    Heap Leaching in Ontario - An Example

    By W. J. Witte, M. K. Witte

    "The purpose of this report is to present a generalized preliminary design and cost estimates for a typical heap leach operation such as might be undertaken in Northern Ontario. This report should be

    Jan 1, 1985

  • CIM
    Using Simul8 to model underground hard rock mining operations

    By N. Vayenas, G. Yuriy

    "The combination of a predictive reliability assessment model and discrete-event simulation can be an effective methodology to study the impact of equipment failures on the capacity of production syst

    Jan 1, 2005

  • CIM
    Flammability of Ammonia Leach Solution Vapours Under an Atmosphere of Enriched Oxygen

    By J. Budac, R. Kofluk, D. Belton, M. Sjogren

    A series of tests were performed to determine the flammability limits of mixtures of oxygen, ammonia, steam and nitrogen, over a solution, in a sealed autoclave. The partial pressures of ammonia and o

    Jan 1, 2004

  • CIM
    Roasting and Flotation Practice in the Lake Shore Mines Sulphide Treatment Plant: The Development of the Process, 1936-1946

    By J. E. Williamson

    Introduction 1. Factors on Which the Design of the Roaster Plant was Based The roasting operation at Lake Shore, it was realized from the outset, would be profitable only if costs and losses cou

    Jan 1, 1947

  • CIM
    Grain Refinement in Austenitic and Ferritic Stainless Steels

    By R. G. Zaripova, N. D. Ryan, H. J. McQueen

    The austenitic and ferritic stainless steels do not undergo any phase transformation that induces very fine grains in the product through thermomechanical processing as practiced in most other steels.

    Jan 1, 2004

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003

  • CIM
    Mechanical Integrity versus Process Safety Management Requirements

    By Hugo Julien

    According to OSHA 29 CFR Part 1910.119 (Process safety management of highly hazardous chemicals), Canadian Provincial Safety Standard Acts or Federal laws, the owner of stationary equipment (Boilers,

    Jan 1, 2014

  • CIM
    Mill Project Development at El Limon, Nicaragua

    By Steve Hubbard, Brad Marchant, Rolando Cuadra

    "Triton Mining Corporation acquired the rights to Mina El Limon in Nicaragua in 1993 by international bid. The bid included the gold operations at Limon and an exploration concession of approximately

    Jan 1, 1997

  • CIM
    25 Years of Collector Development for Sulphide Mineral Flotation

    By B. S. Fee, R. R. Klimpel

    "Froth flotation is the most widely used and economic means of concentrating metal sulfide ores such as those containing copper, lead, zinc, nickel, molybdenum, and pyrite. Also recoverable are other

    Jan 1, 1987

  • CIM
    Navigating Change for Success

    By Julie Dénommé

    Today few in business would argue with the idea that we are living in a world that is Volatile, Uncertain, Complex, and Ambiguous. Coined VUCA by the US Army War College, these four words define the ?

    Oct 1, 2010

  • CIM
    Mining Coal Under the Sea in Nova Scotia with Notes on Comparable Undersea Coal-Mining Operations Elsewhere

    By Francis W. Gray

    Introduction Extensive undersea coal-mining has developed on both the east and west coasts of Canada, and at this time some four million tons, or 25 per cent of the total output of Canadian coal, r

    Jan 1, 1927

  • CIM
    Water and Lixiviant Recycle for Gold Recovery Using Non-Cyanide Lixiviants

    Research on alternative lixiviants for gold is ongoing; however few people have looked at complete flowsheets. Alternative lixiviants are typically applied at concentrations 50 to 100 times those requ

    Jan 1, 2014

  • CIM
    Selecting the Number of Increments for Daily Metallurgical Samples: Application to Goldcorp Eleonore Gold Ore Concentrator, Quebec, Canada

    By Claude Bazin, Jalna Lamontagne

    "The operators of mineral processing plants collect daily samples from strategic process streams with a view to prepare production balances to assess plant performances. The rules to minimize the risk

    Jan 1, 2017

  • CIM
    Results and Significance of Drilling Operations in the Athabaska Bituminous Sands

    By G. S. Hume

    Introduction Core drilling of the bituminous sands of northern Alberta has been carried on by the Mines and Geology Branch, Department of Mines and Resources, under the supervision of the Director,

    Jan 1, 1947

  • CIM
    Re-Treatment of Corundum-Bearing Tailings at Craigmont

    By A. G. Roach

    Introduction This paper deals with the operations and plant of the Craigmont Corundum Project, formerly of Wartime Metals Corporation but now under the Mines Section of the Resources Development Br

    Jan 1, 1946

  • CIM
    From Drill Core to Metal: A Multi-Disciplined Approach to Flowsheet Development

    By Norman O. Lotter, Virginia Lawson, Mika Muinonen, Dominic Fragomeni, Jorge F. Oliveira

    Development of metallurgical flowsheets from drill core to production of finished metal involves two main domains: process mineralogy to sample the ore and develop a successful flowsheet producing sal

    Jan 1, 2014

  • CIM
    Gold Milling an Area Concept

    By G. H. Hope

    "Pamour Porcupine Mines of Timmins, Ontario operates two 3,000 ton per day concentrators which receive ore from eight to ten mines in the area. The area milling concept was adopted by Pamour in 1971 a

    Jan 1, 1981

  • CIM
    The Development of Mining Geology in the Sudbury District

    By H. F. Zurbrigg

    Introdduction The main line of ascent in the development of the nickel industry may be traced back through the International Nickel Company of Canada, Limited, to its earliest antecedents, the Cana

    Jan 1, 1948

  • CIM
    Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)

    By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett

    "The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri

    Jan 1, 2007

  • CIM
    Evaluating uncertainty in kimberlite pipe volume by simulating geometry in cylindrical coordinates

    By J. B. Boisvert, P. Oshust

    A significant source of uncertainty in the diamond resource contained in kimberlite pipes is the volume of the pipes. Often the material within a pipe will be mined as ore, leaving the actual geometry

    Jan 1, 2008