Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?

    By R Barritt, P Scott

    Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo

    Jul 27, 2015

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Now to the Future – A Path Toward the Future Mine

    By I Gipps

    Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t

    Nov 22, 2011

  • AUSIMM
    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    Ventilation Upgrade at the FrogÆs Leg Mine - Case Study

    By A Llewellyn, M Varvari

    The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.

    Jul 1, 2013

  • AUSIMM
    Flotation launder design and the measurement of critical froth transport parameters

    By B Wong, R G. Coleman

    In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const

    Aug 29, 2018

  • AUSIMM
    Advanced Mill Relining - A Key Operational Control (Not Simply a 'Must Do' Maintenance Function)

    RME has a vision for a new grinding plant operational paradigm made possible by RMEÆs fast, safe Mill Relining System. Some new liner designs can degrade SAG mill performance because of mill volume lo

    Jan 1, 2007

  • AUSIMM
    Dredging fine tailings

    By S H. Burgmans, B Anderson

    This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min

    Jul 1, 2021

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • AUSIMM
    Building better bow-ties – common pitfalls in risk analysis

    By B Beale

    Bow-tie analysis is a commonly used tool to identify and display risks that have the potential for an undesired hazardous event. The output of the analysis are bow-tie diagrams, which are an effective

    Apr 16, 2024

  • AUSIMM
    Characterisation of Gravity Amenable Gold Ores – Sample Representivity and Determination Methods

    By S C. Dominy

    Gravity amenable gold ores are those that after comminution produce liberated particles, composites and/or carriers that can be recovered by gravity separation means. Recovery depends upon mineralisat

    Sep 5, 2011

  • AUSIMM
    Numerical Modelling of Undermined River Valleys ù A Case Study

    By J W. Lee, E Baafi, N Aziz

    Ground subsidence due to mining is a common dilemma confronting the underground coal mining industry. The effects of underground longwall mining on river valleys have come under scrutiny, especially w

    Jan 1, 2005

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005

  • AUSIMM
    Geomembranes – from design to handover and some of the lessons learnt

    By A Marta

    Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li

    Jul 23, 2018

  • AUSIMM
    Improving Consistency of Delivery at Mt Rawdon Operation

    By M Boon, M Franklin

    This paper outlines the journey of cultural maturation and management system development at the Mt Rawdon (MRO) gold mine from its acquisition by Evolution Mining Limited (Evolution) in late 2011 to 2

    Jun 22, 2016

  • AUSIMM
    Depositional Behaviour of Coal Tailings, Co-Disposed Coal Washery Wastes, and Loose-Dumped Coarse Reject (AuslMM '98 - The Mining Cycle)

    By D J Williams

    Coal washery wastes comprise tailings, finer than 0.5 to 0.1 inn depending on the sophistication of the washery, and coarse reject, typically finer than 50 mm. Subaerial disposal of coal tailings sl

    Jan 1, 1998

  • AUSIMM
    Moving mORE for Less

    By G Brudek, P Elestedt

    Schalker Eisenhütte und Maschinenfabrik GmbH, Nordic Minesteel Technologies and Bombardier Transportation have developed an evaluation tool that considers the main cost drivers of the rail, truck

    May 9, 2016

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Improved Ground Control Using Hydro Scaling and In-Cycle Shotcrete

    By B Upton, J Mitchell

    The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug

    Jan 1, 2005

  • AUSIMM
    Gold Mining South Australia The First Fifty Years

    By Fradd WP

    South Australia pioneered metal mining in Australia and was the main source of copper for several decades. Gold discoveries and mining also contributed significantly to the development of the Colo

    Jan 1, 1987