Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Development of BIM and Automation Based Total Process For Infra Construction ? The State of the Art in FinlandBy R. Heikkilä
A large research and development program called RYM PRE (Process Re-Engineering) has been active in Finland since 2010. As a part of the program, a work packet Infra FINBIM is focused on the developme
Aug 1, 2013
-
Noranda’s participation in continuous mining developmentsBy André Piché
"Over the last ten years, several developments have been undertaken to conceive a machine capable of carrying out simultaneously all the mining tasks in hard rock deposits: cutting, mucking, hauling,
Jan 1, 1996
-
The Grantham Iron Works (24d1782e-5dd4-4bb6-a4f9-36b586dc6408)By David J. McDougall
"IntroductionThe production of pig iron, wrought iron bars and castings in Quebec during the 18th and 19th centuries has been so closely identified by historians with the Forges du St. Maurice on the
Jan 1, 1983
-
Control Blasting for Slope Stability at the Adams MineBy Barry J. Morash
The over-all slope angle of between 55 and 60 degrees at the Adams Mine necessitates control blasting on the final pit walls. The control blasting techniques used are pre-shearing and buffer blasting.
Jan 1, 1978
-
Geology of the Trout Lake molybdenum deposit, B.C.By H. Craig Boyle, Craig H. B. Leitch
"The Trout Lake stockwork molybdenum deposit is located in the Selkirk Mountains of British Columbia, 50 km southeast of Revelstoke. The property is being explored by a joint venture between Newmont E
Jan 1, 1983
-
A Semi-Automatic Monitor of Cyanide Solution Strength for Gold Ore DissolutionA semi-automatic device has been constructed that can be used to check the solution strength of cyanide solutions. It consists of a wheel on which a gold-foil-bearing glass slide is mounted. The wheel
Jan 1, 1964
-
Grinding mills-installation and maintenanceBy J. George Gregr
"This paper gives a brief review of grinding mills installation procedures with special emphasis on future maintenance. The importance of cooperation between the customer, construction contractor and
Jan 1, 1985
-
Methods for recovering fine placer goldBy Wang Wenqian, George W. Poling
"Devices and flowsheets for recovering fine placer gold are reviewed. Inefficiencies of gravity processing techniques are documented and discussed. Prospects of combining gravity and froth flotation t
Jan 1, 1983
-
Cretaceous clay and sand deposits in central Nova ScotiaBy RALPH R. STEA, John H. Fowler
Clay, quartz sand and lignite deposits overlie Carboniferous rocks in central mainland Nova Scotia. Recent evidence indicates that these deposits are fairly extensive. Sands consist of almost pure ang
Jan 1, 1984
-
Gypsum in Atlantic CanadaBy J. R. CAMERON
Gypsum is mined in all Atlantic Provinces except Prince Edward Island. It is generally thought to have been derived from the hydration of anhydrite in areas of minimal drainage. Late Devonian downwarp
Jan 1, 1984
-
Investigation of Y-doped BaCeO3 as electrolyte in propane fueled proton conducting solid oxide fuel cellBy Y. Feng
Perovskite structured oxide 15% Y-doped BaCeO3 (BCY15) has been evaluated for use as proton conducting electrolyte in SOFC with propane as the fuel and Pt as both electrodes. Under the fuel cell condi
Jan 1, 2005
-
Anisotropy Measurements in a Core Sample by Using Pulse Transmission MethodBy Jaime Meléndez Martínez
Recent interest in unconventional reservoirs motivates our work in laboratory measurements of seismic anisotropy. Seismic anisotropy is the variation in speed of a wave as a function of its direction
Jun 1, 2012
-
Making better use of carbon: Part II - The co-production of iron and liquid fuelsBy John H. Walsh
"ForewordPart I of this paper, published in the March 1992 issue of the CIM Bulletin, surveyed the probable consequences of a limitation on the emissions of carbon dioxide to the atmosphere for the st
Jan 1, 1992
-
Development of BIM Based Rehabilitation and Maintenance Process for RoadsBy R. Heikkilä
The utilization of Building Information Modeling (BIM) and model based 3-D control of work machines have increased a lot in new road construction in Finland as well as in other Nordic Countries. Up to
Aug 1, 2013
-
An Analytical Model for the Evaluation of Primary Shear Zone Thickness in Orthogonal CuttingBy N. Tounsi
The use of analytical modeling of continuous chip formation in conjunction with orthogonal cutting experiments was presented in the open literature to identify the coefficients of material constitutiv
Jan 1, 2006
-
Open Pit Underground Transition Supported by Integer Linear Programming ModelingBy Solar D. Andrés
Several large open pit mines are facing the challenge to design and plan an underground transition to sustain the long term future of their operations. The desired underground method is Block Cave sin
Oct 1, 2009
-
Fragmentation a Vital Link in the Drill to Mill Process Information SystemBy John Hansen
This paper has been written for presentation at the 103rd Annual General Meeting of the Canadian Institute of Mining, Metallurgy, and Petroleum, April 29 to May 02, 2000. The paper addresses blast pat
May 1, 2001
-
Jigging and tabling circuitsBy R. O. Burt
"IntroductionThe introduction to this section on gravity concentration indicated the wide range of equipment types that exist for the concentration of minerals, in what is the broadest size range of a
Jan 1, 1989
-
Utilisation Des Boues Rouges Pour La Restauration De Rejets Miniers Générateurs De Drainage Minier Acide Cas Du Site DunraineBy Ann Lamontagne
Le parc à résidus de l?ancienne mine Dunraine contient des résidus générateurs de drainage minier acide. Le concept proposé pour la restauration du site est d?utiliser le fort potentiel alcalin des bo
Nov 1, 2002
-
The Dentonia Flotation MillBy W. Holdsworth
The flotation mill of Dentonia Mines, Limited, at Greenwood, B.C., went into operation on April 20th, 1934, and by October 11th a total of 15,000 tons of ore had been treated. It is intended in this p
Jan 1, 1935