Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    From Concept to Reality ù Process Water Treatment at the ERA Ranger Mine

    By D Jones

    The development, piloting and engineering design of an innovative water treatment system for process water produced by a uranium mine mill are described. The process incorporates lime/carbonate soften

    Jan 1, 2003

  • AUSIMM
    Mount Isa Mines Limited Heavy Medium Preconcentration Plant- Six Years after Commisioning

    By Pease JD

    This paper reviews the changes in operating practices made in the heavy medium plant to meet the objectives of increased silver, lead and zinc production at lower operating cost. The effects of medi

    Jan 1, 1988

  • AUSIMM
    Remediation of Wall Failure at Kalgoorlie Consolidated Gold Mines’ Golden Pike Cut-back 2016

    By J Darbritz

    "This paper details the events leading up to a slope failure that occurred at Kalgoorlie Consolidated Gold Mines (KCGM) and the remediation method executed using rope access specialists.n January 2016

    Nov 15, 2016

  • AUSIMM
    The effects of operational parameters on HydroFloat® performance in a metalliferous application

    By A J. Morrison, K Demir, J Kohmuench, K Runge, C Evans

    The Eriez HydroFloat® is a flotation device capable of recovering significantly coarser and lessliberated particles than is possible using a conventional mechanical flotation cell. Originally develope

    Aug 24, 2022

  • AUSIMM
    Phase diagram of V2O3-FetO-SiO2-CaO(15 mass%) system at 1623 K

    By Q Shu, T Deng, B Yan, B Song, D Wang

    In view of the lack of phase equilibria data of vanadium-bearing oxide system and the desirability of them for design or optimisation of vanadium extraction process, the phase equilibria relationships

    Aug 21, 2024

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • AUSIMM
    High-Grade Optimisation and Improved Grade Control Practices in Mount Tom Price

    By B Morey, J Gordon, P Mackenzie

    Mount Tom Price Mine is peerless amongst Rio Tinto iron ore resources around the world. It has provided Hamersley Iron with premium quality, high lump yield haematite ore over the last four decades. T

    Jan 1, 2002

  • AUSIMM
    Analysis and Management of Loads on Paste Backfill Barricades

    By M Fahey, A B. Fourie

    Over the past ten years, the mining industry has witnessed the introduction of a new and innovative mine filling technique known as paste fill, which consists of placing full stream tailings with smal

    Jan 1, 2008

  • AUSIMM
    Ranger - The 5 Star Mine

    By Resta S. A

    Energy Resources of Australia Ltd - Ranger Mine is located about 255 kilometres east of Darwin in the Alligator Rivers Region of the Northern Territory. The Ranger project is surrounded by Kakadu Na

    Jan 1, 1994

  • AUSIMM
    Hydromechanical Processes During In Situ Coal Gasification

    By J Liu

    In situ coal gasification is a method of extracting a high proportion of the energy value from coal without the need for mining. In situ conversion of coal to combustible gases is achieved by drilling

    Jan 1, 2004

  • AUSIMM
    Simulation of Mine Fires

    By Trutwin W, Tracz J

    The outbreak of open fires underground cause disturbances to the conditions of the mine ventilation process. Thermal and chemical effects due to fire create unsteady, transient states in airflow a

    Jan 1, 1988

  • AUSIMM
    Flotation Treatment of Supergene Complex Sulphide Ores at Thalanga

    By Breen AM, Phelan JM, Doherty RJ

    Early in 1990, Pancontinental Resources (Base Metals) Pty Ltd commenced flotation treatment of ore from the complex copper-lead-zinc sulphide orebody at Thalanga, 65 km west of Charters Towers in No

    Jan 1, 1991

  • AUSIMM
    Whittle Programmings's Present and Future Tools for the Strategic Planning of Mines

    The author reviews design evaluation theory and existing optinustion tools and then describes how these have guided recent developments in Whittle Programming's strategic mine design package: F

    Jan 1, 1998

  • AUSIMM
    No 3. Services and Surface Area

    In the general planning of this area, provision was made for the distribution over the whole area as required of the following services:(a) Power and lighting from the substation distribution boards &

    Jan 1, 1957

  • AUSIMM
    Monitoring of M10000 IsaMill™ Process Performance by Passive Acoustic Emissions

    By A McEwan, J Masters, C A. Jackson, A Catanzano, V Sharp, M Millen, S Rainey, S J. Spencer, G Roberts

    A passive acoustic emission (AE) monitoring system has been developed and trialled on two M10000 IsaMillsTM. The analyser detects AE stress waves generated by grinding media impacts with the mill line

    Sep 1, 2014

  • AUSIMM
    Effects of Ventilation Leakage in Deep, Hot Room and Pillar Operations

    By S Bluhm, R Funnell

    Creative mine-designs are constantly being applied in the deep platinum mining industry in South Africa. Recently, this has resulted in deep hot mine-designs including room and pillar, bord and pillar

    Jan 1, 2005

  • AUSIMM
    Post-Mortem Findings on the Performance of Engineered SRB Field-Bioreactors for Acid Mine Drainage Control

    By M A. Harrington-Baker, J M. Trudnowski

    Sulfate-reducing bacteria (SRB) have the ability to immobilise dissolved metals by precipitating them as sulfides, provided that a favourable biochemical environment is created. Such an environment in

    Jan 1, 2003

  • AUSIMM
    Weak Acid Dissociable Cyanide Analysis Required for International Cyanide Management Code (ICMI) Compliance û Recent Refinements to an Online Weak Acid Dissociable Cyanide Measurement Device

    By H S. Smit, P Lotz

    Gold mining companies who are signatories of the International Cyanide Management Code (visit www.cyanidecode.org for further information) are required to measure WAD cyanide on-line and destroy WAD c

    Jan 1, 2008

  • AUSIMM
    The Sams Creek Peralkaline Granite Hosted Gold Deposit, Northwest Nelson, New Zealand ù A New Variant on Alkaline Intrusion-Related Gold Deposits

    By K Faure

    At Sams Creek a peralkaline granite porphyry dyke hosts gold-bearing sulfide-quartz-siderite veins. The granite dyke intrudes Ordovician-Silurian metapelite and quartzite, and has thin lamprophyre dyk

    Jan 1, 2004

  • AUSIMM
    Setting Best Practice: FIFO at the Mount Keith Concentrator

    By S O. Hille

    Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc

    Jan 1, 2002