Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recovery of Metal Values from Complex Sulphide Concentrates of Copper, Lead and Zinc through Aqueous Chlorination

    By Paramguru R. K, Jena P. K

    Increasing demand for copper, lead and zinc with continuous depletion of good grade ore reserves, warrants the need for utilization of lean and complex ores of these metals. There is worldwide effort

    Jan 1, 1981

  • AUSIMM
    The Failure of Lead by Creep

    From time to time lead, which is normally considered to be a soft ductile metal, fails by cracking. The cracks which form appear to be of two distinct types-(a) those which follow a zig-zag course aro

    Jan 1, 1935

  • AUSIMM
    Evaluation of a Single-Layer Desulfurised Tailings Cover

    By G W. Wilson, M Aubertin

    A desulfurised tailings cover was installed at the Detour Lake Mine in Ontario, Canada, to reduce oxygen penetration into the underlying sulfidic tailings. The cover ranges from one to 1.5 m in thickn

    Jan 1, 2003

  • AUSIMM
    Mineral Resource Assessment of the Coromandel Region, New Zealand

    By D N. B Skinner, R L. Brathwaite, M S. Rattenbury

    The Institute of Geological and Nuclear Sciences Ltd has carried out a mineral resource assessment of the Coromandel region, one of the most mineral-rich regions of New Zealand. The assessment focusse

    Jan 1, 2001

  • AUSIMM
    Dynamic Simulation in Iron Ore Pelletising Plants

    By P Navarra, R Kuhne

    Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden

    Jan 1, 2009

  • AUSIMM
    The Evolution in Design of Longhole Open Stoping at Zinc Corporation Limited/New Broken Hill Consolidated Limited Mines with Particular Reference to Sloped Wall Mining

    By Solomons S. S, Tillmann V. H

    The progress of longhole open stoping (LHOS) at Zinc Corporation Limited and New Broken Hill Consolidated Limited (ZC/NBIIC) is described together with the design of a novel sloped wall longhole stopi

    Jan 1, 1981

  • AUSIMM
    Forum: The Role of Government Departments in the Minerals Industry

    I am wearing two hats today. When the invitations went out to participate in this forum, two were received in the head office of the Department of Lands and Survey - one addressed to the Director-Gene

    Jan 1, 1976

  • AUSIMM
    Physical/Chemical Treatment of Mercury-Contaminated Wastes from Former Chlorine-Alkali Electrolysis Plants - Application of Flotation Technologies in Soil Washing Plants

    Physical/Chemical Treatment of Mercury-Contaminated Wastes from Former Chlorine-Alkali Electrolysis Plants - Application of Flotation Technologies in Soil Washing Plants

    Sep 13, 2010

  • AUSIMM
    The Barewood-Hindon Vein System: A Regionally Extensive Normal Fault-Hosted Gold Deposit in the Otago Schist

    By D Craw, J Youngson

    Recent exploration for mesothermal gold deposits in the Otago Schist has focussed largely on extensions of, or analogies to, the reverse fault-hosted Hyde-Macraes Shear Zone deposit. Abundant normal f

    Jan 1, 2002

  • AUSIMM
    A Petrographic Basis for Classifying Australian Coals

    The proposed classification scheme is based on two primary parameters, one for petrographic composition and the other for rank, both being determined with microscopic techniques. The scheme has been a

    Jan 1, 1970

  • AUSIMM
    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator

    Analysis of Electrostatic Separation for Rutile Cleaning Duty Using a Plate Electrode Assisted High Tension Roll Separator A plate assisted electrostatic high tension roll separator has been used for

    Sep 13, 2010

  • AUSIMM
    Control of the Flotation Rate of Carbonaceous Material in Mount Isa Chalcopyrite Ore

    When the mining and milling of 1100 copper orebody commenced at Mount Isa a satisfactory grade of copper concentrate was difficult to produce. The major concentrate contaminants were fine pyrite and s

    Jan 1, 1971

  • AUSIMM
    Application of the Anaconda Simplified Work Index for Multiple Test Sizes

    Application of the Anaconda Simplified Work Index for Multiple Test Sizes Vale uses Bond Work Index measurements extensively in a number of applications. The Bond Work Index is usually a good paramet

    Sep 13, 2010

  • AUSIMM
    Triboelectrostatic Producing Ultra-Clean Coal

    Triboelectrostatic Producing Ultra-Clean Coal

    Sep 13, 2010

  • AUSIMM
    Coal seam gas predrainage optimisation through an enhanced knowledge of coal seam permeability

    By M Blanch

    Gas management practices across the Australian underground coal industry have evolved significantly since the early nineties with the introduction of hazard management plans, directional drilling tech

    Aug 28, 2017

  • AUSIMM
    Atmospheric Corrosion of Extruded Silver Lead Alloys

    By Hirst H, McAfee J

    In December, 1934, Mr. R. Sussex extruded some silver lead alloy wires in order to determine their electrical resistance. After the determinations had been made each wire was threaded through a sheet

    Jan 1, 1941

  • AUSIMM
    Determination of the Structure of the Bulli Coal Seam at Appin Colliery, N.S.W., by the Seismic Reflection Method

    The structure of the Bulli coal seam at Appin Colliery was detailed by the seismic reflection method. This unusual application of the seismic method was possible because there is a reflector near the

    Jan 1, 1965

  • AUSIMM
    Natural Processes Removing Dissolved Arsenic from Selected West Coast Streams

    By C Noble, J Webster-Brown

    A survey of selected West Coast Streams was undertaken in Summer 2001, Summer 2002 and Winter 2002 to establish the degree of arsenic (As) contamination in waters and sediments downstream of old coal

    Jan 1, 2003

  • AUSIMM
    Management of Hydrogeological Risk in Tunnelling Projects

    A key driver to the success of a tunnelling project (the project) is the management of hydrogeological risk. The hydrogeological risk, if not managed, may cause significant impacts on the overall perf

    Jan 1, 2008

  • AUSIMM
    Different Methods of Alluvial Mining in Victoria

    Amongst representative men directing alluvial mining of erations in Victoria, some difference of opinion exists as to the best system of working the deep leads. The developmental operations of shaft-s

    Jan 1, 1902