An Investigation into the Stand-up Time of Stopes at Birchtree Mine in Thompson ManitobaBy Matthew Violot
Vale Canada?s Birchtree Mine, located in Thompson Manitoba, has been experiencing problems with hanging wall / footwall dilution, as well as sloughing off of adjacent stopes and temporary stope block
Jun 1, 2012
-
Effect of Backfill Placement Method on Its Stability: A Dynamic Modelling Case StudyBy Muhammad Zaka Emad
Cemented rockfill (CRF) is a mixture of rock aggregate and binder slurry. It is a stiff backfill, it is fast curing, its operation is simple, placement rate is reasonably high and no drainage is requi
Jun 1, 2012
-
Numerical Investigation of Flow Regimes in Fractured Rock SlopesBy Jim Hazzard
A numerical investigation is presented to examine fluid flow in fractured rock slopes. In mining geomechanics, different numerical modelling approaches are used to estimate fluid pressures in open pit
Jun 1, 2012
-
Evaluating Immediate Mining Induced Ground Movement by Monitoring the Performance of the Primary Support SystemBy Wei Wei
Mining induced ground movement and/or stress redistribution could cause ground instability issues. This is particularly true when the extraction of large stopes is done with one or two large productio
Jun 1, 2012
-
Advances in In Situ Testing of Ventilation Control Devices for Underground MinesBy M Salu, G J. Kay
"As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id
Jun 1, 2012
-
Geomechanical Response to CO2 Injection for the Heartland Area Redwater Project (HARP), AlbertaBy Hamidreza Soltanzadeh
The injection of CO2 into a reservoir or aquifer can potentially result in deformation, induced fracturing and fault reactivation in the injection zone and/or the rocks that surround it. This paper re
Jun 1, 2012
-
Improved Input Parameters and Numerical Analysis Techniques for Temporary Support of Underground Excavations in Weak RockBy Jeffrey D. Oke
While significant progress in underground construction engineering has occurred in the past few decades, a number of fundamental deficiencies persist regarding the recognition, prediction, and mitigat
Jun 1, 2012
-
Numerical Simulation of Accumulated Damage in Critical Mine Infrastructure and Prediction of Further Damage Over Mine LifeBy Kathy S. Kalenchuk
Damages have been observed in shafts, backfill infrastructure and the slick line at the Leeville Mine. Shaft damage (shearing and spalling of the concrete liner) is attributed to mine-induced rock mas
Jun 1, 2012
-
Mine Environment Monitoring - So what has Changed Since Moura No 2?By D Cliff
"It has been 17 years since the mine disaster at Moura No 2 Mine in Queensland. Recent disasters in the USA and New Zealand prompt the question what has changed since 1994. This paper att emptsto answ
Jun 1, 2012
-
Combining Sources of Rock Mass Characterization Data for Stope DesignBy Karina Forster
Open stope design depends on the ore body geometry, loading conditions and rock mass properties to estimate stope dilution and ground support requirements. Rock mass conditions for design primarily re
Jun 1, 2012
-
Testing and Sampling Requirements for Input to Spontaneous Combustion Risk AssessmentBy B Beamish
"All underground coal mines in Australia are required to develop a Spontaneous CombustionManagement Plan (SCMP). The New South Wales Government has developed a guideline (MDG1006) to assist operations
Jun 1, 2012
-
The Design and Installation of a Booster Fan at Tahmoor CollieryBy M Ogle
"Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the
Jun 1, 2012
-
Microseismic Imaging and Hydrofracture Numerical SimulationsBy Will S. Pettitt
Fracture Network Engineering (FNE) is the engineering design of rock mass disturbance through the use of advanced techniques to model fractured rock masses numerically, and then correlate field observ
Jun 1, 2012
-
Planeamiento de minado subterráneo aplicando software mineroBy Ciro Manolo Alegre Huamán
El presente texto describe la metodología para el desarrollo del planeamiento de minado subterráneo a través del software minero y de técnicas matemáticas modernas. Así también es importante la base d
Jun 1, 2012
-
Ventilation Surveys and Model Building - A ConsultantÆs OpinionBy J Rowland
"This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough
Jun 1, 2012
-
Stochastic Approach to the Corrosion Assessment of Rock BoltsBy Francois Charette
Corrosion is a significant factor affecting the capacity and working life of ground support. The paper explores a relatively simple method to predict the load capacity of a support system using a Mont
Jun 1, 2012
-
Effect of Anisotropy of Permeability in Slope Stability of Large Open Pit MinesBy Azadeh Riahi
The main goal of this paper is to investigate the effects of permeability anisotropy in Large Open Pit (LOP) mines for problems that exhibit homogeneous anisotropic characteristics. The most important
Jun 1, 2012
-
Measured Convergence at a Test Tunnel in the Opalinus Clay Shale FormatiBy Renato Macciotta
The argillaceous formation known as the Opalinus Clay is host to the Mont Terri Underground Research Laboratory. The URL was developed to investigate the hydrogeological, geochemical and geotechnical
Jun 1, 2012
-
Overview of the Oil Sands Caprock Integrity ProjectBy Kristine Haug
Although most in situ operations in Alberta do not encounter significant problems during resource extraction, there have been a few documented occurrences of oil or steam releases as a result of compr
Jun 1, 2012
-
A System of Diluting Methane to Safe LevelsBy R Hughes
"Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.
Jun 1, 2012