Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ore Control and Reconciliation to Maximise Metal Delivery ù A Case Study at Ridgeway Gold Mine

    By G Smart, D Ward, J Grace

    Ridgeway Gold Mine is part of Cadia Valley Operations which is wholly owned and managed by Newcrest Mining Limited. It is an underground sublevel cave (SLC) operation mining approximately 5 Mt per ann

    Jan 1, 2003

  • AUSIMM
    A higher standard of ‘safety’

    By A Turns

    In a survey conducted by symplexi with underground miners in Australia; 78 per cent of participants believed that ‘safety’ is all about people. If ‘safety’ is about people, then is the mining industry

    May 5, 2022

  • AUSIMM
    Crushers – An Essential Part of Energy Efficient Comminution Circuits

    By R Bearman

    The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha

    Aug 8, 2011

  • AUSIMM
    Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

    By D Audeyev

    The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the op

    Oct 5, 2011

  • AUSIMM
    Ore Dilution Versus Mine to Mill Optimisation at KCGM

    By M Spiteri, S Woth, J Caratti, K Henley

    Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation and downstream processing. Dilution of the orebody to some extent is the inevitable result, partic

    Jan 1, 2001

  • AUSIMM
    The Application of Automated Samplers in Copper/Nickel Processing

    By J E. Powalisz

    "The application of automated sampling techniques can help to provide a representative sample of process fluids and slurries that provide data for controlling process, custody transfer and quality ass

    Jul 29, 2014

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    Engineering the New Olympic Dam Backfill System

    By A G. Grice

    WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur

    Jan 1, 2000

  • AUSIMM
    Studies on the Effect of Burden on Blast Damage and the Inplementation of New Blasting Practices to Improve Productivity at KCGMÆs Fimiston Mine

    By G E. Smith, G N. Lye

    Wall control blasting practices are necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional

    Jan 1, 2001

  • AUSIMM
    Advances in Mathematical Modelling of Sintering Performance of Iron Ore Fines

    By T Raynlyn, R J. Holmes, J R. Manuel, A Poliakov, L Lu

    The prediction of sintering performance of iron ore fines and the possibility of targeted optimisation of specific sinter properties are very important for both the iron ore industry and related resea

    Jan 1, 2009

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Development of the Ernest Henry Underground Mine – The Challenges and the Solutions

    By T Purvis

    Xstrata Copper is extending the Ernest Henry Mine with a 6 Mtpa sub-level cave (SLC) mine being constructed under the pit. The SLC mine will maintain the EHM operation until 2024 after the pit is comp

    Mar 21, 2011

  • AUSIMM
    Selecting and Implementing the Right Technology

    The selection and implementation of the right technology for a project is critical to the future development of the resource industry. It is essential for companies to ensure ongoing competitive viabi

    Jan 1, 2006

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    A new sampler for grain and other free-flowing particulates

    By G J. Lyman

    Sampling of grain for mycotoxins is challenging in that some mycotoxins, such as Ochratoxin A (OTA), have very low permitted levels and the kernels carrying the mycotoxin may be highly localised withi

    May 9, 2017

  • AUSIMM
    The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist Installation

    The hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista

    Jan 1, 2005

  • AUSIMM
    Organisational Factors in Fatalities and High Potential Incidents

    By N LaBranche, G Callinan

    There has been a reduction in overall workforce in the mining industry during the current downturn; a corresponding reduction in fatalities and high potential incidents (HPIs) has not been observed. T

    Jun 22, 2016

  • AUSIMM
    Extractive Companies, Development and Environmental Agendas

    By B Harvey

    Achieving community and stakeholder endorsement during life-of-mine planning and implementation requires a business-connected approach, as opposed to charitable giving, disconnected offsets and enviro

    Jul 16, 2014

  • AUSIMM
    Maintaining and Improving Grade Control at New Celebration Gold Mine

    New Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between

    Jan 1, 1991

  • AUSIMM
    Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject

    Coal washery wastes comprise tailings, finer than 0.5 to 0.1 mm depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings slurr

    Jan 1, 1998