Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Geostatistical Parametrisation for Grade Control of Stratiform Banded Iron Formation in 'Singhbhum - Keonjhar - Bonai' Belt of IndiaBy Sarkar B. C, Sen A. K
India is well endowed with vast reserves of banded hematite ore, about 12 billion tonnes, estimated by some conventional methods. Various authors have assessed this huge reserve using some advanced
Jan 1, 1995
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Reconciliation of the McKinnons Gold Deposit, Cobar, New South WalesBy Snowden D. V, Standing C. A, Ryba A, Bywater A
McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant
Jan 1, 1997
-
Geologists and the Value Chain – How Material Characterisation by Modern Mineralogy can Optimise Design and Operation of Processing FacilitiesBy K Ehrig, C Lower, V Liebezeit, M Smith, E Macmillan
"Minerals, minerals, minerals. Elements occur in the earth as minerals. If local physical, chemical and structural conditions are conducive to concentrating these minerals to sufficiently high abundan
Aug 18, 2014
-
Sustainable Steel Plant on an Environmental Protection AreaBy C A. Chaves
During most of its history, the metallurgical industry has been seen as a source of pollution for the environment. However, during the second half of the 20th century, as the world environmental legis
Jan 1, 2009
-
Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle MineBy G B. Smith
Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot
Mar 21, 2011
-
The Geomet Curve – A Model for Implementation of GeometallurgyBy J Vann
Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo
Sep 5, 2011
-
Reversing the Trend in Open Pit Mining Equipment OutputBy T Trott, M Lewis, G Lumley
The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere
Sep 18, 2012
-
Productivity improvement through collaborative shift planning and trackingBy E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, IndonesiaBy G W. Swana
Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis
Nov 29, 2022
-
Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of ViewSishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to
Jan 1, 2005
-
Hydrogen plasma in extractive metallurgy applicationBy M I. Pownceby, M A. Rhamdhani, S Palanisamy, D Fellicia, B Satritama, G A. Brooks, A Ang
Metal production have long been using carbon sources as both reducing agents and energy sources. Consequently, the global extractive metal sector contributes significantly to greenhouse gas emissions,
Aug 21, 2024
-
A Cut-Off of Liberated and Selected Ore Minerals Optimisation Based on the Geometallurgy ConceptBy G Turner-Saad
An improvement to cut-off grade optimisation theory based on geometallurgy has been completed. The improvement fundamentally consisted of taking into account mineralogical and textural characteristics
Sep 5, 2011
-
Low-Temperature Roasting of Ilmenite ù Phase Chemistry and ApplicationsBy C Li
Removal of gangue minerals from ilmenite concentrates can be accomplished by relatively low temperature roasting in controlled gas atmospheres to selectively enhance the magnetic separation characteri
Jan 1, 2001
-
Characterisation of Bedded and Channel Iron Ore Deposits Using CSIRO’s HyLogging™ SystemsBy M Haest
This study demonstrates the application of HyLogging™ technologies for mineralogical characterisation of different iron ore types throughout the Hamersley Province (Western Australia), including a cha
Jul 11, 2011
-
Probabilistic Slope Design and its Use in Iron Ore Pit OptimisationsThe current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v
Jan 1, 2009
-
The Use of Comminution Testwork Results in SAG Mill DesignThe relationship between comminution testwork results and the milling circuit that is subsequently selected is not a direct one and frequently involves recourse to databases of past test results. This
Jan 1, 2002
-
Routes to Stainless Steel With Improved Energy EfficienciesBy S Jahanshahi
In an earlier LCA study, the authors showed that the electricity consumption of the electric furnaces used in the production of the ferronickel and ferrochrome feedstocks made significant contribution
Jan 1, 2004
-
Post-mining Land Use Options in the Appalachian Coal Mining Region of the USABy J Skousen, C E. Zipper
"Prior to the 1950s in the USA, surface coalmines were generally left without any reclamation. As government regulations advanced, mine operators were required to backfill the area and plant grasses o
Jul 16, 2014
-
Assessing Sustainability of Gold Mining Operations Using Fuzzy Logic MethodologyBy L Lorenzen
In this paper, we developed and implemented a fuzzy logic expert system capable of evaluating the degree of sustainability within the context of gold mining operations. The newly introduced approach o
Jan 1, 2007