Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geology of the Two Duck Lake Intrusion and the Marathon Cu-PGE Deposit, Coldwell Complex, Northern Ontario

    By Richard Dahl, Richard P. Taylor, David H. Watkinson

    "Abstract - Detailed mapping of the Eastern Gabbro, Coldwell Complex, Ontario, revealed that the copper and platinum-group-element deposit on the Marathon property is confined to a coarsegrained to pe

    Jan 1, 2001

  • CIM
    Properties of Some High Aluminum Zinc Base Die Casting Alloys

    By O. A. Carson

    "IntroductionTHE ZINC-BASE die casting alloys in common usage contain approximately 4 per cent aluminum as the major alloy element. In addition, they contain about 0.05 per cent Mg .and may• have a sm

    Jan 1, 1953

  • CIM
    Optimizing Plant 2 at Kinross Paracatu, the World’s Largest Tonnage, Lowest Grade Primary Gold Milling Operation

    By Kevan Ford, Getulio Junior, Rob Henderson, Wayne Philips, Chris Martin, Rob Thorpe

    "Plant 2 at the Kinross Paracatu gold operation in Minas Gerais State, Brazil, was commissioned in late 2008. Designed to be the largest tonnage, lowest grade gold milling operation in the world, Plan

    Jan 1, 2011

  • CIM
    Water Power in British Columbia

    By Ernest Davis

    WATER power, until developed, produces nothing, but when harnessed it continues to produce, it might be said, indefinitely. Hence the importance of developing all feasible water powers. British Colu

    Jan 1, 1942

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    Constitutive Model for Numerical Modelling of Highly Stressed Heterogeneous Massive Rocks at Excavation Boundaries

    By M. C. Villeneuve

    A numerical modelling approach was developed to explicitly simulate geomechanical characteristics of intact rock: mineralogy, grain size and fabric. The approach involved creating a representative con

    May 1, 2009

  • CIM
    Simulating the Mine-Mill Interface

    By J. A. Meech, G. R. Baiden

    "A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru

    Jan 1, 1987

  • CIM
    Process Improvement Update at Brunswick Mine

    By Jodi Roberts, Curtis Deredin, Jean-Guy Paulin

    "Since the establishment of the Six Sigma quality improvement program in 2001, several projects have been successfully carried out in the copper-lead, zinc, copper separation, lead upgrading and bulk

    Jan 1, 2008

  • CIM
    Improving the Gold Gravity Performance: an Investigation into the Laboratory and Plant Gravity Recoveries

    By Sunil Koppalkar, Guillaume Noel, Ahmed Bouajila, Makni Sami, Claude Gagnon

    "Gold gravity recovery circuits utilizing enhanced gravity separators have become an integral part of many of the modern gold processing plants. Thus, efforts to improve the operating efficiency have

    Jan 1, 2011

  • CIM
    Forecasting copper prices in the short and medium terms using geostatistics

    In this paper, geostatistical techniques are applied to forecast the annual copper price in the short and medium terms (from one to five years ahead). These techniques allow the incorporation of month

    Sep 1, 2004

  • CIM
    Forecasting copper prices in the short and medium terms using geostatistics (85ec8f44-0e97-49ec-a0bf-7fb69134cd4d)

    By A. Cabañas

    "In this paper, geostatistical techniques are applied to forecast the annual copper price in the short and medium terms (from one to five years ahead). These techniques allow the incorporation of mont

    Jan 1, 2004

  • CIM
    Analysis Of LEFM Parameters And Fatigue Propagation Of Sent Cracked Am6ob Magnesium Specimens

    By Nur Hossain

    Analysis of Linear Elastic Fracture Mechanics (LEFM) parameters via the Virtual Crack Closure Technique (VCCT) has been obtained for SENT specimens of AM6OB magnesium alloy. It is found that the ratio

    Jan 1, 2010

  • CIM
    Update of Span Design Curve for Weak Rock Masses

    By Andrea M. Ouchi

    A major focus of ground control research presently being conducted by the Geomechanics Group in the University of British Columbia Mining Engineering Department is to incorporate weak rock masses (RMR

    May 1, 2004

  • CIM
    Benefication of Low Grade Ore at the Detour Lake Mine

    "The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or

    Jan 1, 2016

  • CIM
    A simplified equation for estimating the total vapour pressure of cryolitic melts

    By Edgar Dernedde

    Cryolitic melts at a temperature of about 960 °C are used in reduction cells to dissolve alumina and to produce primary aluminium. At these temperatures cryolitic melts with an acidic composition have

    Jan 1, 2004

  • CIM
    Community Engagement Best Practice in the mining sector: What?s recommended and who?s using it?

    By Ben Bradshaw

    Context ? Community engagement has become an increasingly significant and challenging part of mineral exploration and mine development; indeed, opposition from communities proximate to a proposed min

    May 1, 2010

  • CIM
    Dynamic Testing of Threadbar used for Rock Reinforcement

    A comprehensive axial test program has been undertaken at the WASM Dynamic Test Facility on the performance of 20mm threadbar. The threadbar tests had a double embedment configuration, with variation

    May 1, 2009

  • CIM
    Corrosion properties of skin and bulk of semi-solid processed and high pressure die cast AZ91 alloy

    By C. Blawert

    The corrosion properties of the skin and the bulk of semi-solid processed and high pressure die cast AZ91 alloy were studied in 5% NaCI solution by (a) analysing the corrosion morphology, (b) measurin

    Jan 1, 2004

  • CIM
    Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 Catalysts

    By M. Kinne

    Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM

    Oct 1, 2003

  • CIM
    Employing a Virtual Reality Tool to Explicate Tacit Knowledge of Machine Operators

    By A. Vasenev

    The quality and durability of asphalted roads strongly depends on the final step in the road construction process; the profiling and compaction of the fresh spread asphalt. During compaction machine o

    Aug 1, 2013