSIMM
    Water balance management 101

    By M Rafty, C Lane

    Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the

    Jul 23, 2018

  • AUSIMM
    Life-of-mine Spillway Strategy – Managing Risk Associated with Surface Water at a Tailings Storage Facility

    By K Brand, M J. Ind, M Rynhoud

    Water management at a tailings storage facility (TSF) presents one of the major risks to the safe performance of the facility. International and domestic dam safety guidelines assess a dam’s hazard ca

    Jun 28, 2016

  • AUSIMM
    Gravity Gold - The Process of Change - ABSTRACT ONLY

    Employing gravity recovery for coarsely liberated gold and sulfide ores has potential to lead to a signifi cant reduction in the energy required for comminution and ultimately can have a significant i

    Aug 1, 2010

  • AUSIMM
    Hudson Bay Mining and Smelting ù æA Turnaround SuccessÆ

    By D W. Nisbet

    Today Hudson Bay Mining and SmeltingÆs 777 Project is the largest mining construction project under way in Canada. The project comprises six components: construction of the new 777 zinc-copper mine; c

    Jan 1, 2000