Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Evaluation of wood packwall supports

    By William D. Gallant, Thomas M. Barczak, Carol Tasillo

    "This paper describes the results of full-scale testing of several multi-layered wood crib configurations that were tested in the Bureau of Mines mine roof simulator in cooperation with the Cape Breto

    Jan 1, 1991

  • CIM
    Operations engineering and management: Cradle to grave

    By W. Curlook

    "A review is presented of a growing number of imperatives, some self-imposed, some imposed by society, which the mining and metals industry faces in carrying out its business. These imperatives bear o

    Jan 1, 1992

  • CIM
    Temporal Tomography of Rock Density Using Muon Measurements with TPC-Micromegas

    By I. Lazaro Roche, J. Brunner, J. Busto, X. Martin, J. B. Decitre, S. Gaffet, F. Hivert

    "Muon tomography allows investigating the subsurface. Muons being penetrative, the attenuation of the muon flux depends on the quantity of matter the particles travel through, hence on the rock densit

    Jan 1, 2015

  • CIM
    Altered Mining Extraction Sequence and Rock Mass Response in Vale 402 OB at Creighton Mine

    By C. Denis Thibodeau

    Outline Introduction 402 OB Mining Sequence Trial to Verify Sequence Change Monitoring Observations Numerical Modelling Conclusion

    May 1, 2013

  • CIM
    Automatic Dumping Cage at the Coniaurum Mine

    By L. G. Morrell

    Introduction A Self-Dumping cage which combines the features of a small skip and a cage has been used in a vertical winze between the 2,000 and 2,500 levels at the Coniaurum mine for the past three y

    Jan 1, 1933

  • CIM
    Water Policy at Inco Metals Company Mills Ontario Division

    By H. R. Butler

    "The Ontario Division of Inca Metals Company, a Unit of Inca Limited, operates eleven mines, four mills, three refineries, one smelter and one iron ore recovery plant. All but one mine, mill and refin

    Jan 1, 1980

  • CIM
    Geochemistry of Komatiites in the Abitibi Greenstone Belt and Implications for Their Mineralization Potential

    By R. A. Sproule

    Abitibi Greenstone Belt ? ~2.745 to 2.680 Ga (U-Pb zircon ages) ? Several lithologically-distinct and structurally repeated(?) assemblages ? Represents: ? Allochthonous terranes? ? Single autoch

    May 1, 2003

  • CIM
    Development of a New Method for Aggregate Quality Control In Rock Quarries

    By H. Tudeshki

    A great amount of aggregate is utilized in civil engineering applications such as road construction, railway infrastructure, concrete production, etc. Igneous rocks are the preferred raw material due

    Aug 1, 2013

  • CIM
    The start-up and operation of the Gibraltar Mines SX-EW Plant

    By J. C. O'Rourke

    "Gibraltar Mines Ltd. has been operating its open pit copper mine for fifteen years. In that time, over 140 million tons of waste and low-grade material has been placed on the mine waste dumps. Labora

    Jan 1, 1988

  • CIM
    CHILE - Fission Track Thermochronology of the Domeyko Cordillera, Northern Chile: Implications for Andean Tectonics and Porphyry Copper Metallogenesis

    By Victor Maksaev, Marcos Zentilli

    "Abstract - The Domeyko Cordillera, the westernmost uplifted crustal block of the composite High Andes of northern Chile (20°S to 28°S) hosts a narrow N-S trending belt of Late Eocene-Oligocene giant

    Jan 1, 1999

  • CIM
    Two steps to energy management

    By T. B. Armstrong

    "The energy situation is extremely fragile and there is a critical need for energy conservation in the short term and development of new technology in the long term. To keep tabs on energy flow, separ

    Jan 1, 1980

  • CIM
    Simulation of the Bond grindability test

    By V. K. Karra

    "A simplistic algorithm jar simulating the rod or ball mill Bond grindability test applied to ores and minerals is presented. A performance comparison between the present algorithm and a previously pu

    Jan 1, 1981

  • CIM
    Iron Hydrolysis in the Direct Nickel Process

    By F. McCarthy, R. McDonald, G. Woodbridge, G. Brock, D. Robinson

    "The Direct Nickel process is a hydrometallurgical technology being developed to treat nickel laterite ores by leaching at atmospheric pressure. The leaching process uses nitric acid in a relatively l

    Jan 1, 2016

  • CIM
    Continued development of copper flotation control at the Kidd Creek concentrator

    By Philip Thwaites

    "Automatic flotation control in varying degrees of sophistication is practiced at a number of concentrators throughout the world. Practically, the variable conditions in the flotation circuit and the

    Jan 1, 1983

  • CIM
    Fe Skarn, Iron Oxide Cu-Au, and Manto Cu-(Ag) Deposits in the Andes Cordillera of Southwest Mendoza Province (34°-36°S), Argentina

    By I. B. Schalamuk, R. E. de Barrio, M. J. Pons, M. B. Franchini, L. Meinert

    "Several Fe, Fe-Cu, and Cu-Ag prospects hosted by Mesozoic carbonate-rich sedimentary rocks that were intruded by diorite stocks define an approximately 20 × 200 km belt along the Andes Cordillera of

    Jan 1, 2007

  • CIM
    Deep overburden shaft collar - Musselwhite project case history

    By George S. Martin, Michael D. Winship

    "Placer Dome Inc. is the operator of the Musselwhite project located 100km north of Pickle Lake, Ontario. J.S. Redpath Limited was contracted to conduct an underground exploration program using shaft

    Jan 1, 1989

  • CIM
    The Noranda Process after six years of operation

    By A. G. Storey, J. B. W. Bailey

    "The Noranda Process at the Horne Division ofNoranda Mines Limited now smelts approximately 350,000 short dry tons of concentrate a year, which is 40% of the total smelter throughput. Campaigns are av

    Jan 1, 1980

  • CIM
    A new approach to cemented backfill design

    By G. Swan

    "The selection of material comprising a backfill is, of economic necessity, site dependent. Nevertheless, given the existing range of typical components-coarse waste, alluvial sand, tailings a balance

    Jan 1, 1985

  • CIM
    Performance of the Lomex 34-foot variable speed mill

    By J. G. Mieczaniec

    "A key element for a successful mining operation is the grinding circuit. It must be reliable, maintainable and must perform to or above design capacities for 95% of the time. Once chosen and installe

    Jan 1, 1985

  • CIM
    Baymag - high-purity magnesium oxide from natural magnesite

    By Hagen B. Schultes

    "Refratechnik, a leading German refractory company, acquired a majority shareholding in Baymag in 1979. This acquisition included the mining rights for a magnesite deposit of exceptionally high purity

    Jan 1, 1986