Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ore Reserve Estimation - The Systematics to Get it Right

    By S N CARRAS

    Ore reserve estimation is a procedure involving data collection, data storage and judgement and assumptions about geology mining and metallurgy. Calculations are based on these assumptions and an e

    Jan 1, 1992

  • AUSIMM
    Classified Tailings as Part of an Intergrated Regional Support System

    By D R Van Eck

    Western Deep Levels, a seismically active deep level told mine. stalled placing backfill in their narrow tabular workings as part of the regional support strategy in 1986. Over the years the percent

    Jan 1, 1998

  • AUSIMM
    The Application of High Energy Primers to Underground Development

    By D L. Kennedy

    It has always been a challenge to accelerate the underground development progress by increasing the advance rate of each development round. Surveys have shown that most of the development rounds have

    Jan 1, 1999

  • AUSIMM
    The Ballarat East Goldfield - New Insights on an Old Model

    Historical exploration of the Ballarat East goldfield defined two primary quartz vein lode types. Tracking the intersection of these lodes with vertical lines of enrichment (or so-called æindicatorsÆ)

    Jan 1, 2008

  • AUSIMM
    Blasting a Cavern Using Bulk Emulsion Explosives

    The Elgas Underground Storage Facility at Port Botany, Sydney, is the first purpose-built cavern of its kind in Australia and allows large capacity, safe and environmentally benign storage of Liquefie

    Jan 1, 1999

  • AUSIMM
    Pyrite Oxidation Rates Determined Based on Quantitative Mineralogy of Long-Term Column Leaching Tests

    By N DavT

    Pyritic tailings from the Quirke mine waste management area in Elliot Lake, Ontario were subjected to long-term column leaching experiments in two PVC columns measuring 122 cm in height and 15.2 cm in

    Jan 1, 2003

  • AUSIMM
    TQM Principles at Work at Nickol Bay Quarry - A Case Study

    By Marton A

    The Readymix Group have a Quarry Improvement Program - 'Building in Quality (BIQ) which has many parallels to the ICI Explosives' total quality management - 'Quality Improvement Progr

    Jan 1, 1994

  • AUSIMM
    Mass Blasting at Elura Mine

    By G Kennewell

    At 11 am Monday 8 September 1997, the successful detonation of the 5/9 Mass Blast at Pasminco - Elura was signified by the subsiding of æMt KevinÆ (a 15 m high earth fill mound). The blast was in resp

    Jan 1, 1999

  • AUSIMM
    A New Look at Multiple-Point Geostatistics for Geological Modelling

    By B F. J Kelly

    Multiple-point simulation is a family of methods used to generate conditional facies simulations that present the same spatial dependence as a user-defined training image. The main advantage of using

    Sep 26, 2011

  • AUSIMM
    Study of the Geodynamic Regime of the Region Under Large-Scale Mining in the Apatite-Nepheline Deposits in the Kola Peninsula, Russia

    By V A. Maltsev, V I. Panin

    The question of prediction and prevention of dynamic events û rock bursts (RB), tectonic rock burst (TRB) and mining-induced earthquakes (MIE), induced by large-scale mining, are discussed. The mine i

    Jan 1, 2000

  • AUSIMM
    Alluvial Platinum-Group Minerals in Southern New Zealand (PACRIM'95)

    By M.J. Mitchell

    Platinum-group minerals (PGM) are recorded from a number of localities along the Waiau River, western Southland, and the south coast of the South Island, New Zealand. At each locality, small amounts

    Jan 1, 1995

  • AUSIMM
    On Line Determination of the Density of Granular Material by Dry Method

    By J Bohm, B Csoke, I Tarjan

    In process technology, especially in coal preparation, it is often necessary to have a continuous knowledge of the average density of granular material in order to achieve both quality control and p

    Jan 1, 1993

  • AUSIMM
    Experimental investigation on borehole beakout and its implication on stress magnitudes

    By H Masoumi, I Canbulat, Y Zhao, J Oh, H Lin

    Borehole breakout is a drilling induced phenomenon caused by overstress of rock around the borehole. Its depth usually aligns with the minimum horizontal principal stress direction. For this reason, i

    Nov 30, 2018

  • AUSIMM
    The Mineral Industry-Csiro's Role in Research and Education

    The Australian Mineral Industry has to compete on world markets, so its mineral research has to be aware of overseas developments, it must be of world class, and it must utilise as many ideas as pos

    Jan 1, 1986

  • AUSIMM
    Comparative Resource Studies in an Open-Pit-Blased Estimates

    By T QUINLAN

    A resource estimate uses data obtained by sampling an orebody. An example is described in which a random drilling pattern did not provide a representative set of assays, and the estimated resource

    Jan 1, 1992

  • AUSIMM
    Mineral Exploration in Fiordland 1970 - 1972 with Emphasis on Syngenetic Mineralisation Located to Date

    Since the earliest recorded prospecting of the 1860's mineral exploration and mining in Fiordland has been discouraged by the formidable physical difficulties presented by its isolation, extremel

    Jan 1, 1977

  • AUSIMM
    Mechanics of Rock/Tool Interaction in Disc Rock Cutting

    By M Hood, X S. L, W J. T Daniel, H Gurgenci

    It is believed that disc cutter shape affects rock fracture and therefore cutter performance and cutter life. However, the current generation of disc cutters is made of hardened steel and these cutter

    Jan 1, 1998

  • AUSIMM
    Practical Management of Progressive Large Failures at Minerals and Metals Group Century Mine

    Minerals and Metals Group (MMG) Century mine (Century) is a large open-cut mine in northwest Queensland approximately 2.5 km long, 1.5 km wide and 240 m deep, with an ultimate pit depth of 320 m. In 2

    May 1, 2010

  • AUSIMM
    Exploring two approaches for real-time measurement of frother concentration

    By H Park, D J. Holland, L Wang, Y Matviychuk, Y Lee

    Reuse of process water in mineral and coal flotation plants is widespread to effectively reduce freshwater consumption. However, the accumulation of the frother in the recycled process water is a grow

    Aug 24, 2022

  • AUSIMM
    Improved Jarosite Process

    By BTrubT M

    In the roast-leach-electrolysis process for the production of zinc, iron contained in zinc concentrates is converted to zinc ferrite during roasting. At Canadian Electrolytic Zinc (CEZinc), the Outo

    Jan 1, 1993