Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Preliminary Sizing and Selection of an HPGR Using Piston-Die Press TestsBy P. Rosario
"Current industry practice for HPGR assessment and sizing relies on conducting a series of tests using pilot-scale machines with roll diameters of 700 mm to 1000 mm. Substantial amounts of sample are
Jan 1, 2019
-
RI 9660 - Evaluation Of Systems To Monitor Blind Areas Behind Trucks Used In Road Construction And Maintenance: Phase 1By Todd M. Ruff
The majority of fatalities that occur in road construction work zones in the United States involve a worker being struck by a piece of construction equipment or other vehicle. The Spokane Research La
Jan 1, 2004
-
Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mineBy U. Olsson, M. Ramström
"The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen
Jan 1, 2005
-
Metallurgie Hoboken-Overpelt?s Zinc Electrowinning PlantBy E. Van Den Neste
A concise historical review is given of the Overpelt plant and the general principles of zinc hydrometallurgy are briefly outlined, together with a description of the new electrolytic zinc plant ore r
Jan 1, 1977
-
RI 5405 Preparation Characteristics Of Coal From Dickenson County, Va. ? SummaryBy T. E. Gray
This report describes the preparation characteristics of the more significant coals in Dickenson County, Va. It is one in a series planned to determine which coals are suitable for the production of m
Jan 1, 1958
-
Arizona Copper Industry Continues to Face ChallengesBy William R. Yernberg
The 2002 Arizona Conference was held Dec. 8 and 9, 2002, at the Doubletree Hotel at Reid Park in Tucson. The annual conference is organized by the Arizona Conference Board of Directors, which represe
Jan 1, 2003
-
Stope Filling with Thickened Classified Flotation TailingsBy Yates C, Gillie E. W, Finucane K. J
During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka
Jan 1, 1945
-
Roof Bolter Rocker Pad Deflector Systems (6ff5d1f9-2211-4169-8a90-2ad9493ee24a)By Arnold Hammons
Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby
Jan 1, 2009
-
IC 7747 National Annual Survey Of Aviation Fuels, 1955 ? IntroductionBy O. C. Blade
This report on the properties of aviation gasolines and aviation jet fuels produced in the United States during 1955 was made under a co-operative agreement between the American Petroleum Institute an
Jan 1, 1956
-
IC 9151 Roof And Rib Fall Accident And Cost Statistics: An In-Depth StudyBy Deno M. Pappas
The purpose of this Bureau of Mines study of U.S. roof and rib (roof- rib) accident statistics and related accident costs is to define current accident trends (1980-84) associated with fatal and nonfa
Jan 1, 1987
-
OFR-155-83 Evaluation Of The Black River Mine Telecommunication SystemBy Dana T. Updyke
An evaluation was made of one of several improved underground communication systems sponsored by the U.S. Bureau of Mines. The system evaluated was installed in a typical metal/non-metal room and pill
Jan 1, 1983
-
SP 13-94 - Bureau of Mines Publications and Articles, 1992-93 with Subject and Author indexThe U.S. Bureau of Mines (USBM) was established in the public interest to conclude inquiries and scientific and technologic investigations on mining and the preparation, treatment, and utilization of
Jan 1, 2007
-
Possible Impact of New Safety Technology Developments on the Future of the United States Mining Industry (0dfc7e7e-e434-46f6-83d0-9fdde17ca2c5)By R. G. Gürtunca
The future of the United States (US) mining industry will be affected greatly by recent coal mining disasters. These have resulted in new legislation which will have an impact on mining economic costs
Jan 1, 2009
-
OFR-3-72 Final Report On Development Of Improved Ventilation Technology For Non-Coal Mines And Other Underground Excavations. ? PreambleBy J. R. Hoskins
This is the final report for Research Contract No. 00101300 (Min. 34) granted by the U.S. Bureau of Mines to the University of Idaho Mining Research Bureau. The research project is entitled "Developme
Jan 1, 1970
-
Comparative tests of two operating procedures for the Turam electromagnetic prospecting system conducted at the McClean uranium deposits in northern SaskatchewanBy K. Duckworth
"Comparative tests of the conventional Turam survey configuration and an alternative configuration called the Tx-parallel configuration were conducted at the McClean uranium deposit in northern Saskat
Jan 1, 1988
-
OFR-97(1)-75 Quick Disconnect Couplers For Trailing CablesThree complete connector assemblies and six separate contacts were submitted to a series of tests to establish the connectors permissibility and compliance with U. S. Bureau of Mines research Contract
Jan 1, 1974
-
Blast Performance Analysis – Wavelet Transforms of Blast SeismogramsBy Doug Anderson
Blast vibration seismograms are generally collected strictly for compliance with regulations. The peak levels (including dominant frequency) are typically all that are looked at. However, these record
Jan 1, 2013
-
Evaluation of refractory brick classes for the Cerro Matoso S.A. electric furnaceBy L. Tejeda, J. R. Donald, R. Parra, J. Duran, P. H. Lauzon
"Crucible slag tests were employed to evaluate different refractory brick classes for the Cerro Matoso electric furnace. Comprehensive analysis was conducted to evaluate the crucible erosion and chara
Jan 1, 1999
-
Plan de minado optimizado con ley de corte variable y stocks dinámicosBy Edgar A. Peña
El presente trabajo describe el plan de minado del yacimiento de Cuajone a través de las leyes de corte variable y stock dinámicos con el fin de maximizar el valor presente neto a largo plazo. La estr
Sep 12, 2011
-
Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson DamBy Vincent Roy
Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management
Aug 1, 2013