Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development and implementation of a digital sleep and circadian management tool for optimising sleep, health and safety in shift workers

    By S M. W Rajaratnam, P Varma, T L. Sletten

    Mining employees undertaking shift work are at considerable risk of experiencing sleep disturbances and circadian rhythm disruptions. In the complex, high-risk environment of mining, these sleep and c

    Apr 16, 2024

  • AUSIMM
    The Development of the Greta Coal Measures of New South Wales

    By Tonks E. E

    The earliest discovery and mining of coal in the northern area of the Greta Coal Measures at Anvil Creek in 1862 was by William Farthing, however, some official records attribute the discovery to Thom

    Jan 1, 1993

  • AUSIMM
    Potential for Future Developments Outside of Existing Fields in the Gippsland Basin

    By MacLean L

    In 1975 the Commonwealth Government established import parity pricing for all liquid hydrocarbons discovered after the 16th September, 1975. These discoveries were termed "new oil" to differentiate

    Jan 1, 1982

  • AUSIMM
    Possible Impact of New Safety Technology Developments on the Future of the United States Mining Industry

    The future of the United States (US) mining industry will be affected greatly by recent coal mining disasters. These have resulted in new legislation which will have an impact on mining economic costs

    Jan 1, 2008

  • AUSIMM
    Underground Ventillation Network Analysis by Using Graph Theory

    By Tominaga Y

    Mine ventilation control is one of the most important techniques to suppress the disastrous region within a limited area, to have enough time of emergencies (ignitions, fires and so on) for undergr

    Jan 1, 1981

  • AUSIMM
    The Use of Ground Geophysics in Locating Fresh Water Bearing Structures in Wadi El Samia, Western Desert of Egypt

    By Abdulhadi H. M, Soliman S. A

    The Western Desert of Egypt is a part of the arid Great Sahara of Africa which extends from the Nile Valley in the east to the Atlantic Ocean in the west. It is covered by a sedimentary sequence of

    Jan 1, 1988

  • AUSIMM
    Abra, A Middle Proterozoic Mineralized Body, Western Australia

    The Abra mineralized body is regarded as a significant new style of mineralization for its environment. It is a blind polymetallic deposit, located in the Bangemall Basin of Western Australia. It was

    Jan 1, 1987

  • AUSIMM
    Lead-Smelting Practice at the Port Pirie Works of the Broken Hill Associated Smelters Pty. Ltd.

    By Hughes J. C

    THE smelting plant consists of five large furnaces operating in the treatment of current flintered material, and one small furnace operating periodically in the treatment of copper dross and antimonia

    Jan 1, 1922

  • AUSIMM
    Geophysical studies of the Nena massive sulphide and Frieda porphyry copper deposits, Papua New Guinea

    Since 1969, a substantial number of geophysical methods have been applied in the search for porphyry copper and mesothermal type -sulpha-de deposits. These have assisted with geological mapping as wel

    Jan 1, 1994

  • AUSIMM
    Development of the Burra Mine Museum

    The Barra Mine was the most significant mine of Australia's earliest mining era, which took place in South Australia between 1841 and 1851, the decade prior to discovery of gold in eastern Austra

    Jan 1, 1993

  • AUSIMM
    Terranes, Tectonics and the Pacific Rim

    The movements of the major continental cratons and the distribution of the principal tectonostratigraphic terranes are reviewed in the Circum-Pacific region during Phanerozoic time. It is concluded th

    Jan 1, 1990

  • AUSIMM
    Study of prevention methods for stress corrosion cracking in underground coalmines

    By A Crosky, S Saydam, H Chen, H L. Ramandi

    Cable bolts and rock bolts are used as primary and secondary anchoring systems in many underground mines. Reports on the premature failure of cable bolts and rock bolts due to stress corrosion crackin

    Nov 29, 2022

  • AUSIMM
    The McArthur River Project

    By Kareise G. J, Leung K

    The McArthur River (HYC) deposit, located in the Northern Territory of Australia, was discovered by Mt Isa Mines Limited geologists in 1955. It is one of the largest sedimentary stratiform zinc-lead

    Jan 1, 1993

  • AUSIMM
    Practical Implicit Geological Modelling

    By H J. Ross, R K. Beatson, T J, W R. Fright

    Traditional method of explicitly defining three-dimensional (3D) ore-waste and geological boundaries relies heavily on a time-consuming process of manual digitisation. This method of modelling can be

    Jan 1, 2003

  • AUSIMM
    The New Lead and Zinc Flotation Sections of the Concentrator of Broken Hill South Limited

    In this paper is given a description of the flotation plant recently erected by Broken Hill South Limited at the South Mine, Broken Hill, N.S.W. It has been built on the site of the old flotation plan

    Jan 1, 1935

  • AUSIMM
    Preliminary Assessment of Sampling Techniques at Hilton Mine

    At Hilton Mine, 18 kilometres north of Mount Isa, the silver-lead-zinc sulphide bodies have undergone strong deformation in the form of folding and later faulting and brecciation in the hangingwal

    Jan 1, 1976

  • AUSIMM
    Performance of Shallow Water Covers on Pyritic Uranium Tailings

    By N K. DavT, A Coggan

    The performance of in situ, shallow water covers in controlling acid generation was evaluated at four recently decommissioned pyritic uranium tailings sites at Elliot Lake, Ontario, Canada. The tailin

    Jan 1, 2003

  • AUSIMM
    Relocating Waihi's Cornish Pumphouse

    WaihiÆs Cornish Pumphouse is located on the edge of town in a dynamic and changeable area where history affects the future. As in any successful project, ingenuity and team work have been significant

    Jan 1, 2006

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • AUSIMM
    Arsenic pathways in copper mining – sustainability issues and potential solutions

    By D Bradshaw, E Forbes, M Edraki, M Tayebi-Khorami, E Manlapig

    There is an increasing trend in the extraction and development of copper resources from complex deposits. These deposits pose mineral processing challenges, as they often contain low grade disseminate

    Jul 25, 2018