Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Phasing Out Reverberatory Furnace Operations At KCM NkanaBy M. Natarajan, C. J. Cutler, E. Mponda
Keywords: Pyrometallurgy, furnace, KCM Nkana, Zambia The Nkana smelter was initially commissioned in 1931, with two reverberatory furnaces, two Peirce-Smith converters, and blister copper casting
Jan 1, 2006
-
Computational fluid dynamic modelling of a waste-heat boiler associated with flash smelting of base metal sulphides - SynopsisBy J. J. Bezuidenhout
The waste-heat boiler is used within the Sulphide flash smelting process as the main dust and energy recovery unit. The large volume of off-gas discharged from the flash smelter is at a very high temp
Jan 1, 2008
-
"The Advantages Of Ili Inspection And Practical Issues Involved In Undertaking Projects". - IntroductionBy Ernie Holden, Chris Ringas
In the last 20 years, In Line Inspection (ILI) using intelligent pigs has become the principal tool used by pipeline operators to assess the condition of their pipelines. New pipelines are normally de
Jan 1, 2006
-
Mine Disaster and Mine Rescue Training Courses in Modern Academic Mining Engineering ProgrammesThe mining industry worldwide is currently facing a significant restructuring process. In most underground mines, widespread mechanization of the mining processes increases production while reducing s
Jan 1, 2014
-
Mine disaster and mine rescue training courses in modern academic mining engineering programmes (70cf64eb-7ce2-4e61-b78d-364fa22d3992)By N. Henderson, J. Weyer, J. F. Brune
"The mining industry worldwide is currently facing a significant restructuring process. In most underground mines, widespread mechanization of the mining processes increases production while reducing
Jan 1, 2014
-
A Review Of Undergraduate Teaching And Postgraduate Research In Pyrometallurgy At The University Of StellenboschKeywords: Stellenbosch, university, teaching, research The pyrometallurgical activities at Stellenbosch University are reviewed in this paper. The history of the activities, both in teaching and r
Jan 1, 2006
-
Development And Implementation Of A Novel Pressure Leach Process For The Recovery Of Cobalt And Copper At Chambishi, ZambiaBy E. Munnik
The Chambishi Metals Cobalt Plant in Zambia has recently installed a novel oxidation/precipitation pressure leach process as part of the COSAC (CObalt from Slag And Copper as by-product) Project. Anir
Jan 1, 2003
-
A pragmatical physics-based model for predicting ladle lifetimeBy S. T. Johansen, B. T. Løvfall, T. Rodriguez Duran
In this paper we develop a physics-based model for lining erosion in steel ladles. The model predicts the temperature evolution in the liquid slag, steel, refractory bricks, and outer steel shell of t
Apr 16, 2024
-
Flotation of weathered coal discards using a HIP W/O emulsion binder and keroseneBy P. M. Mashaba, S. O. Bada
An advanced high internal phase water-in-oil (HIP W/O) emulsion binder and flotation with an internal dispersed water phase of 95 vol% was used to beneficiate South African weathered coal from discard
Aug 2, 2022
-
Structural and Electrical Characteristics of Printed Silver and Palladium Nanoparticle NetworksBy C. B. van den Berg
n this study, silver and palladium nanoparticulate inks with different metal-binder ratios were screen-printed onto a paper substrate. The printed layers comprised the metal nanoparticles and an ethyl
Jan 1, 2014
-
The Impact Of The Draft Mineral And Petroleum Resources Royalty Bill On Gold Mine Reserves (7126a81e-7d07-4922-8a31-925a1ca29865)The latest Draft MPRRB was released for public comment in October 2006. The main purpose of the Bill is to collect royalties at mines developed in terms of new-order mineral rights granted through th
Jan 1, 2007
-
Increasing the efficiency of secondary resources in the mining and metallurgical industryBy G. Jandieri
An improved methodology is presented for assessing the economic feasibility and effectiveness of recycling industrial waste. The methodology is based on the break-even control mechanism, but at the sa
Jan 26, 2023
-
The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)By V. Mathebula
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv
Jan 1, 2004
-
Regional mineral beneficiation policy interventions in the SADC: Stakeholder perspectives, B.E. Isheloke and H. von BlottnitzBy H. von Blottnitz, B. E. Isheloke
Mining is a significant economic activity in most Southern African Development Community (SADC) countries, and mineral beneficiation has been identified, and controversially discussed as one of the po
Jan 1, 2020
-
Grinding media quality assurance for the comminution of gold oresThe current global economic climate has adversely affected the resources industry in general. For the gold mining industry, even though the gold price has been stable as compared to other resources, t
Jan 1, 2009
-
The integration of mine simulation and ventilation simulation to develop a ‘Life-Cycle’ mine ventilation systemBy S. G. Hardcastle, C. K. Kocsis
In Canada’s metal mines, ventilation, which requires electricity to operate the fans and fossil fuel for heating, accounts for a significant portion of the overall mine’s underground power consumption
Jan 1, 2003
-
Geomechanics Challenges of Contemporary Deep Mining: A Suggested Model for Increasing Future Mining Safety and ProductivityThis paper pays tribute to the pioneers in geomechanics, and addresses some of the most pressing issues of our time related to deep mining, and how to mitigate these issues. Solutions developed by our
Jan 1, 2014
-
Study of variation in strength parameters before slope stability analysisAbstract A new approach is introduced for study of the behaviour of geotechnical strength parameter prior to slope analysis to ascertain whether strength parameters of slope materials are homogenous
Jan 1, 2003
-
Introducing new Council members (8abfb381-4e73-40b7-9db7-58d2171c5e01)Mr K.R. Beard was born on 19th December, 1958. He attended Marist Brothers College, Observatory, and Marist Brothers College, Linmeyer. He was awarded a bursary by SEIFSA (Steel and Engineering Indu
Jan 1, 1989
-
Design and development of a low noise rockdrillBy R. W. Ottermann, N. D. L. Burger, A. J. von Wielligh, P. R. de Wet, J. L. Steyn
A low noise blast hole drilling system was developed to limit the risk of noise induced hearing impairment in mining operations. Noise induced hearing loss has been identified as a major occupational
Jan 1, 2003