Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Channel and Detrital Iron Deposits of the Flinders Mines Pilbara Iron Ore

    By A E. Petts

    Record iron ore prices and a renaissance of infrastructure in the Pilbara have Flinders Mines poised to move from explorer/developer to an iron ore producer. The potential of the company’s Pilbara Iro

    Jul 11, 2011

  • AUSIMM
    Perspectives on Future Global Collaboration for Mining Research and Education

    By M Scoble

    This paper addresses the importance of collaborative approaches to resolving future mining challenges. It attempts to provide some insight into understanding the theory, measurement, mapping and manag

    Nov 22, 2011

  • AUSIMM
    Airborne Gravity Gradiometry and Magnetics in the Search for Economic Iron Ore Deposits

    By R Miller

    The enrichment of magnetite to haematite and haematite-goethite leads to a coincident magnetic low and gravity high within the banded iron formation. Palaeochannel deposits of pisolitic limonite can b

    Jul 11, 2011

  • AUSIMM
    Optimising Western Australia Magnetite Circuit Design

    By D David

    The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po

    Aug 8, 2011

  • AUSIMM
    Controlled Explosives Demolition of Concrete Bridge – Canberra 2010: Blast Design, Procedures, Risk Assessment and Execution

    By N Elith

    The explosives demolition of a post-stressed, steel reinforced, concrete road bridge in Australia’s capital city, Canberra. The bridge was 50 m from the new replacement bridge, 320 m from community st

    Nov 8, 2011

  • AUSIMM
    What’s Stopping You? The Role of Sheeting Material Selection in Safe Haulage Operations

    By R Thompson, D Tulloch

    "Wet-weather or 24×7 wet-trafficability is a commendable design objective for unpaved mine haul roads, but practically often difficult to achieve, due both to the road sheeting material selected, and

    Nov 15, 2016

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Design of Equipment for Dynamic Burden Measurements

    By D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer

    The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa

    Aug 24, 2015

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Mineralisation Styles and Geochemistry in the Paddy's Flat Gold District, Meekatharra, Western Australia

    By Kavanagh M. E, Henley R. W

    The Meekatharra mining district lies in the northern pan of the Murchison Province of the Archaean Ynlgam block of Western Australia. Since dis- covery of the Paddy's Flat belt in the district i

    Jan 1, 1991

  • AUSIMM
    Linking Mineral Resource and Ore Reserve classification with technoeconomic study levels and forecast relative accuracy

    By D Reid, J McKibben, M Noppe

    International mineral disclosure standards and guidelines aligned with the CRIRSCO (Committee for Mineral Reserves International Reporting Standards) template were developed to inform stakeholders abo

    Mar 22, 2022

  • AUSIMM
    Drill hole spacing analysis for classification and cost optimisation – a critical review of techniques

    By J Levett, O Rondon, I Glacken

    Reporting Codes are not prescriptive on methodologies to report or classify Mineral Resource Estimation results, but the assessment of risk and uncertainty is required, and is likely to be increasingl

    May 24, 2023

  • AUSIMM
    Investigation of Mixing and Rolling Drum Performance at Port Kembla’s Sinter Machine Through Full-Scale Sampling and Laboratory Scale Experiments

    By D Maldonado

    BlueScope Steel’s Port Kembla sinter machine underwent a major upgrade during mid-2009. The mixing and rolling drum (MRD) was thoroughly cleaned during the upgrade. Space factor measurements taken in

    Jul 11, 2011

  • AUSIMM
    Understanding Size Effects of Semi-autogenous Grinding (SAG) Mill Operation as a Pathway to Solving Feed Disturbances – Case Study Using the MMG Century SAG Mill

    By R A. Pax, B Cornish

    "Although it is well known and easily experienced that the feed size distribution influences the throughput and stability of operation of a semi-autogenous grinding (SAG) mill, the details are poorly

    Oct 10, 2016

  • AUSIMM
    Fluorine Removal From Ok Tedi Copper/Gold Concentrates

    By J W. Glatthaar, M Mavotoi

    The occurrence of fluorine in the copper/gold concentrates produced by Ok Tedi Mining Limited has provided a series of challenges to metallurgists since 1988. Although fluorine is distributed througho

    Jan 1, 2003

  • AUSIMM
    Drift and Fill - The High Value, High Recovery Mining System

    By M English, M Yumlu

    At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of

    Jan 1, 2008

  • AUSIMM
    The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and Limitations

    By W Mahoney, F Clement, E Saraiva

    Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t

    Sep 17, 2014

  • AUSIMM
    The Impact of Fluidised-bed Flotation for Treating Coarse Sulfides

    By H Thanasekaran, M J. Mankosa, J N. Kohmuench, G H. Luttrell

    "Fluidised-bed flotation has been demonstrated over the last 16 years as an effective method for improving the flotation recovery of coarse particles. This technology has been successfully deployed in

    Oct 10, 2016

  • AUSIMM
    Learning from and managing a significant saprolite instability

    By M Bouare, C Holland, K N’Diaye

    Two adjacent open pits in Mali hosted by deeply weathered saprolitic materials were mined consecutively over the course of approximately 12 months. During excavation, both pits experienced significant

    Jun 22, 2022

  • AUSIMM
    Implementing condition-based wear surface management

    By P Velletri, N Gaylard

    The management of wear surfaces in mining operations has remained largely unchanged since the inception of mining. Sacrificial wear liners are installed on the inside of chutes, hoppers and other equi

    Nov 8, 2021