Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Chapter III – Continued -Part 5. - Steep Rock-Michipicoten-Goudreau Area - Structure of the Michipicoten-Goudreau Area

    By E. S. Moore

    "The Michipicoten-Goudreau area, bordering on the northeast corner of lake Suferior, has had a tectonic history related to that of the geosyncline occupied by this lake. This basin has been a major st

    Jan 1, 1954

  • CIM
    Mining at Noranda (e1b3c124-61ae-49cc-bc5d-6d10b93c8463)

    By Hal. Oliver

    MR.]. G. TRAILL: My only excuse for contributing to the discussion on Mr. Hall's interesting paper is that I had the good fortune to be employed at Noranda during those romantic years, 1927 and 1

    Jan 1, 1937

  • CIM
    Roadbed preparation at INCO Limited

    By A. D. Akerman, D. D. Young, G. R. Baiden

    The development and maintenance of underground roadways are increasingly important aspects of the modern mining process. With the trend toward automation and track-less mining, roadbeds capable of wit

    Jan 1, 1997

  • CIM
    Finite Element Prediction of the Cracking Tendency of a Laser Metal Forming Process for the Repair of High Temperature Turbine Blades

    By F. Fournier Dit Chabert, F. Tancret, J. François Castagné, R. Le Gall

    During the repair of turbine blades by a laser cladding process, it is observed that interdendritic cracking occurs in the heat affected zone (HAZ). Auger electron spectroscopy, performed on sample br

    Jan 1, 2006

  • CIM
    Recent Approach To Recycling Business In Naoshima Smelter & Refinery

    By K Komori

    Naoshima Smelter and Refinery has treated shredder residue and incinerator fly ash in Japan since 2003. As a highlight, a new incinerating and melting furnace, as well as fly ash washing treatment pla

    Jan 1, 2007

  • CIM
    Construction Labour Relations in the Mining Industry

    By W. J. Gibson

    "This paper will provide a general assessment of the differences in construction and industrial labour relations. From this outline will come a detailed examination of labour relations in the construc

    Jan 1, 1972

  • CIM
    Connecting the Personnel Tracking System with the Alarm-Broadcasting System

    By A. Kowalski

    This paper presents methods of implementation and the added value that can be achieved by connecting personnel tracking systems and alarm-broadcasting systems. The authors point out the functions of t

    Aug 1, 2013

  • CIM
    Investigation of Inhomogeneous Deformation During Creep in a Nickel-Base Single Crystal Superalloy, CMSX-10

    By S. Vaidya, R. C. McKellar, N. K. Sinha

    Nominally [001]-oriented nickel-base single crystal (SX) superalloy CMSX-10 was investigated at 900°C under constant load, equivalent to an initial stress of 700 MPa, for creep strains from 7% to frac

    Jan 1, 2006

  • CIM
    Bent Beam Coupon Testing for the Investigation of Stress Corrosion Cracking in Rockbolts

    "Coupon testing has been used to investigate stress corrosion cracking (SCC) of rockbolts in a laboratory based experimental program. This program has focused on the use of ASTM G39 three- and four-po

    Jan 1, 2015

  • CIM
    Mass Transfer in the Processes of Cascade Separation of Bulk Materials

    By E. Barsky

    "Theoretical notions of mass transfer processes in cascade separation of bulk materials have not been adequately developed as yet (Barsky M.D. 1980). In this paper we have derived linear difference eq

    Jan 1, 2016

  • CIM
    Probing the Oxidation of Carbon Monoxide Utilizing Aun

    By Michele L. Kimble

    A fast-flow reactor mass spectrometer has been utilized to investigate the reactions of gas-phase gold cluster anions with CO and oxygen. Addition of CO to Aun - produces species of the form Au(CO)m -

    Oct 1, 2003

  • CIM
    Computer-Based Simulation of the Construction Process in the Anode Baking Furnaces

    By C. Gaubert, G. Bourassa

    "The construction or rebuild process in the anode baking furnaces has been modeled with the software Rockwell Arena, in order to minimize the process cost and risk. The case study was focused on the s

    Jan 1, 2006

  • CIM
    An Integrated Quality Management System for Piping Fabrication Using 3D Laser Scanning and Photogrammetry

    By M Safa

    Addressing deficiencies and defects that occur during construction projects is costly and time consuming. The manual quality assurance programs currently used in the industry have certain limitations,

    Aug 1, 2013

  • CIM
    2005 Survey of evaluation practices in the mineral industry CIM Management & Economics Society

    By Lawrence Devon Smith

    "The Management and Economics Society has undertaken a survey of industry practice in the evaluation of mineral projects. The survey addresses a number of issues relating to evaluation techniques, dis

    Jan 1, 2003

  • CIM
    Development and Implementation of Pyrometallurgical Processing of Primary Gold Concentrate with High Stannum Content

    By A. Y. Senchenko, S. G. Rybkin, A. V. Aksenov

    In gravity processing of gold-containing ore the target produced concentrate which is high gold grade primary concentrate contains a significant amount of cassiterite (SnO2). The plant attempts aiming

    Jan 1, 2016

  • CIM
    Slocan Mining Camp

    By C. E. Cairnes

    The Slocan mining camp in Kootenay district; British Columbia; has long been noted for the great number of its silver-bearing deposits; and for the success that has; in many instances; attended their

    Jan 1, 1954

  • CIM
    The Recrystallization Temperature of Beryllium

    By W. A. Alexander

    Introduction In the course of a programme of research on beryllium in progress in these laboratories, knowledge of the recrystallization temperature became necessary. As the information is not avai

    Jan 1, 1947

  • CIM
    Stochastic Approach to the Corrosion Assessment of Rock Bolts

    By Francois Charette

    Corrosion is a significant factor affecting the capacity and working life of ground support. The paper explores a relatively simple method to predict the load capacity of a support system using a Mont

    Jun 1, 2012

  • CIM
    Overview of the Oil Sands Caprock Integrity Project

    By Kristine Haug

    Although most in situ operations in Alberta do not encounter significant problems during resource extraction, there have been a few documented occurrences of oil or steam releases as a result of compr

    Jun 1, 2012

  • CIM
    Operational Strategy At Chagres Smelter, Maximizing Installed Capacity

    By R. Bonifaz

    The Chagres Smelter, part of the Anglo American plc group situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its opera

    Jan 1, 2007