    Experiences With Heavy Drop Hammer Testing Of Rock-Socketed Shafts

    By Frank Rausche

    Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust

    Jan 1, 2006

  • DFI
    High Capacity Piles In The Hamilton Bayfront Area

    By C. D. Thompson

    Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad

    Jan 1, 1987

  • DFI
    Prediction And Calculation Of Construction Vibrations - Summary:

    By Mark R. Svinkin

    Construction-induced vibrations may be detrimental to adjacent structures and sensitive electronics operating nearby. Construction vibration sources have a wide range of energy and velocity, as a func

    Jan 1, 1999

  • DFI
    Case History: Foundations For The New Mississippi River Bridge, St. Louis

    By Paul J. Axtell

    This case history describes the foundation design and construction for the New Mississippi River Bridge, presently under construction in St. Louis, Missouri. The 1,500 ft (457.2 m) main span of the c

    Jan 1, 2011

  • DFI
    Behavior Of Large Bored Piles With Grouted End

    By Zhang Yaonian

    This paper describes full-scale tests on ten large bored piles with grouted end conducted for three projects in the urban area of Fuzhou city. Test program included site investigation, pile installati

    Jan 1, 2004

  • DFI
    Eglinton Crosstown, a New Step in Toronto’s Subway System

    By Lars Richter, Franz-Werner Gerressen

    "The Eglinton Crosstown Line was conceived as the Eglinton Crosstown LRT, a partially underground light rail line, announced in 2007 as part of the Transit City plan, which included the implementation

    Jan 1, 2017

  • DFI
    Conventional And Box-Shaped Piled Rafts

    By Heinz Brandl

    Box-shaped pile and diaphragm wall foundations have proved suitable for transferring heavy loads of bridges, power plants, tanks, towers or other buildings in a concentrated form into the ground. The

    Jan 1, 2002

  • DFI
    Reflections On Our Industry - Foundation Vs Geotechnical

    By Arturo Ressi di Cervia

    From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in

    Jan 1, 2000

  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • DFI
    Jet Grouting And Safety Of Tuttle Creek Dam

    By Timothy D. Stark

    Jet grouting has increasingly become a ground improvement technology used to address seepage concerns and provide strength improvement to soils underlying dams. The technique of jet grouting uses high

    Jan 1, 2012

  • DFI
    Reliability of the Bearing Capacity of Axial Piles Using In Situ Tests

    By António A. Henriques, António Gomes Correia, Ana Teixeira

    "Abstract Pile foundations are often used for important structures, and thus, reliability evaluation is an important aspect of the design. Reliability methods have become increasingly important as dec

    Jan 1, 2014

  • DFI
    Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Innovative Drilled Shaft Installation Process Through Existing Bridge Foundations

    By Tracy Brettmann

    The Highway 146 Bridge Expansion Project across the Clear Creek Channel in Houston, Texas was designed on driven precast concrete piles. However, during construction, the piles along one side of the b

    May 1, 2022

  • DFI
    Some Experience With Large Diameter Caissons ? Synopsis

    By I. H. Wong

    The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee

    Jan 1, 2010

  • DFI
    Optimal Subsurface Investigation Approach for Overhead Transmission Structures

    By Haijian Shi, Drew Pizzo

    This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl

    Jan 1, 2018

  • DFI
    Cut-Off Walls For Diamond Mining In The Arctic

    By Wolfgang G. Brunner

    A 3800 m long temporary water-retaining dike has been constructed under extreme conditions in the harsh northern climate to enable two of the kimberiite pipes at the Diavik Diamond Project reserve to

    Jan 1, 2003

  • DFI
    Evaluation Of The Group Equivalent Pile Approach For Laterally Loaded Shafts

    By Cheng Lin

    The Group Equivalent Pile (GEP) approach was proposed by researchers to analyze a laterally loaded pile group. This approach enables engineers to evaluate the behavior of a pile group in single pile a

    Jan 1, 2009

  • DFI
    A Comparison Of Open Drilled Shafts To Temporarily Cased Drilled Shafts In Clay Soil

    By W. Tom Witherspoon

    Many Engineers are skeptical and cautious about skin friction factors for the portion of drilled piers where temporary casing is used. This has led Texas engineers in many cases to eliminate skin fric

    Jan 1, 2009

  • DFI
    Technical Note - Hollow Threaded Rebar For Cross Hole Sonic Logging Access Tubes Combined With Longitudinal Concrete Reinforcing In Drilled Shafts

    By Josef K. Alter

    Crosshole Sonic Logging (CSL) of drilled shafts requires 1.5-in (38-mm) or 2-in (51-mm) I.D. sonic access tubes to be installed inside the steel reinforcement cage. The sonic access tubes do not contr

    Jan 1, 2011

  • DFI
    The Synergy Between Theory And Practice In Geo-Engineering

    By Bas R. Hemmen

    GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper

    Jan 1, 2006