Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Chapter III – Continued -Part 5. - Steep Rock-Michipicoten-Goudreau Area - Structure of the Michipicoten-Goudreau AreaBy E. S. Moore
"The Michipicoten-Goudreau area, bordering on the northeast corner of lake Suferior, has had a tectonic history related to that of the geosyncline occupied by this lake. This basin has been a major st
Jan 1, 1954
-
Mining at Noranda (e1b3c124-61ae-49cc-bc5d-6d10b93c8463)By Hal. Oliver
MR.]. G. TRAILL: My only excuse for contributing to the discussion on Mr. Hall's interesting paper is that I had the good fortune to be employed at Noranda during those romantic years, 1927 and 1
Jan 1, 1937
-
Roadbed preparation at INCO LimitedBy A. D. Akerman, D. D. Young, G. R. Baiden
The development and maintenance of underground roadways are increasingly important aspects of the modern mining process. With the trend toward automation and track-less mining, roadbeds capable of wit
Jan 1, 1997
-
Finite Element Prediction of the Cracking Tendency of a Laser Metal Forming Process for the Repair of High Temperature Turbine BladesBy F. Fournier Dit Chabert, F. Tancret, J. François Castagné, R. Le Gall
During the repair of turbine blades by a laser cladding process, it is observed that interdendritic cracking occurs in the heat affected zone (HAZ). Auger electron spectroscopy, performed on sample br
Jan 1, 2006
-
Recent Approach To Recycling Business In Naoshima Smelter & RefineryBy K Komori
Naoshima Smelter and Refinery has treated shredder residue and incinerator fly ash in Japan since 2003. As a highlight, a new incinerating and melting furnace, as well as fly ash washing treatment pla
Jan 1, 2007
-
Construction Labour Relations in the Mining IndustryBy W. J. Gibson
"This paper will provide a general assessment of the differences in construction and industrial labour relations. From this outline will come a detailed examination of labour relations in the construc
Jan 1, 1972
-
Connecting the Personnel Tracking System with the Alarm-Broadcasting SystemBy A. Kowalski
This paper presents methods of implementation and the added value that can be achieved by connecting personnel tracking systems and alarm-broadcasting systems. The authors point out the functions of t
Aug 1, 2013
-
Investigation of Inhomogeneous Deformation During Creep in a Nickel-Base Single Crystal Superalloy, CMSX-10By S. Vaidya, R. C. McKellar, N. K. Sinha
Nominally [001]-oriented nickel-base single crystal (SX) superalloy CMSX-10 was investigated at 900°C under constant load, equivalent to an initial stress of 700 MPa, for creep strains from 7% to frac
Jan 1, 2006
-
Bent Beam Coupon Testing for the Investigation of Stress Corrosion Cracking in Rockbolts"Coupon testing has been used to investigate stress corrosion cracking (SCC) of rockbolts in a laboratory based experimental program. This program has focused on the use of ASTM G39 three- and four-po
Jan 1, 2015
-
Mass Transfer in the Processes of Cascade Separation of Bulk MaterialsBy E. Barsky
"Theoretical notions of mass transfer processes in cascade separation of bulk materials have not been adequately developed as yet (Barsky M.D. 1980). In this paper we have derived linear difference eq
Jan 1, 2016
-
Probing the Oxidation of Carbon Monoxide Utilizing AunBy Michele L. Kimble
A fast-flow reactor mass spectrometer has been utilized to investigate the reactions of gas-phase gold cluster anions with CO and oxygen. Addition of CO to Aun - produces species of the form Au(CO)m -
Oct 1, 2003
-
Computer-Based Simulation of the Construction Process in the Anode Baking FurnacesBy C. Gaubert, G. Bourassa
"The construction or rebuild process in the anode baking furnaces has been modeled with the software Rockwell Arena, in order to minimize the process cost and risk. The case study was focused on the s
Jan 1, 2006
-
An Integrated Quality Management System for Piping Fabrication Using 3D Laser Scanning and PhotogrammetryBy M Safa
Addressing deficiencies and defects that occur during construction projects is costly and time consuming. The manual quality assurance programs currently used in the industry have certain limitations,
Aug 1, 2013
-
2005 Survey of evaluation practices in the mineral industry CIM Management & Economics SocietyBy Lawrence Devon Smith
"The Management and Economics Society has undertaken a survey of industry practice in the evaluation of mineral projects. The survey addresses a number of issues relating to evaluation techniques, dis
Jan 1, 2003
-
Development and Implementation of Pyrometallurgical Processing of Primary Gold Concentrate with High Stannum ContentBy A. Y. Senchenko, S. G. Rybkin, A. V. Aksenov
In gravity processing of gold-containing ore the target produced concentrate which is high gold grade primary concentrate contains a significant amount of cassiterite (SnO2). The plant attempts aiming
Jan 1, 2016
-
Slocan Mining CampBy C. E. Cairnes
The Slocan mining camp in Kootenay district; British Columbia; has long been noted for the great number of its silver-bearing deposits; and for the success that has; in many instances; attended their
Jan 1, 1954
-
The Recrystallization Temperature of BerylliumBy W. A. Alexander
Introduction In the course of a programme of research on beryllium in progress in these laboratories, knowledge of the recrystallization temperature became necessary. As the information is not avai
Jan 1, 1947
-
Stochastic Approach to the Corrosion Assessment of Rock BoltsBy Francois Charette
Corrosion is a significant factor affecting the capacity and working life of ground support. The paper explores a relatively simple method to predict the load capacity of a support system using a Mont
Jun 1, 2012
-
Overview of the Oil Sands Caprock Integrity ProjectBy Kristine Haug
Although most in situ operations in Alberta do not encounter significant problems during resource extraction, there have been a few documented occurrences of oil or steam releases as a result of compr
Jun 1, 2012
-
Operational Strategy At Chagres Smelter, Maximizing Installed CapacityBy R. Bonifaz
The Chagres Smelter, part of the Anglo American plc group situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its opera
Jan 1, 2007