    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • AUSIMM
    Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisation

    By S Warden, T Neville, P Leckie

    At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,

    Sep 1, 2024

  • AUSIMM
    In situ dynamic testing of mesh straps and W-straps

    By P Mikula, B Darlington, J Graham, P Young

    In underground mines experiencing dynamic events, there is an ever-present challenge to design and maintain a capable ground support system. One key component of ground support systems is surface supp

    Nov 29, 2022

  • AUSIMM
    Making use of potentially contaminating mine waste in cover design

    By N Jamson, T K. Rohde

    The Mine is an underground zinc (Zn), lead (Pb) and silver (Ag) operation in central New South Wales (NSW). Broadly speaking the Mine has two domains that require rehabilitation, the mine industrial a

    Jul 23, 2018

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    Optimum embankment design for a tailings dam

    By A Fyans, B Ghahreman-Nejad

    This paper discusses the method and results of an options study into selection of the optimal form for a 130 m high tailings/water retaining dam, located in a region of high seismicity in central Iran

    Jul 23, 2018

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011

  • AUSIMM
    How Robust Are Your Asset Integrity Management Processes?

    By R Cannings, J Wallace, M McCamley

    The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per

    Jun 22, 2016

  • AUSIMM
    Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining System

    By J Tibbett, A Colebourn, B Hebblewhite, F Suorineni

    The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi

    Nov 4, 2015

  • AUSIMM
    Machine learning for predicting chemical system behaviour of CaO-MgO-SiO2-Al2O3 steelmaking slags case study

    By B Laidens, D Souza, W Bielefeldt

    The CaO-MgO-SiO2-Al2O3 system, characterised by its intricate phases and thermodynamic properties, plays a pivotal role in steel secondary refining processes, encompassing desulfurisation, non-metalli

    Jun 19, 2024

  • AUSIMM
    Application of Ground Penetrating Radar to Testing Tunnel Integrity

    By J Karlovšek

    Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m

    Mar 8, 2011

  • AUSIMM
    Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold Mine

    By P Christen, D R. Ashley, G R. Power

    The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton

    Jan 1, 2009

  • AUSIMM
    The influence of the strain rate and pre-static stress on the dynamic mechanical properties of medium sandstone

    By S Yang, J Wang, J G. Ning

    A series of conventional dynamic uniaxial compression (CDUC) tests and coupled static-dynamic loading (CSDL) tests were conducted using a split Hopkinson pressure bar (SHPB) system to explore the dyna

    Nov 29, 2022

  • AUSIMM
    Creep properties and energy evolution characteristics of weakly cemented rock under step loading

    By C X. Zhang, W K. Ru, S C. Hu

    To study the creep properties and the energy evolution characteristics of the weakly cemented rock (WCR) in western China, the creep deformation damage law of weakly cemented mudstone (WCM) under grad

    Nov 29, 2022

  • AUSIMM
    A new test method for directional propagation of type-I rock cracks

    By W Y. Guo, L X. Chen, D X. Zhang

    To obtain the rock type-I crack propagation process accurately, a novel fixture is used to make the prefabricated crack of rock propagation along the predetermined direction. In this study, the crack

    Nov 29, 2022

  • AUSIMM
    Multi-physical field coupling model development and parameter analysis of natural gas hydrate considering mechanical damage

    By Z R. Guo, Y Qiu, X F. Wang