Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Contributions of the Alpha Foundation to Ground Control Research and Development

    By Tom Barczak, Julian Restrepo, Zach Agioutantis

    "The Alpha Foundation for the Improvement of Mine Safety and Health, Inc. (Foundation) was established as part of a Non-Prosecution Agreement (Agreement) entered in December 2011 by the United States

    Jan 1, 2016

  • SME-ICGCM
    Staubbekampfung An Schildausbau In Bruchbaustreben (Combating Dust On Shield Supports On Longwall Mining)

    By Wilfried Ufer

    [1. Einführung in die Problematik 1.1 Die Bedeutung des Schildausbaus Seit fast 30 Jahren ist die Konkurrenzsituation auf dem Primärenergiemarkt der Bundesrepublik Deutschland durch einen von Erdöl

    Jan 1, 1984

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009

  • SME-ICGCM
    The In-Situ Pillar Strength and Overburden Stability in U.S. Mines

    By Hamid Maleki

    Prudent design of coal pillars in any mining system requires an estimation of in-situ pillar strength, overburden lateral load transfer capability, and a failure criterion. Pillar strength is typicall

    Jan 1, 2008

  • SME-ICGCM
    Study on Appropriate Support System and Control Criteria for Main Roadway under Weak Geological Conditions in Indonesia

    By Takashi Sasaoka, Hiroshi Takamoto, Akihiro Hamanaka, Pongpanya Phnthoudeth, Hideki Shimada, Jiro Oya

    "Indonesia is the second largest coal exporter to Japan, accounting for about 30 Mt annually. They produced over 400 Mt in 2015, over 99% of which is from open-cut mines. However, the conditions of su

    Jan 1, 2017

  • SME-ICGCM
    Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, China

    By W. C. Lacy

    Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl

    Jan 1, 1989

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996

  • SME-ICGCM
    Multiple Seam Highwall Mining In Appalachia (428a0473-c28a-4ef9-81d1-1ed7e6911c69)

    By David Newman

    Multiple seam underground coal mining is ubiquitous in Appalachia. Many coal properties have from two to ten or more economically mineable coal seams. Because of the ability to penetrate 600-feet to

    Jan 1, 2009

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • SME-ICGCM
    Effect of Faults on the Movement of Roof Strata in Gateroads

    By Panfeng Gou

    In order to solve the problems of supporting the roof of the gateroads affected by a fault, the movement characteristics of roof strata must be fully understood. In this paper, a plane stress physical

    Jan 1, 2006

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME-ICGCM
    A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design Premises

    By Thomas M. Barczak

    The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a

    Jan 1, 2006

  • SME-ICGCM
    Feasibility Study And Design Of A New Underground Coal Mine Developed From Open Cut Highwall In Indonesia (25d3d094-fa9d-4970-a166-6a4fe20badce)

    By Takashi Sasaoka

    About 200 M tons of coal were imported into Japan in 2007 and Indonesia was its second largest exporter, accounting for about 30 M tons (12% of the total imported coal). Indonesia produced about 200 M

    Jan 1, 2009

  • SME-ICGCM
    A Sonic Wave Attenuation Technique For Monitoring Of Stress Levels

    By Po-Ming Lin

    Stress has a significant effect on the stability of pillars. In order to get an accurate picture of pillar stability, one needs information not only on the primary Stress distribution but also on all

    Jan 1, 1984

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ Monitoring

    By Andreas Hucke

    For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry

    Jan 1, 2006

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007