Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Ground support rationalisation at Golden Grove

    By R Varden

    This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications

    Mar 29, 2023

  • AUSIMM
    New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build Phase

    By D FitzGerald

    A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the

    Mar 8, 2011

  • AUSIMM
    Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources

    By H M. Parker, G Verly, T Postolski

    Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On

    Nov 24, 2014

  • AUSIMM
    Australia’s hydrogen export in the form of embedded mineral derivatives

    By R Daiyan, G Burge, M Haider Ali Khan

    Australia’s mineral and metal exports have a substantial carbon footprint, twice that of its domestic emissions, mainly due to fossil-fuel-dependent downstream processes like processing into secondary

    Sep 1, 2024

  • AUSIMM
    Australia’s Potential for Nickel Sulfide Ore Systems – A New Continental-scale Time-space Framework for Exploration

    By R G. Skirrow, M Cooper, J Claoué-Long, K Czarnota, H Dulfer, J Thorne, D C. Champion

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Tholeiitic intrusion-hosted nickel (PGE-Cu) sulfide deposits are under-represented in Austr

    Mar 18, 2015

  • AUSIMM
    Cadia East Open Pit Project Mining Study

    The Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea

    Jan 1, 2007

  • AUSIMM
    Lessons learnt from six mine disaster case studies to improve audit and assurance and ESG

    By A Atkins

    Six recent case studies were selected based on the eight main causes of mine disasters (Table 1; Quinlan, 2014) and where credible information sources, such as Royal Commission Reports, Coronial Inves

    May 5, 2022

  • AUSIMM
    Raiseboring Experience with the Wirth Two Stage Sequential Reaming Head and HG330 Raiseborer

    By Fletcher A. E W

    Ever since it made its debut in 1962, in the form of a Robbins 31R, the raiseborer has become an accepted tool in the mining and civil construction industries. The first raiseborer to be used in th

    Jan 1, 1987

  • AUSIMM
    A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress Environment

    By L Nienaber

    Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper

    Mar 8, 2011

  • AUSIMM
    Extension of the Rosebery Mine by Decline Access Below 17 Level

    Access to the Rosebery Orebody, which dips into the western slopes of Mount Black at 45¦, has been achieved in sequence by the following means: - A series of adits down to 8 level - An inclined shaf

    Jan 1, 1982

  • AUSIMM
    Tunnel Boring in the Mount Lyell Mine

    The Channel Tunnel is an outstanding example of an undersea tunnel and its design illustrates most of the unique features of this type of tunnel. The marine site investigation was partic- ularly vuln

    Jan 1, 1976

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Improving Safety and Mine Productivity Using Real-Time Video Technology

    By J Westh, S Rashleigh, L Gallagher

    Mining companies are moving towards automated haul trucks and other equipment. One reason for this is that if automated trucks can operate in a standard pattern over and over again without variation,

    Nov 20, 2012

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Some Key Facts and Concepts in the Evolution of Sampling and Assaying Practices at Codelco

    Incorrect sampling and measurement operations and misunderstanding the components of variability can cause huge economic losses to the mining industry. The main objective of this paper is to illustrat

    Jan 1, 2008

  • AUSIMM
    Advancing Near-Mine Exploration with an Updated Geological Model for the Mount Wright Gold Deposit, Queensland

    By K Johnson, G Morrison, N Lisowiec

    The Mount Wright gold deposit is located near the town of Ravenswood, ~90 km south of Townsville, in north Queensland. The deposit has been mined by underground methods since 2006. It produced approxi

    Sep 26, 2013

  • AUSIMM
    Minimum Industry Gold Room Security

    Gold rooms represent a high security area and preventing theft is a challenging task. Where gravity concentrates or high value unit intermediate products are present, particular and specific security

    Aug 1, 2010

  • AUSIMM
    Accumulation of Trace Elements into Black Shale – How to Identify a Viable Source Rock for Orogenic and Carlin-style Gold Deposits

    By E Lounejeva, J A Halpin, A Chappaz, D D. Gregory, S Wu, T Lyons, P J. Sack, R R. Large, S W. Bull

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Newly published models suggest that some orogenic and Carlin-style gold deposits formed by

    Mar 18, 2015

  • AUSIMM
    The Augmented Mine Worker – Applications of Augmented Reality in Mining

    By J Bassan

    The mining industry is faced with imperatives to improve worker safety and productivity, adapt to skills shortages, high worker turnover rates, and provide more effective maintenance to new and ever m

    Nov 22, 2011

  • AUSIMM
    Python Underground Processing Plant Critical Design

    Python Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has

    Sep 13, 2010