Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reducing Construction Interference when Implementing Geotechnical Instrumentation and Monitoring in Urban Excavation ProjectsBy Martin B. Hudson, Daniel Brescia, Zhangwei Ning
Due to the complexity and sensitivity of surrounding environments, instrumentation and monitoring (I&M) is critical for many urban deep excavations. The objects to be monitored include shoring bulkhea
Jan 1, 2018
-
Lateral Performance Of Two-Section Helical Piles In Soft SoilsBy Mohammed Sakr
A Two-Section Helical Pile (TSHP) is a steel pipe with two shaft sections of different diameters and with one or more helix plates near the bottom of each shaft section. TSHPs are used regularly in we
Jan 1, 2009
-
Pile Load Test Results Using The New Statnamic MethodBy Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Resolution Of Prestressed Concrete Pile Splice Problems - SummaryBy David Siu
Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea
Jan 1, 1991
-
Innovative Design At Lake LenexaBy Jacques Moraille
The public is asking for more aesthetic designs if they can be proven cost-effective at providing an appealing element to new dams. Lake Lenexa was designed and built around the idea of providing for
Jan 1, 2009
-
Reconstruction Of Hudson River Pier 86 - Home Of The USS Intrepid Aircraft CarrierBy Michael Quadagno
Hudson River Pier 86, home of the historic USS Intrepid Aircraft Carrier and the Intrepid Sea-Air-Space Museum, is currently undergoing a $30M reconstruction. This project involves the demolition of t
Jan 1, 2008
-
Foundation Retrofit Design and Construction for the Benicia-Martinez Bridge, Martinez, California - 1998 DFI Annual Conference October 7th-9th, 1998 Seattle, WashingtonBy Roy A. Imbsen
Following the 1989 Loma Prieta earthquake, California Department of Transportation (Caltrans) expedited an effort to evaluate and retrofit important state-owned toll bridges to enhance performance of
Jan 1, 1998
-
Practical Aspects Of Compensation Grouting ? SynopsisBy Philip J. H. Ball
The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial
Jan 1, 2000
-
Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay CampusBy Robert E. Fosse
Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr
Jan 1, 2002
-
Pittsburgh Steelers Stadium - Deep Foundations Case StudyBy Larry Rayburn
In the spring of 1999, construction commenced on the new Steelers Football Stadium in downtown Pittsburgh, Pennsylvania. Richard Goettle, Inc. (RGI) was the successful bidder to install the specified
Jan 1, 2001
-
Tapertube ™ PilesBy Alexander Filotti, Stanley Merjan
"Abstract. The paper shows the benefits and accomplishments of this relatively new but established product on the pile foundations market in the United States. The first part of the paper describes ge
Jan 1, 2014
-
-
Drilled Shaft Foundations For The KcICON Missouri River BridgeBy Paul J. Axtell
The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M
Jan 1, 2009
-
Automated Installation Monitoring For Augercast And Driven PilesBy Garland Likins
Where soil conditions are favorable, augercast piles have significant economic advantages, but they also have some uncertainty due to the in construction methods. To confirm structural integrity, stat
Jan 1, 1999
-
List Of DelegatesAUSTRALIA CHAPMAN Gary JOHN WAGSTAFF CONTSRUCTIONS PTY. LTD. 1 Ashgrove Crescent 4060 ASHGROVE BRISBANE HILLAR Jaaes Director J.A. HILLAR & ASSOCIATES 99 Woolwich Road WOOLWICH,
Jan 1, 1994
-
Drivability Of Piles By VibrationBy Don C. Warrington
This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving
Jan 1, 1989
-
Installation, Design, And Quality Control Of Augercast Piles ? IntroductionBy William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990
-
Ground Movements - A Hidden Source Of Loading On Deep Foundations (211df4c9-c07d-4182-8335-8f47bcc59b12)By Harry G. Poulos
Ground movements can arise from a large number of sources and can have a significant effect on nearby piles and deep foundations. The loading of the piles by ground movements is a different mechanism
Jan 1, 2007
-
Environmental Considerations For Foundation Construction In The Boston Area - The New MCPBy James V. Errico
On October 1, 1993 the regulations for assessing and cleaning up contaminated soil and groundwater in the Commonwealth of Massachusetts were revised. These new regulations, known as the Massachusetts
Jan 1, 1994
-
Building Response To Construction ActivitiesBy Marco D. Boscardin
Control and mitigation of building response to construction activities are assuming a greater role in design decisions for underground construction. Alternatives for controlling building response have
Jan 1, 2003