Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Microanalytical Evaluations of the Savage River Old Tailings Dam, North-?west Tasmania

    By A Hughes, J Agius, T Ferguson, A Parbhakar-Fox, D Lester, L M. Jackson

    Management of historic tailings is a major challenge facing the mining industry and its regulators. However, through improved mineralogical and chemical characterisation of such materials the opportun

    Jul 27, 2015

  • AUSIMM
    Sustainable Steel Plant on an Environmental Protection Area

    By C A. Chaves

    During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis

    Jan 1, 2009

  • AUSIMM
    Now, this is the Time for Mining Companies to Choose - Real Option Valuation or Discount Cash Flow

    By S Shafiee, N Abbate

    The evaluation of mining projects requires a methodology that will give flexibility and manage the existing uncertainty within the projects. The discount cash flow (DCF) and other traditional evaluati

    May 24, 2012

  • AUSIMM
    Nena High Sulphidation-Type Deposit, Frieda River, PNG: Host-Rock Types, Hydrothermal Alteration and Copper-Gold Mineralisation

    The Nena high sulphidation-type copper-gold deposit is composed of andesitic pyroclastic units with minor interstratified lava flows. Epiclastic sandstone and conglomerate, and siliciclastic rocks con

    Jan 1, 1999

  • AUSIMM
    Changing Restoration Priorities in the 21st Century – Opportunities for Novel Ecosystem Design in Mine Closure

    By P Audet, D Doley

    The mining industry often embraces mine closure criteria that require the reinstatement of predisturbance or even presettlement (ie historic) ecosystems. However, the extent and severity of disturbanc

    Jul 16, 2014

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011

  • AUSIMM
    Is Australia Producing Sufficient Numbers of Earth Science Graduates?

    By Robinson KJ

    There has been much debate in recent years regarding the number of Geology (Earth Science) graduates produced in Australia. The key variable has commonly been assumed to be the placement of graduat

    Jan 1, 1989

  • AUSIMM
    The Colorimetric Determination of Molybdenum in Soils, Sediments, and Rocks by Zinc Dithiol

    Samples weighing O· 2 g are digested with 2 ml of 72 per cent perchloric acid for 2 hr at 180°C, and then diluted to 10 ml. with water. After settling, an aliquot of clear solution is reduce

    Jan 1, 1970

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • AUSIMM
    Lack of Alignment between Regulation of Surface Water Management in Coal Mining and Coal Seam Gas

    By E Coffison, M Gibbs, C Bennett

    The sustainable management of surface water associated with coal mining and coal seam gas projects is a considerable factor affecting the global competitiveness of these resource companies operating i

    Nov 26, 2013

  • AUSIMM
    Study on Pure Mineral Flotation Tests of Low-Grade Phosphate Ore in Zhijin, Guizhou Province, China

    Study on Pure Mineral Flotation Tests of Low-Grade Phosphate Ore in Zhijin, Guizhou Province, China

    Sep 13, 2010

  • AUSIMM
    Paper No. 180. The Calculation of The Comparative Efficiencies of Crushing And Grinding Machines.

    WHEN making comparisons of the efficiencies of different grinding and crushing machines it is desirable to be able to estimate the work actually done in crushing the ore from a given size of feed to a

    Jan 1, 1909

  • AUSIMM
    The Tolukuma Gold Silver-Vein System, Papua New Guinea

    By G J. Corbett, T M. Leach

    A continued exploration programme has further defined the geology of the Tolukuma vein system, verified the resource indicated by Newmont, and identified potential for additional mineralisation. The r

    Jan 1, 1995

  • AUSIMM
    Mineralogy and Magnetic Susceptibility of the Proterozoic Granites, Related to Gold Mineralisation, Pine Creek Geosyncline, Northern Territory, Australia

    By Z U Bajwah

    During the Palaeoproterozoic, a large number of granitic intrusions were emplaced in the various parts of the Pine Creek Geosyncline (PCG). In the central region, the granitic magmatism is represent

    Jan 1, 1994

  • AUSIMM
    The Effect on Metallurgical Recoveries of Inaccuracies in Assay Results

    It is the purpose of this paper to produce some evidence on the accuracy to be expected from normal assay procedure using the usual first class equipment, and to examine the effect that many assaying

    Jan 1, 1952

  • AUSIMM
    Gippsland Basin South Platform: Unprospective or Underexplored?

    I The South Platform of the Gippsland Basin is an extensive area of shallow basement covered by a relatively-thin Late Mesozoic-Cainozoic section. Although the sporadic exploration to-date has not r

    Jan 1, 1992

  • AUSIMM
    Project and execution of the excavation for a haulage shaft with raise boring techniques

    By M Orunesu Preiata

    The Odysseus Project is part of the high-grade Cosmos Nickel Complex that lies 30 km north of Leinster. The Odysseus definitive feasibility study (DFS) was approved by the Western Areas’ board in Octo

    Mar 29, 2023

  • AUSIMM
    Blast Hole Diamond Drilling as Developed for Sub-Level Stoping at New Occidental Gold Mines, N.L., Cobar, N.S.W.

    By Creelman C. A

    With the technique and data obtained in using the blast hole diamond drill for "Removal of Horizontal Level Pillar by means of Blast Hole diamond drilling at New Occidental Gold Mines N.L.,"

    Jan 1, 1945

  • AUSIMM
    Application of Tracer Gas Flow Profiling to Improve Secondary Ventilation Practice – A Pilot Study

    By S Wilkinson, S Black, L van den Berg

    "The mine ventilation system plays an important role in mitigating human exposure to diesel particulate emissions (DPM), exhaust gases and heat in underground mines. The mine’s secondary ventilation s

    Aug 31, 2015

  • AUSIMM
    Geology, Geochemistry and Exploration Implications of Hydrothermal Alteration Associated with Epithermal Au-Ag Deposits

    By AMIRA P588 Research Team

    This contribution summarises new knowledge and data, obtained during a three year ARCAMIRA funded research project, on the mineralogical and geochemical characteristics of hydrothermal alteration asso

    Jan 1, 2005