Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Energy as a production input in the industrial minerals industry past and future requirements

    By Barry James

    "This paper discusses past and current energy use patterns in the mining and manufacturing sectors of the industrial minerals industry. Information is presented on the primary energy input types as pu

    Jan 1, 1981

  • CIM
    Geotechnical assessment of the southeast wall slope failure at Highmont Mine, British Columbia

    By H. Warren Newcomen, Dennis C. Martin

    "This paper describes the investigation of a large, progressive slope failure on the southeast wall of the east pit at Highmont Mine, British Columbia Geotechnical investigation s consisted of geologi

    Jan 1, 1988

  • CIM
    Sinking Methods and Present Situation of Vertical Shafts in China

    By Zhiyang Long, Ruiling Xiao

    "A mine shaft is one main development method of establishing access in an underground mine. The construction technology of the mine shaft sinking is complicated and large equipment setup on surface an

    Jan 1, 2019

  • CIM
    Mineralogical and Wallrock Alteration at the Jinqingding Gold Deposit in Jiaodong Peninsula, China

    By Jiuhua Xu, Shuiku Jia, Weiren Sun

    "Abstract -The Jinqingding gold deposit, situated in the east Jiaodong Peninsula of Shandong province, is typical of the pyrite-quartz vein gold deposits in the Muping-Rushan gold belt of China . The

    Jan 1, 1994

  • CIM
    Critical Life Support Elements and Considerations for Refuge Chambers in Mining Projects

    By J. R. Rau

    While refuge chambers are common place in most underground mining projects, there are different philosophies as to what life support systems are to be considered and how these systems are to be applie

    Aug 1, 2013

  • CIM
    Geotechnical assessment of the southeast wall slope failure at Highmont Mine, British Columbia (2f164fe4-4f99-4687-942f-348e8bf54dac)

    By H. Warren Newcomen, Dennis C. Martin

    "This paper describes the investigation of a large, progressive slope failure on the southeast wall of the east pit at Highmont Mine, British Columbia Geotechnical investigation s consisted of geologi

    Jan 1, 1988

  • CIM
    A Method for the Measurement of Surface of Finely Divided Material

    By John W. Bell

    A FEW years ago the writer had the privilege of examining a piece of apparatus in the Forest Products Laboratory of McGill University which engaged his attention. The Forest Products Laboratory has an

    Jan 1, 1944

  • CIM
    Three Dimensional Simulation of Hydraulic Fracturing on Fault Using Lattice Element Method

    By X. Xu, J. K. -W. Wong, J. -Y. Delenne, K. Soga

    Hydraulic fracturing (HF) is a mulit-scale and multi-physics process which makes numerical modelling challenging. Conventional numerical models focus on multi-physics nature of HF but the multiscale n

    Jan 1, 2015

  • CIM
    Structural Geology of Canadian Ore Deposits: The Cordilleran Region

    By H. C. Gunning

    Introduction The invitation to contribute a discussion on some of the broader features of the mineral deposits of our Cordillera seemed acceptable enough when presented several months ago. More mat

    Jan 1, 1950

  • CIM
    The Gold Mines of Kirkland Lake

    By O. S. Perry, G. H. Charlewood, K. Griffin, S Ogryzlo, H. Hopkins, G. MacIntosh

    "The gold mines of Kirkland Lake are in Teck township, Timiskaming district, Ontario, latitude 48°9'N. and longitude 80°3'W., at an elevation of 1,038 feet above sea-level.There are seven contiguous p

    Jan 1, 1954

  • CIM
    Effect of Thermomechanical Processing on Microstructure and Mechanical Properties in an Al-Cu-Mg-Si Alloy

    By R. Holmestad, M. Gazizov, S. Wenner, R. Kaibyshev, J. K. Sunde

    "Mechanical properties and microstructure of an Al-4.7Cu-0.74Mg-0.51Si-0.48Mn-0.10Cr-0.09Ti-0.02Fe (wt. %) alloy subjected to various thermomechanical processing (TMP) have been investigated and compa

    Jan 1, 2018

  • CIM
    Hydrochloric Acid in Hydrometallurgy

    By Fathi Habashi

    "Hydrochloric acid (HCl), although more expensive than sulfuric, find uses as a leaching agent in reactions involving iron oxide. The reason for this substitution was the discovery that oxyhydrolysis

    Jan 1, 2017

  • CIM
    Experimental and Modelling Research of Slag Properties in Nickel Laterite Smelting

    By Peter Hayes, Evgueni Jak, Taufiq Hidayat, Gary O’Connell, Denis Shishin, Jeff Chen, Francis Letarte

    "Knowledge of slag properties is required for the optimisation of smelting operations. The phase equilibria and viscosities of the Al2O3-CaO-FeO-Fe2O3-MgO-MnO-NiO-Cr2O3-SiO2 slags at conditions of int

    Jan 1, 2017

  • CIM
    The Division of Geology, Quebec Bureau of Mines

    By John A. Dresser

    At a meeting of the Montreal Branch of this Institute in the autumn of 1928, the Honorable J. E. Perrault, Minister of Mines for Quebec, announced his intention to enlarge the Bureau of Mines of Quebe

    Jan 1, 1932

  • CIM
    Pillar Recovery at Lamaque

    By The Mine Staff

    THE PROPERTY of the Lamaque Mining Company, Limited, ?is located in the Town of Bourlamaque, seventy miles east of Noranda, in Bourlamaque township, Abitrbi county, north western Quebec. Gold produc

    Jan 1, 1957

  • CIM
    Multivariate statistical analysis of mineral processing plant data

    By J. F. MacGregor, M. Hou, D. Hodouin

    "RésuméDe nouvelles méthodes efficaces sont maintenant devenues nécessaires pour traiter les quantités massives de données en temps-réel que collectent les ordinateurs industriels modemes. Les méthode

    Jan 1, 1993

  • CIM
    Factors Influencing the Lead Content of Brunswick Blast-Furance Slag

    By A. G. Matyas

    Process improvements which have reduced the lead content of slag from the Brunswick lead blast furnace are described. Microscope examination and electron microprobe analyses, supported by the results

    Jan 1, 1977

  • CIM
    The Sherritt-Cominco Copper Process ? PART II: Pilot-Plant Operation

    By P. Kawulka

    An integrated pilot plant for the development of the S-C Copper Process was constructed at Fort Saskatchewan in 1975 and operated in 1976. The pilot plant was designed to treat 9 tonnes per day of a p

    Jan 1, 1978

  • CIM
    Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite Ore

    By S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian

    "The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota

    Jan 1, 2016

  • CIM
    Design and selection of equipment for deep underground mine pumping systems

    By M. J. Davie, D. S. Ross

    "The successful design of a new mine water pumping system is in part dependent upon the accuracy with which the operating conditions can be forecast. This paper outlines the data which should be obtai

    Jan 1, 1980