Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Evaluating Techniques for Monitoring Rock Falls and Slope Stability (03558dcc-00ee-4336-8044-b80294644df0)

    By Edward McHugh

    While less than 1% of reported accidents are associated with slope stability problems. slope failures were responsible for about 15% of all U.S. surface mine fatalities between 1995 and 2001. Small ro

    Jan 1, 2002

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Determination And IT-Supported Evaluation Of Rock Mechanical Parameters And Their Utilization During Application Of Roof Bolting Techniques

    By Nikolaos Polysos

    For the planning and driving of gateroads supported by roof bolts a practical concept has been developed in order to determine the geological and rock mechanical parameters derived from exploration dr

    Jan 1, 2001

  • SME-ICGCM
    Mine Design Considerations For Surface Subsidence Control

    By John L. Edwards

    The underground coal mines in the Lake Macquarie area of the Newcastle Coalfield, New South Wales, Australia are constrained by surface subsidence restrictions as low as 150 mm. The mining environment

    Jan 1, 1993

  • SME-ICGCM
    Development of Geotechnical Procedures for the Analysis of Mine Seismicity and Pillar Designs

    By Hamid Maleki

    Mining in the Book Cliffs Coal Field of Utah has historically been associated with seismicity because of high-stress environments and the presence of stiff, competent rocks. Recognizing the geotechnic

    Jan 1, 2003

  • SME-ICGCM
    A Case Study Of A Deformation Mechanism Around A Two-Entry Gate-Road System Involving Probable Time-Dependent Behavior

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms around a longwall gate-road system in an underground coal mine. Of particular interest was roof defo

    Jan 1, 1995

  • SME-ICGCM
    Application Of Mechanical And Groundwater-Flow Models To Predict The Hydrogeologic Effects Of Longwall Subsidence - A Case Study

    By Danny J. Van Roosendaal

    An investigation was undertaken to determine hydrogeological effects of subsidence over a longwall coal mine in the Illinois Basin. At this mine, approximately 200 ft of bedrock overburden is overlain

    Jan 1, 1995

  • SME-ICGCM
    Method Of Selecting Suitable Types Of Powered Supports At Longwall Faces

    By S. M. Hsiung

    A model (support selection model) for the selection of suitable types of powered supports under various geological conditions is proposed. This model is developed by evaluating the support, performanc

    Jan 1, 1988

  • SME-ICGCM
    Rock Mechanics Study Of Lateral Destressing For The Advance-And-Relieve Mining Method (2bf3b56c-1393-4658-a2e4-6e9ace0d24dd)

    By Hamid Maleki

    The advance-and-relieve method benefits from lateral destressing associated with mining in laminated rocks and a high horizontal stress regime. This stress control method is based on measurements show

    Jan 1, 2003

  • SME-ICGCM
    Geotechnical Planning and Development of the BHP Minerals San Juan Pilot Mine, Waterflow, NM

    By P. E. Christensen

    Due to ever-increasing stripping ratios associated with the No. 8 Seam at the San Juan Mine surface operation, BHP Minerals decided to implement longwall mining for the extraction of the substantial f

    Jan 1, 1998

  • SME-ICGCM
    Risk Assessment: Multiseam - Single Seam Mining

    By L. Munsamy

    The bulk of primary mining at the Anglo Coal's Bank Colliery was carried out by drill and blast method, in a bord and pillar layout exploiting the No. 2 Seam. Secondary extraction, top/bottom coa

    Jan 1, 2004

  • SME-ICGCM
    Drag Picks - Influence Of Tool Geometry And Angle Of Arrack On The Stress Evolution And Cutting Efficiency

    During the last decade mechanical rock excavation has become increasingly widespread in the mining industry and, more in general, in excavation engineering. This technology, especially the tools and t

    Jan 1, 1990

  • SME-ICGCM
    Evaluation Of Existing Predictive Methods For Mine Subsidence In The U. S. (1ec2d374-5864-4775-9b19-24759c4f95be)

    By Vladimir Adamek

    Two existing predictive methods were chosen for evaluation; an influence function (Gals Theory) and a profile function (hyperbolic). These were applied to several field measured subsidence pro¬files o

    Jan 1, 1981

  • SME-ICGCM
    International Experience with Longwall Mining into Pre-driven Rooms (7f55d3bb-2127-4b96-860d-e3684bbd8397)

    By David Oyler

    Unusual circumstances may require that a longwall retreat into or through a previously driven room. The operation can be completed successfully, but there have been a number of spectacular failures wh

    Jan 1, 1998

  • SME-ICGCM
    Operational Experience With FLEXIBOLT Systems In Australian Coal Mines

    Since the initial development and trials of FLEXIBOLT flexible roof bolts, further comparative testing and product development has been completed as part of the changeover to this roof support system

    Jan 1, 1994

  • SME-ICGCM
    Manifestation Of Mine Pressure And Its Relations To Overlying Strata Movements

    By Z. C. Song

    [THIS PAPER WAS TRANSLATED FROM CHINESE TO ENGLISH BY S. S. PENG, WEST VIRGINIA UNIVERSITY] Immediately after coal extraction, the pressure that causes the movement of the surrounding strata is c

    Jan 1, 1982

  • SME-ICGCM
    Gateroad Pillar Extraction Experience at Jim Walter Resources

    By Gregory Hendon

    Jim Walter Resources, Inc. (JWR), has successfully longwall mined for many years at depths ranging from 1200'-2500'. However, full pillar extraction has proven difficult and generally econom

    Jan 1, 1998

  • SME-ICGCM
    Evaluation of Pillar Recovery in Southern West Virginia (0e64fb3d-0c07-4638-b455-a16004535ca1)

    By Chris Mark

    Pillar recovery continues to be a significant ground control hazard. During the past decade, 10 miners were killed during pillar extraction operations in southern West Virginia. Studies conducted duri

    Jan 1, 2002

  • SME-ICGCM
    Empirical and analytical design of large openings at a proposed national underground science laboratory

    By Karl Jr. Zipf

    The famous Homestake gold mine in Lead, SD. closed recently alter 125 years of operation. However, the mine may receive a new lease on life as a National Underground Science Laboratory (NUSL) supporte

    Jan 1, 2002

  • SME-ICGCM
    Hydraulic Prestressing Units: An Innovation In Roof Support Technology (6dbf7428-5679-47b2-a60c-95193c59dbda)

    By Thomas Barczak

    A new generation of hydraulic mine support prestressing devices has been developed. These thin-walled steel shells are machine-welded and can be inflated with water or any liquid to provide prestressi

    Jan 1, 2004