Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Potassium--Argon Dates of Diabase Dyke Systems, District of Mackenzie, N.W.T.

    By R A. Burwash

    In the Yellowknife geologic province, 2,600-million-year-old granites are cut by three sets of diabase or gabbro dyke : (1) large dykes striking 70°E to E-W, (2) rare dykes striking N-S to 30°E and (3

    Jan 1, 1963

  • CIM
    Classifying Variability of Material Properties in Mine Waste Rock

    By N. A. Beier, R. Amos, Smith. L., C. Atherton, D. R. Barsi, D. Blowes, D. C. Sego

    "Waste rock is one of the most abundant materials at mine sites and must be properly characterized and managed to limit acid rock drainage and other harmful byproducts. An experimental waste rock pile

    Jan 1, 2019

  • CIM
    The Operation of a 30kt/A Copper L-Sx-Ew Plantproject in the DR Congo

    By Wei Wang

    The SMCO copper plant is located in DR Congo, and was designed by China NERIN Engineering Co., Ltd. The process is a typical hydrometallurgical plant with Leach-SX-EW, with the project treating the ox

    Jan 1, 2014

  • CIM
    Manpower Problems in the Canadian Mineral Industry: One Possible Solution

    By Bruce A. McFarlane

    "I WOULD LIKE TO SAY how honoured I am that I have been invited to participate in this panel discussion. I have taken the liberty of narrowing my topic somewhat so that instead of speaking on the Soci

    Jan 1, 1972

  • CIM
    Development Methods and Equipment at Lake Shore Mines, Limited

    By G. J. Birnie

    Introduction The preparation of the following paper has been undertaken in the belief that a description of the development methods and equipment used at Lake Shore, at the present time, will prove

    Jan 1, 1950

  • CIM
    Systems Analysis of Grinding Circuits

    By H. D. Goodfellow, R. A. Elliott

    "This paper covers the evolution of large mills and autogenous grinding and compares grinding practice in the iron ore industry with that in the base metal industries. Comments on novel methods of gri

    Jan 1, 1971

  • CIM
    Minor Element Tolerance and Control in Copper Smelting

    By A. E. Wraith, R. Harris, J. Qiu, R. Parra

    Small pilot scale experiments have shown that it is possible to almost fully eliminate the minor elements (ME), namely As, Sb, Bi and Pb contained in smelter dusts by vacuum calcination of mixtures of

    Jan 1, 2007

  • CIM
    The Internal Shaft at Dome Mines, Limited

    By Chas Kemsley

    NO. 6 shaft at Dome Mines, Limited, is an internal shaft going down vertically from the sixteenth, or 2,000-ft., level to the twenty-ninth, or 4,000-ft., level, with loading station and sump below thi

    Jan 1, 1938

  • CIM
    Geology and Mineral Deposits of the Chibougamau-Waswanipi District, Quebec

    By G. W. H. Norman

    INTEREST in the mineral possibilities (gold, copper) of northern Quebec, north of the Quebec-Cochrane branch of the Canadian National railway, has centred for many years in the Chibougamau district (s

    Jan 1, 1936

  • CIM
    Seismic Demands for Deep Tunnels and Shafts

    By F. Pinto, C. A. Prato, R. J. Rocca, P. F. J. Huerta Soaje

    "The seismic hazard for civil engineering structures is generally defined in terms of deterministic or probabilistic acceleration response spectra at an equivalent rock outcropping. The design of tunn

    Jan 1, 2015

  • CIM
    Murrin Murrin CCD1 Rake Mechanism Modification: the Decision and the Result (cec1ce81-ec33-4e69-ab4a-ed843ba61e4f)

    By B. Hewitt

    Murrin Murrin Operations has not had a successful beginning. Numerous reliability and operability issues many of which are the result of design decisions have been addressed through mechanical and ope

    Jan 1, 2004

  • CIM
    The Geology of the Waite-Ackerman-Montgomery Ore Deposit

    By Rodgers Peale

    The Waite mine, as it is locally termed, is situated in the Rouyn district, in the townships of Duprat and Dufresnoy, Quebec, and lies about 340 miles north of Toronto. Due to the impetus given prosp

    Jan 1, 1931

  • CIM
    Particle Damage and Exposure Analysis of Microwave Treated Ores for Bio-Heap Leaching

    By S. M. Bradshaw, E. Charikinya

    "Microwave induced cracks have the potential to enhance metal recovery from coarse sphalerite particles in heap leaching operations by creating new crack surface areas for lixiviant and enhancing valu

    Jan 1, 2016

  • CIM
    Probabilistic Analysis for Mine Design, Using Coal Pillar Design to Illustrate its Potential Usefulness

    By T. R. Kostecki, J. Hirschi

    "Analytical engineering design is based upon a trial-and-error iterative and deterministic process. Within this process, the engineer obtains some estimated values, plugs them into de facto closed-for

    Jan 1, 2015

  • CIM
    The Effects of Thermal History on Mine Climate Simulation Results

    By G. Danko, C. Lu

    "High temperature and humidity at the working negatively affect safety and health in deep and hot underground mines. It is necessary to predict during design the dynamic changes in temperature with he

    Jan 1, 2019

  • CIM
    The first cyanide leaching plants in Canada

    By J. E. Dutrizac, J. B. Sunstrum

    Until relatively recent times, virtually all gold was recovered by gravity and/ or amalgamation methods. Although such techniques are very effective on coarse gold, they become increasingly less usefu

    Jan 1, 1999

  • CIM
    Report of Council: For the Year Ended December 31st, 1948

    By Unkown

    To the Membership of the Institute Gentlemen: The Mineral Industry of Canada in 1948 The preliminary estimate issued by the Dominion Bureau of Statistics and tabulated in the Bulletin of Janu

    Jan 1, 1949

  • CIM
    Geology of the Camflo Mine, Malartic, Quebec

    By Pierre Sauvé, Alex Makila

    "The Camflo stock of porphyritic quartz syenite is an irregular pipe-like body 200 metres in diameter injected along the axial plane of an E-W trending F2 fold, near the contact between the. Kewagama

    Jan 1, 1990

  • CIM
    Quantifying the Influence of Liner Shape and Mill Filling for Performance Optimization

    By Paul Toor

    The operation of SAG mills is variable over time due to their continually changing liner shape, mass and subsequent load motion. However, this tends to be poorly accommodated in liner design and mill

    Jan 1, 2012

  • CIM
    Tantalum, Niobium, and Titanium Coating for Biocompatibility Improvement of Stainless Steel Dental Implant

    By M. H. Fathi

    The aim of this work was to prepare the metallic coatings on 316L stainless steel dental implant and evaluate the corrosion characteristics and thus the biocompatibility of the uncoated and metallic c

    Jan 1, 2007