Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the World

    By Gunnar Nord

    Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti

    May 1, 2009

  • CIM
    Long-term planning at Raglan (b8ce356e-c666-4ad8-a03a-11ba76659079)

    By L. W. T. Weitzel

    "This paper reviews the Falconbridge- SMRQ’s Raglan project in northern Quebec and the process that was used in developing its current long-term mine plan. Challenges were many and not only limited to

    Jan 1, 2003

  • CIM
    Uppers drilling for mechanized cut-and-fill stoping at Brunswick Mining and Smelting No. 12 Mine

    By R. W. Baker

    "The development of uppers drilling at Brunswick Mining is reviewed. This paper describes design criteria for drilling patterns and the research required for selection of a suitable drill jumbo. The s

    Jan 1, 1988

  • CIM
    Milling Investigations into the Ore as Occurring at the Lake Shore Mine

    By The Staff

    FOR forty years cyanide men have been intensively engaged on the treatment of sulpho-telluride ores. So far as we know, the processes used today were-with the important exception of the concentration

    Jan 1, 1936

  • CIM
    World’s First Power Demand Stabilization System for A 3-Electrode Electric Arc Furnace for Shielded Arc Nickel Smelting

    By B. Lueger, D. Shen, M. Sedighy, R. Rand, R. Saleh, J. Cheung, M. Rifai, I. Khan, W. Sauri, D. Setianto

    The world’s first active power demand stabilization system for a 3-electrode electric arc smelting furnace was commissioned at PT Vale Indonesia in December 2012 on Furnace No. 2 using an SPLC (Smart

    Jan 1, 2014

  • CIM
    Development of the automatic GO-60 drill

    By R. England

    "This paper describes the objectives and design parameters for the operation of a computerized In-The-Hole (I. T.H.) Drill. The principal objective is to add computer control to an Inco 00-60 I. T.H.

    Jan 1, 1987

  • CIM
    Variable Speed Drives for Slurry Pumps and Conveyors using Power Hydraulics

    By G. M. Hughes, J. Ellis

    "IntroductionHydraulics has been considered a science for thousands of years. Applications included water wheels, dam; and slice gates but today the term ""hydraulics"" commonly refers to ""power hydr

    Jan 1, 1972

  • CIM
    A Preliminary Comparison of Coal Classification and Processing between Canada and China

    By Ting Lu, Gerard Laman

    "This document compares the systems of coal classification described under ASTM standards used in Canada to GB standards used in China. A preliminary connection of metallurgical coal classes was set u

    Jan 1, 2012

  • CIM
    Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques

    By S. Makni, A. Faucher, F. Robichaud, A. Bouajila

    "Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge

    Jan 1, 2012

  • CIM
    An In-Plant Test of Sphalerite Flotation without Copper Activation

    By Q. Zhang, J. A. Finch

    "Sphalerite flotation in the absence of copper activation at moderately alkaline pH has been observed in laboratory studies. An in-plant test of this observation was conducted at Kidd Creek Mine LTD.

    Jan 1, 1992

  • CIM
    The NICO and Sue-Dianne Proterozoic, Iron Oxide-hosted, Polymetallic Deposits, Northwest Territories: Application of the Olympic Dam Model in Exploration

    By Kathryn L. Neale, Derek L. Mulligan, Robin E. Goad, Norman A. Duke, A. Hamid Mumin, W. John Camier

    "Abstract - The NICO and Sue-Dianne deposits are being explored and delineated by Fortune Minerals Limited in the Mazenod Lake District of the Northwest Territories, using an Olympic Dam model. The de

    Jan 1, 2000

  • CIM
    A Geometallurgical Approach of the Copper-Nickel-Platinum Group Elements Maturi Deposit, Minnesota, USA, Using Quantitative Mineralogy

    By Charles Knilans, Tassos Grammatikopoulos, Nicole Hoffmann

    "Twin Metals Minnesota LLC, (TMM) has recently completed a prefeasibility study evaluating the development and operation of an underground copper (Cu), nickel (Ni), platinum (Pt), palladium (Pd), and

    Jan 1, 2015

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • CIM
    The Social Acceptability Process of the Canadian Malartic Mine

    By Philippe Angers

    This article analyzes the social acceptability process of a mining project located in an existing city. It will explore how the principles of sustainable development have been integrated in the projec

    Aug 1, 2013

  • CIM
    Commercial and Government Organizations

    "Canada Centre for Mineral and Energy Technology (CANMET)Natural Resources CanadaMining and Mineral Sciences LaboratoriesA. Address and Contact Information555 Booth StreetOttawa, Ontario, Canada, KIA

    Jan 1, 2000

  • CIM
    Can the Growth in Government Spending Really be Curbed?

    By R. D. Brown

    In his April 10, 1978 budget address, Finance Minister Chretien declared that the federal government will restrict the growth of its spending to less than the trend growth of the gross national produc

    Jan 1, 1978

  • CIM
    How to Expedite Geological Investigation and Prospecting in Canada

    ONE of the morning sessions at the recent Annual Meeting was devoted to a Symposium on ways and means to expedite geological investigation, and also to promote greater prospecting activity, in Canada.

    Jan 1, 1941

  • CIM
    Column Flotation in an Oilsand Application

    By Kim Wiwchar, Elizabeth Mbaja, Lynne Dang, Jim Furey, Anita Marks

    "Suncor Energy Inc., located north of Fort McMurray, Alberta, commenced pilot scale operation using a CPT 4’ diameter flotation column in March 2003. This larger scale trial follows two previously suc

    Jan 1, 2004

  • CIM
    The Removal of Iron-Bearing Silicate Minerals from a Hard Rock Lithium Ore

    By T. Gammatikopoulos, C. Gibson, M. Aghamirian

    Lithium is an alkali metal found in brine deposits in the United States, Chile and Argentina, as well as in hard rock deposits in Australia and North America. In hard rock deposits, spodumene (LiAl(Si

    Jan 1, 2017

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019