Search Documents

  • NIOSH
    OFR-79-84 Development Of A Hydride Fuel System For Underground Mine Use - Hydride Fuel System For Underground Mine Use Development And Testing

    By Ned Baker

    Details are given of a Hydride Fuel System to provide 5 kg of HZ to fuel a Caterpillar 3304 engine previously modified to operate on hydrogen fuel and intended to power an underground mining vehicle.

    Jan 1, 1983

  • NIOSH
    Status Of The Mineral Industries - Introduction (57c8982d-128a-4121-8a93-93f8e800d071)

    "Status of the Mineral Industries" provides a written and graphic view of the Nation's mineral position and its mineral industries. The report, issued annually by the Bureau of Mines, U.S. Depart

    Jan 1, 1979

  • SAIMM
    Characterization of firebricks used in copper smelting furnaces of the 19th century, Atacama, Chile

    By J. Guerrero, O. Pavez, N. Toro, A. Nazer

    In the 19th century, mining in northern Chile was of great economic importance. Today, the ruinsof the copper smelters and abundant fragments of refractory bricks from their furnaces remain. Therefrac

    Jul 5, 2023

  • CIM
    Geologic Setting and Relevant Exploration Features of the Jabiluka Uranium Deposits

    By M. R. Hegge

    The Jabiluka One and Two uranium deposits occur in Lower Proterozoic metasediments of the Cahill Formation, which is part of the Pine Creek Geosyncline in the East Alligator River area, Nothern Territ

    Jan 1, 1977

  • NIOSH
    OFR-14-81 The Mechanism Of Attachment Of 218Po(RaA) To Monodispersed Aerosols

    By Philip K. Hopke

    A systematic study of the mechanism of interaction of 218Po(RaA) armed by the decay of 222Rn with airborne particulate matter has been made. The rate of attachment of RaA to particles in the diameter

    Jan 1, 1980

  • AUSIMM
    Iron Ore Fines to Slabs via the MIDREX« Direct Reduction Process in Western Australia

    By Pupazzoni P. D, Meissner D. C

    Incorporating an iron ore pelletising plant, a MIDREX'"' Direct Reduction Plant, and a mini mill, the conversion of iron ore fines to high- quality steel slabs in Western Australia is among

    Jan 1, 1999

  • SAIMM
    Blast optimization at Kriel Colliery - Synopsis

    By A. M. Neale

    Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe

    Jan 1, 2010

  • NIOSH
    OFR-16-83 Safe Organic Insulations And Fluids For Permissible Enclosures

    By K. L. Paciorek

    Organic materials utilized as cable Jacketing, cable insulation, standoffs, insulating boards and potting compositions were identified and d literature survey performed to obtain the required thermal

    Jan 1, 1980

  • DFI
    High Capacity Barrettes In A Region Of Old Underground Quarries

    By F. Schlosser

    The extension of Montparnasse Station in Paris required the construction of supports of very high unit capacity to support a particularly rigid super-structure. The majority of the site is characteriz

    Jan 1, 1989

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • IOM3
    Proceedings, First Session, Papaers Nos.1-4

    Summary of the morning's events with a Written Contribution to Paper No. 4 and author responses

    Jan 1, 1947

  • NIOSH
    RI 9225 - Causes and Control of Coal Mine Bumps

    By K. Y. Haramy

    Coal mine bumps involve the violent, rapid failure of coal and rock around a mine excavation. Deep coal mines with strong roof and floor rocks and high-stress conditions frequently experience face and

    Jan 1, 1988

  • IOM3
    Kinetics of Cu(II) adsorption by Penicillium sp.

    By S. P. Mishra, G. R. Chaudhury

    The adsorption of Cu2+ ions by Penicillium sp. displayed a dual rate, with an initial faster phase followed by a slower one. The adsorption rate increased with increasing pH due to chemical and bioche

    Aug 1, 1995

  • NIOSH
    IC 6679 Supplementary Notes On Core Drilling In The Salt Beds Of Western Texas And New Mexico. Tests 13 To 24 ? Introduction

    By E. P. Hayes

    This report supplements the date contained in Bureau of Mines Information Circular 6156, "Special features of core drilling in the salt beds of Western Texas and New Mexico," by J. S. Wroth. That circ

    Jan 1, 1933

  • AUSIMM
    Trends in Test Filtration to Respond to Decreasing Sample Size

    Trends in Test Filtration to Respond to Decreasing Sample Size There has been a steady decline in the quantity of samples available for testwork when developing new mining processes due to the maturi

    Sep 13, 2010

  • SME-ICGCM
    The Use Of Foamed Cement Cribs At American Electric Power Fuel Supply Meigs Division

    By Michael Amick

    Due to the importance of maintaining open airways on a longwall panel, mine management decided to install cribs made of foamed cement. Foamed cement had been used at other company operations on severa

    Jan 1, 1993

  • AUSIMM
    A Sound Level Survey in the New South Wales Coal Mining Industry

    The mechanization of the coal industry in New South Wales involved the introduction of large face and transport machines. The trend is towards still higher capacity units with .greater horsepower and

    Jan 1, 1974

  • NIOSH
    RI 5441 Damping Capacity--Its Measurement And Significance ? Summary

    By J. W. Jensen

    This report was prepared as a background reference for future publica¬tions concerning the damping capacity of metals and alloys. It contains a broad description of the theory and methods of measuring

    Jan 1, 1959

  • NIOSH
    RI 7640 - Methane And Dust Control By Water Infusion - Pittsburgh Coalbed (Fairview, W. Va.)

    By R. P. Vinson, Abdurrahman Cetinbas, Joseph Cervik, M. G. Zabetakis

    The effect of water infusion on the flow of methane and on the production of dust was investigated at an active face in the Pittsburgh coalbed. The average total flow of methane at the face decreased

    Jan 1, 1972

  • NIOSH
    IC 7741 Drill-Dust Collectors Approved By The Bureau Of Mines As Of January 31, 1956 ? Introduction

    By C. W. Owings

    One phase of Bureau of Mines health and safety work is promotion of the use of safe and effective dust-collecting devices in connection with rock drilling in coal mines. To insure that adequate equipm

    Jan 1, 1956