Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
KEYNOTE: Using Metallurgical Data to Drive Continuous ImprovementBy R Dunne
"Continuous improvement on metallurgical treatment plants is possible only when good data and analysis of the data are available. Good data implies appropriate and accurate mass measurement coupled wi
Oct 10, 2016
-
Proactive Measures for Fatality Prevention in the Mining Industry ù Why Fatalities Persist While Lost Time Injuries DeclineThe traditional measure of Lost Time Injury Frequency Rate (LTIFR) as a measure of improvement in safety performance is recognised as inadequate and misleading, lulling managers into believing that sa
Jan 1, 2003
-
Working in Partnership with IndustryThe Ministry of Economic Development has as its slogan æTogether making the differenceÆ. The Ministry is required to work in partnership with the private sector, local authorities, Maori economic enti
Jan 1, 2000
-
Commissioning of the Barrytown Ilmenite Pilot PlantBy T Wootton
The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced
Jan 1, 1990
-
Copper Skarn Deposits in Eastern ChinaIn eastern China, most of the copper skarn deposits occur in folded troughs which are controlled by the EW-trending faulted fold systems (the Pal-Asian geotectonic domain), and the NNE-trending rift o
Jan 1, 1995
-
Managing steep seam dips and floor shears related dragline bench and lowwall instabilitiesBy J Li, J Regan, D Payne
The Caval Ridge Mine is an open cut coalmine and located within the Bowen Basin region in Central Queensland, and commenced mining and processing operations in 2014. A number of geotechnical challenge
Nov 29, 2022
-
Fluid Inclusion and Isotopic Constraints on the Mineralisation of the Shagou Ag-Pb-Zn Deposit, Henan Province, ChinaBy J-S Han, J-M Yao
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Shagou deposit is located along NE-trending faults within the high-grade metamorphic ba
Mar 18, 2015
-
Combined Flow Sheet for Treatment and Recycling of Municipal Solid Waste (MSW) with Complex Morphological CompositionCombined Flow Sheet for Treatment and Recycling of Municipal Solid Waste (MSW) with Complex Morphological Composition
Sep 13, 2010
-
Designing Processing Operations for the Future ù DonÆt Forget Acid DrainageWith the continued implementation of stricter limitations on the discharge of excess process water from all existing and future mining and metallurgical operations, the design and operation of the ent
Jan 1, 2004
-
The Strategic Dilemma for Mineral Engineering Service Providers to the Resources Industry in the Present High Demand EnvironmentBy A J. Broome
Since 2003, there has been an unprecedented growth in the demand for engineering, technical and project services in the mineral industries. This demand for services became evident in Australia earlier
Jan 1, 2007
-
The Resource Management Act - A Rich Seam for the Mining IndustryRecent legislation in the environmental field gives the mining industry an opportunity to take timely action to address its image. Shifting the focus away from mining (the activity) to minerals (the r
Jan 1, 1993
-
Updated Julius Kruttschnitt Semi-Autogenous Grinding Mill ModelBy C Bailey, T Kojovic, M M. Hilden, M S. Powell
The Julius Kruttschnitt semi-autogenous grinding (SAG) mill model was developed by Leung in the 1980s and extensively updated to the variable rates model by Morrell and Morrison in 1996. Since then on
Oct 29, 2012
-
Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with LocataBy C Rizos
Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati
Nov 22, 2011
-
Dilution optimisation in sublevel open stoping operationsBy A Vakili
Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk
Mar 29, 2023
-
Understanding Organisational and Personal Behaviours to Sustain High Productivity and SafetyAlthough AustraliaÆs coal mining industry is currently experiencing a pleasing period of price relief, long-term trends toward lower real prices will surely continue. Higher price levels attract expan
Jan 1, 2005
-
The practical characterisation of ferrosilicon for dense medium applicationsBy W Blair, J Bosman
The measurement of ferrosilicon rheology and characterisation of the parameters that have a direct influence on medium rheology provide the basis for evaluating, comparing and selecting an appropriate
Jul 24, 2017
-
Reducing total project cost in the study phase using zero base designBy J Merrells
Fluor, together with our clients, has yielded significant reductions in the total cost of mining projects by employing a systematic and methodical process of cost reduction. This paper outlines this s
Jul 24, 2017
-
Modelling Fines in Blast Fragmentation and its Impact on Crushing and GrindingBy W Valery, S Morrell
In the mining industry blasts are usually designed to fracture the in situ rock mass and prepare it for excavation and subsequent transport. The run of mine (ROM) fragmentation is considered good when
Jan 1, 1999
-
The importance of rate of rise in life-of-mine planning of an upstream raised tailings storage facility – a case studyBy D A. Williams, P J. Chapman
The acceptable rate of rise of the tailings beaches on upstream-raised tailings storage facilities (TSFs) is critical to life of mine planning. This is illustrated through a case study in Western Aus
Jul 23, 2018
-
Optimal slope profiles for maximum mine pit-wall steepness in banded iron formation rocksBy S Utili, A Agosti
The Overall Slope Angle (OSA) of pitwalls plays a crucial role in the financial return of an open pit mine. In current practice, pitwall profiles are designed to be planar in cross-section within each
Nov 29, 2022