Search Documents

  • SAIMM
    Rollout Of Stope Drilling Systems In S.A. Mines - A Review Of Successes And Failures, And The Way Forward

    By J. Wills

    The use of drilling rigs to increasingly mechanize stope drilling has been acknowledged as important for the S.A. mining industry in it ís efforts to tackle the challenges of low productivity, AIDS an

    Jan 1, 2002

  • CIM
    National Emergency Steels

    By Albert G. Zima

    THE conservation of strategic materials during war rime gives rise to many problems not commonly encountered in times of peace. During normal times, when world trade is unrestricted, we are apt to bec

    Jan 1, 1943

  • NIOSH
    Mineral Highlights - General (e83082ae-4423-42b4-9d0c-2714fd984824)

    The Anaconda Copper Company reportedly reached an exclusive agreement with Cook Inlet Region, Inc., to explore 24 million acres in south-central Alaska and to share equally with Cook the proceeds of a

    Jan 1, 1981

  • TMS
    Exothermic Mass Transfer in Metallic Systems

    By Stavros A. Argyropoulos

    Exothermic mass transfer takes place in various areas involving metallic systems, ranging from liquid metal processing operations to the growth of thin films in microelectronics. The formation of inte

    Jan 1, 1993

  • NIOSH
    RI 7168 Investigation Of Operating Variables In The Attrition Grinding Process

    By Martin H. Stanczyk

    Bench scale, laboratory batch attrition grinding tests were made of a coarse commercial kaolin in a stainless steel, 5-inch-diameter attrition grinding machine to study the effect of a number of basic

    Jan 1, 1968

  • SME
    The Rewards Of Patience

    By R. E. Scheffel

    Most supergene copper heap leach operations today employ forced-aeration, irrespective of ore grade. Unfortunately, there is little published quantification of its benefit. There is a natural desire

    Jan 1, 2006

  • TMS
    Fe-Mn-Al-C Austenitic Steels Treated by Ca and Ce

    By S. N. Lekakh

    Phosphorous segregated at grain boundaries during solidification and heat treatment dramatically decreases low temperature toughness of precipitation hardened Fe-Mn-Al-C austenitic steel. A thermodyna

    Jan 1, 2010

  • DFI
    Recommendations For Implementing And Interpreting Non­Destructive Integrity Testing Of Cast In-Situ Concrete Piles And Diaphragm Walls.

    By Jose L. Garcia

    The following document aims to cover all issues concerning the three main methods employed for the in-situ survey of concrete pile integrity. Within it are described both sonic coring and low-stra

    Jan 1, 2006

  • SME
    Communication : The missing link in the minerals industry

    By Pat C. Hautala, J. R. Hoskins

    This is a new era for the minerals industry. Never before has there been more need for effective communication. So said Robert Anderson, chairman and chief executive officer of Hanna Mining Co. He was

    Jan 1, 1985

  • ABM
    PROPRIEDADES MECÂNICAS DAS LIGAS Ti42Nb FORJADAS A FRIO E ENVELHECIDAS

    By Emerson de Andrade Monteiro

    As ligas de titânio ao Nióbio apresentam grande potencial de desenvolvimento graças a excelentes combinações de propriedades. O tratamento termomecânico a elas conferido é importante para atingir as p

    Aug 16, 2017

  • NIOSH
    IC 7713 Catalog Of Recorded Exploration Drilling And Mine Workings In The Tri-State Zinc-Lead District. Missouri, Kansas, And Oklahoma - Interim Report ? Introduction And Summary

    By L. C. Brichta

    The Tri-State zinc-lead catalog, compilation of which was initiated by the Bureau of Mines in August 1949, is designed to provide a continuing record of avail-able drill-hole logs and maps of mine dev

    Jan 1, 1955

  • DFI
    Wave Equation Technique For Estimating Driven Pile Capacity

    By Luo Yang

    A one-dimensional wave equation based algorithm for estimation of shaft and toe resistance of driven piles using High Strain Testing (HST) data is presented. The pile is represented by a uniform elast

    Jan 1, 2006

  • CIM
    Water Management and Effluent Treatment Practice

    By C. Larsen, E. Goodwin, E. Konigsmann

    "This paper describes the development of an innovative effluent treatment process for cyanide and heavy metal removal from tailings wastewaters at Hemlo Gold Mines Inc. Golden Giant operation.The impo

    Jan 1, 1989

  • NIOSH
    RI 7120 Hydraulic Mining Of Anthracite - Analysis Of Operating Variables

    By Wilbert T. Malenka

    A modified factorial experiment was used to determine the effect of operating factors in hydraulic mining of anthracite. Seven basic factors at various levels were considered. The significant factors

    Jan 1, 1968

  • SME
    Borehole Mining: Getting More Versatile

    By Marcus A. Wiley, Gregory Abramov

    Borehole mining (BHM) is a remotely operated method of extracting rock material through boreholes by high-pressure water jets. Figure 1 illustrates a BHM tool and fluids circulation. The tool consist

    Jan 1, 2004

  • AUSIMM
    The impact of the weighting error

    By G J. Lyman

    In sampling a process stream, conventional sampling theory deals only with the variation of the analyte content and neglects the impact of the variation in the mass flow on the sampling variance, whet

    May 9, 2017

  • CIM
    Recovery of thermal coal from waste dumps near Stellarton, Nova Scotia

    By L. C. Bird, N. T. L. Landgren, M. W. Mikhail

    "Through funds made available in 1972 by the Nova Scotia Department of Mines and Energy (DME) and the federal Department of Regional Economic Expansion, a program was initiated to recover saleable coa

    Jan 1, 1981

  • DFI
    New York City - A Review Of Various Foundation Problems And Solutions - Synopsis

    By Mel Febesh

    Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and

    Jan 1, 2000

  • DFI
    Vibratory Driver/Extractors Do More Than Drive Sheet Piles - Summary

    By John L. White

    Vibratory driver/extractors do more than drive and extract sheet piles. I would say more than sixty percent (60%) of the time, vibratory pile driver/extractors are engaged in work that has nothing to

    Jan 1, 1997

  • SME
    Are Estimators Getting It Right? Comparing Actual And Estimated Costs

    By J. Leinart

    As is readily apparent, the reliability of the early-stage costs estimated for any mining project are critical to the viability of that project. An estimate too high might leave a potentially profitab

    Feb 27, 2013