The influence of conditional bias in optimum ultimate pit planningBy E. J. Magri, A. Couble
Kriging estimates of geological resources are sometimes conditionally biased because the kriging plan contains too few samples. This may be done purposely in order to match the variance of the estimat
Jan 1, 2003
-
A Perspective Of Marine Mining Within De BeersBy K. Richardson
Although the De Beers group has a long history of placer mining on land, the group only became actively involved in deep water marine diamond exploration and mining in1983 with the formation of De Bee
Jan 1, 2007
-
A Practical Approach To Plant Scale Flotation OptimisationDeciding on plant-scale reagent dosage regimes and air rates is a topic of ongoing investigation and high importance. The current work explains some techniques that have proven useful in deciding on p
Jan 1, 2012
-
MECS catalyst products and technical services update - SynopsisBy C. D. Winkler
Vanadium-based sulphuric acid catalyst has been utilized to oxidize SO2 to SO3 since the early 1900s. This versatile product displaced the expensive and easily poisoned platinum-based catalyst in near
Jan 1, 2009
-
A Newly Developed Plaster Stemming Method For Blasting - SynopsisBy H. Cevizci
In this study, a newly developed plaster stemming method is studied and compared with the usual dry drill cuttings stemming method for surface blasting in mines and quarries. Drill cuttings are genera
Jan 1, 2012
-
A Methodology for Laboratory Testing of Rockbolts Used in Underground Mines under Dynamic Loading ConditionsBy A. Pytlik, W. Masny
"Underground mining is subject to various natural hazards such as seismic events, rockbursts, fire, and gas (methane). In general, an increase in the extraction depth causes an increase in the likelih
Jan 1, 2016
-
Multivariate Resource Modelling For Assessing Uncertainty In Mine Design And Mine Planning ? Synopsis (ba3d1ca9-d905-4b9a-85ef-6112346fbb70)By C. Montoya
This paper shows, through a case study, the impact of multivariate grade modelling upon mine design and mine planning. A deposit explored by drill holes is considered, in which the grades of five elem
Jan 1, 2012
-
The computational analysis of shallow depth tabular mining problems - SynopsisBy J. A. L. Napier
The evaluation of stress distributions and deformations in the vicinity of tabular mine layouts has been carried out routinely for many years using the displacement discontinuity boundary element meth
Jan 1, 2007
-
Management of seismic and swelling groundBy P. N. Erasmus
This paper considers the fundamental concepts of support design for underground openings in highly stressed ground. It concludes that the conventional deformed reinforcing bar, woven mesh and cable la
Jan 1, 2009
-
Liquid-Liquid Extraction Of Copper (II) From Chloride Media By Cyanex 923 In Kerosene ? SynopsisBy N. B. Devi
The extraction of Cu(II) from HCl media using Cyanex 923 in kerosene was investigated. The effect of shaking time, aqueous phase acid concentration, extractant concentration, chloride ion concentratio
Jan 1, 2012
-
Strategy Towards a Mining Industry-Wide Buyand- Maintain Quiet Initiative to Reduce Noise Induced Hearing LossBy H. Gumede
The challenges of noise emission in the mining industry are well known. These challenges are exacerbated by the increasing trend towards mechanized mining, and there is general consensus that an effec
Jan 1, 2014
-
Unique Fall-of-Ground Prevention Strategy Implemented at Two Rivers Platinum MineBy A. Esterhuizen
Since 2005 Two Rivers Platinum Mine has set out on an initiative to actively monitor and control ground conditions on a daily basis, by making use of borehole cameras and pro-actively amending the sup
Jan 1, 2014
-
Coal preparation research in South Africa - SynopsisBy G. J. de Korte
South Africa is reliant on coal for the generation of almost all the electricity used in the country, and several large industrial concerns such as Sasol are also coal based. Research relating to the
Jan 1, 2010
-
Early start and late start algorithms to improve the solution time for long-term underground mine production scheduling - SynopsisMixed integer programming (MIP) has been used for optimizing production schedules of mines since the 1960s. The major problem in the long-term production scheduling for an entire orebody is that the n
Jan 1, 2008
-
The impact of caring relationships on safety performance: ?reaching the hearts and minds of people? - SynopsisBy J. Loubser
The concept of caring is in most cases confused with material needs and not psychological needs. By giving employees a job, most managers think that employees should be grateful and return the favour
Jan 1, 2010
-
Managing Mine Road Maintenance Interventions Using Mine Truck On-Board DataBy Willem J. Marais
The management of unpaved mine road networks on large surface mines rarely results in optimal road maintenance strategies and minimised total road-user costs. This is ascribed mostly to the complex a
Jan 1, 2008
-
Prediction Of Blast Induced Ground Vibrations In Karoun III Power Plant And Dam: A Neural NetworkBy M. Kamali
In this research, in order to predict the peak particle velocity (PPV)(as vibration indicator) caused by blasting projects in the excavations of the Karoun III power plant and dam, three techniques in
Jan 1, 2010
-
pH advanced process control solution for Impala BMR first stage high pressure acid-oxygen leach - SynopsisBy A. F. Khan
The CSense advanced process control (APC) solution?s main objective was to improve the stability of the pH in the first stage leach process thereby improving nickel and iron extraction efficiencies an
Jan 1, 2009
-
Prediction Of Slope Failure At Letlhakane Mine With The Geomos Slope Monitoring SystemBy George Kayesa
[ ] A multiple-bench slope failure occurred at Letlhakane mine on 14th July 2005. No injuries or damage to equipment was suffered and mining production was not affected. Slope failure was precede
Jan 1, 2006
-
The use of Information Technology in the Mineral Resource Management environmentBy J. van Zyl Visser
The advancement in Information Technology has resulted in a change in workflow practice in our Mineral Resource Management (MRM) offices on the mines and at our corporate office. This paper discusses
Jan 1, 2003