Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Large Flotation Cell Operation at Falconbridge Copper Limited – Opemiska Division

    By J. R. Maxwell

    In 1970 expansion was completed increasing mill capacity from 2,000 to 3,000 T.P.D. Actual grinding capacity is 3,400 T,P,D. at a grind of 60% -200 mesh,The ore bodies are vein type, containing about

    Jan 1, 1974

  • CIM
    Process Integration and Optimisation of the Boddington HPGR Circuit (5a005d54-696d-4671-abf8-b2ab149915bf)

    By S. Tavani, T. Rees

    The current mining operations at Newmont Boddington Gold Mine (NBG) commenced in 2008, and commissioning of the processing plant started in the latter half of 2009. Metso Process Technology and Innova

    Jan 1, 2012

  • CIM
    The Gold-pyrite Association in Witwatersrand Reefs: Evidence for Electrochemical Precipitation of Gold (389b927c-c068-45d6-8a17-f26d7d6d1938)

    By W. J. Przybylowicz, V. M. Prozesky, D. de Bruin

    "The common style of gold mineralization in the Basal Reef and other auriferous conglomerates of the Witwatersrand Supergroup comprises clusters of gold grains occurring interstitially to quartz and p

    Jan 1, 1994

  • CIM
    Performance of Composite Paste Fill Fences

    By Paul Hughes

    Purpose of Research ? What are the loading mechanics of paste against barricades? ? What is the capacity of the composite paste fill fences? ? Based on the loading mechanics of the paste, do the

    May 1, 2008

  • CIM
    Co-Production of Heavy Minerals from Oil Sand Tailings

    By Mel Owen, Bob Tipman

    "A number of studies have identified the presence of heavy minerals in the Athabasca oil sands. A 1996 Mineral Development Agreement study into the recovery of Co-Products identified low operating cos

    Jan 1, 1998

  • CIM
    Model-based Improvements at the Sarcheshmeh Copper Mine

    By S. Banisi, M. Pourkani, A. R. Laplante, A. Partoazar

    "Canadian experience in industrial modeling of grinding, classification, and flotation kinetics was applied at the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9 % Cu, in an effort

    Jan 1, 1998

  • CIM
    Solubility of MgO in High Cu2O Slags in Equilibrium with Cu Metal

    By T. Crivits

    "Phase equilibria in the ‘Cu2O’-‘Fe2O3’-SiO2 system, the base slag system in copper production, were recently determined. However, the addition of MgO, commonly present in the slag, drastically change

    Jan 1, 2014

  • CIM
    Sag Mill Dynamics and Diagnostics: Case Studies Using Novel Noncontact Acoustic Measurement

    By Randolph A. Pax, Brian Cornish

    The operation of grinding mills in an ore processing circuit is supported by monitoring the input and output variables. These can include the feed ore size distributions, ore feed and water addition r

    Jan 1, 2016

  • CIM
    Application of a dynamic material balance program to an industrial flotation circuit

    By A. R. Trusiak, C. Bazin, D. Hodouin

    "The On-Stream Analyzer has proven, and is still proving to be, an extremely valuable tool for the control of flotation circuits. This paper examines the possibility of going further in the utilizatio

    Jan 1, 1995

  • CIM
    Une mine à Madagascar: Les défis de la biodiversité.

    By Benoit Taillon

    Contenu de la presentation 1. Le projet QMM et son contexte 2. Gérer la biodiversité 3. Résultats obtenus QMM QIT Madagascar Minerals S.A. ? JV: Rio Tinto (80%) et Madagascar (20%) ? Trois gise

    May 1, 2011

  • CIM
    The leakage and absorption of radon in laboratory apparatus

    By R. H. McCorkell

    Measurements of radon in air and aqueous solutions can be affected by leakage from vessels in which samples and standards are kept and by absorption and later release of radon by the materials of thes

    Jan 1, 1980

  • CIM
    Peirce-Smith Converters: Automation, Design, Operation and Environmental Improvements at Kansanshi Copper Smelter

    By David deVries, James Rajith, Paul Mascrenhas, Nurzhan Dyussekenov, Lawrence Hanschar

    Kansanshi Copper Smelter commenced operation in March 2015. The smelter features four Peirce- Smith Converters (PSCs) operated in a three hot, two blowing configuration. This paper describes some of t

    Jan 1, 2019

  • CIM
    Effective Modeling and Estimation of Stratified Deposits

    By Garth D. Kirkham

    The Problem The Don deposit is a series of two sub-vertical zones that pose a number of challenges with respect to modeling and interpolation. The first challenge is that, based on data and observa

    May 1, 2013

  • CIM
    Difficult Gold Gravity Separations an Update

    By J. Ling, J. Xiao, A. R. Laplante

    "The most challenging gold gravity separations occur when gangue has a high s.g., gold is fine, or a combination thereof This paper examines such separations, and evaluates the performance of a 3-in K

    Jan 1, 1998

  • CIM
    Jameson Cell Testing at the Kidd Creek Concentrator

    By R. Tremblay, M. Burrows

    "In the summer of 1990, pilot scale testing of a Jameson cell was carried out at Falcon bridge Limited, Kidd Creek Division. The Jameson cell is self aspirating and has fewer mechanical parts, thus it

    Jan 1, 1993

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing

    By M. Redfearn

    "DUST COLLECTION EQUIPMENT LIST Primary Dust CollectorModular Mikro-Pulsaire - Model 2G1-96TR Capacity: 20,000 c.f.m.Bags: Total of 288; 8' x 4 1/2"" diameterMaterial: Dacron HCE feltAir to cloth rati

    Jan 1, 1976

  • CIM
    Heap Leaching of Gold Ores in Permafrost Conditions

    By V. I. Lakshmanan, I. G. McColl

    "Heap leaching of gold ores in permafrost conditions is feasible provided certain criteria are met. These criteria include relatively short heap leach residence time and the availability of waste heat

    Jan 1, 1987

  • CIM
    Geology of the Voisey’s Bay Ni-Cu-Co Deposit, Labrador, Canada

    By Rosie Moore, Harvey Keats, Kerry Sparkes, A. J. Naldrett

    "Abstract-The Voisey’s Bay Ni-Cu-Co deposit was discovered in late 1994 as the result of prospecting initiated in the summer of 1993. By July 1995, proven mineable reserves were 31.7 x 106 tonnes grad

    Jan 1, 1996

  • CIM
    Coarse Potash Flotation Machine Design Advances

    By J. B. Sabey, V. R. Degner, D. MacGillivray

    "Hydrodynamics principals are applied to the design of a natural air ingestion flotation machine for coarse solids applications. Preliminary laboratory test data and subsequent operating plant flotati

    Jan 1, 1986

  • CIM
    A New Device to Enhance Oxygen Dispersion in Gold Cyanidation

    By Ralph Harris, Javier Jara

    "Oxygen is essential in gold cyanidation. It is supplied to the leaching media by sparging oxygen or compressed air into the cyanidation tank. The rate of oxygen transfer is critical to achieve the de

    Jan 1, 1994