Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Selecting and Implementing the Right Technology

    The selection and implementation of the right technology for a project is critical to the future development of the resource industry. It is essential for companies to ensure ongoing competitive viabi

    Jan 1, 2006

  • AUSIMM
    Female Undergraduates in the Mining and Minerals Industry

    By J Meikle

    A projected image is not always a true representation of a situation, or indeed an industry. This is often the case of the mining and minerals industry, which has frequently been portrayed in a negati

    Jan 1, 2006

  • AUSIMM
    Radar guided blasthole drilling improves product recovery

    By I Mason, M van de Werken, B Zhou, J Hargreaves, W Stasinowsky

    A critical step in open cut coal mining is clean removal of the overburden. This is usually achieved by drilling, blasting and digging. A key part of this process being successful is to stop drilling

    Sep 1, 2024

  • AUSIMM
    Production of molybdenum disilicide using a silicon-containing molten bath via the hot dipping method

    By H Fukaya T Miki, J Gamutan

    Molybdenum disilicide (MoSi2) is a promising material for thermal applications due to its excellent heat and oxidation resistance. It can operate at temperatures of up to 1800°C as furnace heating ele

    Jun 19, 2024

  • AUSIMM
    The University of Melbourne's Approach to Solving the Problems of Education and Research in the Extractive Metallurgy Area

    Australia as a leading producer of mineral sands has also occupied a leading position in many areas of research'in the processing and applications of these minerals. Research in upgrading ilm

    Jan 1, 1986

  • AUSIMM
    Polymer-amended tailings dewatering technology for desired closure outcomes

    By T Baumgartl, A Costine, B Boshrouyeh, M Edraki

    In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c

    Aug 2, 2023

  • AUSIMM
    Bentonite and Fuller's Earth Deposits of New South Wales: II. Bonding Properties

    By Giles C. N, Loughnan F. C

    Bentonites and active earths from N.S.W., previously analysed with respect to occurrence, mineralogy and physical properties have been evaluated for use as bonding agents in quartzose moulding sands i

    Jan 1, 1959

  • AUSIMM
    First Mexican Coal Mine Recovery After Mine Fire, Esmeralda Mine

    The fire started in the development section from methane released into the mine through a roof-bolt hole. The date was 8 May 1998. The flames spread quickly as the coal was ignited. After eight hours

    Jan 1, 2005

  • AUSIMM
    Equipment Set-Up of Kumera Steam Dryer Plants in Non-Ferrous Metal Smelters

    By I KylmSkorpi, H Mansikkaviita

    The traditional direct-heated drying process has been replaced by the steam drying process in non-ferrous metal smelters, where steam is available from waste heat boilers. Many recent projects have se

    Jan 1, 2008

  • AUSIMM
    Theory of Sampling and geostatistics – the ultimate link

    By D François-Bongarçon

    The link between geostatistics and Theory of Sampling (TOS) is examined again in view of new findings made while trying to compare predicted sampling variances and estimated grades (using geostatistic

    May 9, 2017

  • AUSIMM
    Chromium and Rare Earth Elements Mobility by Sodium-bearing High-temperature Hydrothermal Solution – An Example from Mantle Diopsidite and Crustal Diopsidite

    By N Akizawa, A Tamura, S Arai

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Reaction products between high-temperature hydrothermal solution/uppermost mantle peridotit

    Mar 18, 2015

  • AUSIMM
    Listening to Local Voices – a systematic approach for understanding what a social licence to operate means for Rio Tinto in the Pilbara

    By L Dawson, S Carr-Cornish, N Boughen, K Moffat, S Masterson

    The risk and consequences of community rejection and loss of a social licence to operate is well articulated (Moffat et al 2018), however, the means for systematically managing this risk are less esta

    Jul 25, 2018

  • AUSIMM
    What Information and Production Benefit Can I Gain by Using Digital High-Speed Camera and Data Capture Technology?

    This paper will address this question from the point of view of a drill and blast engineer or researcher working in open cut and underground mining operations. The paper will establish a common set of

    Jan 1, 2007

  • AUSIMM
    Beyond below-ground geological complexity: Developing adaptive expertise in exploration decision-making

    By M J. Davies, R S. Davies

    Despite increased expenditure, the global discovery rate of world-class ore deposits has been in decline for over a decade (Schodde, 2017). Mineral exploration has traditionally followed an empirical

    Nov 21, 2018

  • AUSIMM
    Fire Behaviour in Buffel Grass Dominated Mine Site Rehabilitation in Central Queensland, Australia

    By A Sturgess, P McKenna, P D. Erskine, D Doley, V C. Glenn

    For more than four decades, rehabilitated lands in the Bowen Basin have been planted with buffel grass (Cenchrus Ciliaris), which is often used to provide rapid, stabilising and erosion reducing cover

    Jun 28, 2016

  • AUSIMM
    A Black Canvas – Planning a Greenfield Coalmine in New South Wales

    By T W. C Stambolie

    Coalmines, like any other mine, generally involve the classic three-staged approach to mining studies; namely concept, pre-feasibility study (PFS) and feasibility studies (Cusworth, 2012). Subsequent

    Jun 28, 2016

  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Ventilation monitoring using fibre optics

    By G B. French

    Post a serious heating event underground, and at the direction of the State Mining Safety Authority, a mining company needed to demonstrate the use of cutting-edge technology to mitigate future events

    Oct 12, 2022

  • AUSIMM
    Mixed alkali effect on structure of Al2O3-based slags

    By S H. Hyun, J W. Cho

    Jun 19, 2024

  • AUSIMM
    Fundamental study for biomass char utilisation at sintering process in view of combustion property

    By T Takayama, R Muroi, M Matsumura

    The steel industry occupies 14 per cent of CO2 emissions in Japan, and the sintering process is one of the major emitters. Since most of CO2 released from the sintering process comes from coke fine co

    Nov 8, 2021