    25 Years of Progressive in Numerical Modeling for Ground Control ? What Have We Accomplished and Where Do We Go Next?

    By Keith A. Heasley

    Exactly 25 years ago this month (August 12, 1981), IBM introduced the ?Personnel Computer? with a 16 bit operating system called MS-DOS 1.0. Since then, Moore?s Law, which essentially states that

    Jan 1, 2006

  • SME-ICGCM
    A Casting Method For Artificial Rock Specimens

    By Da Zhao Gu

    An important problem in rock engineering is to control the properties of artificial rock. A compaction technique for casting artificial rock specimens with controlled properties is described, i.e. usi

    Jan 1, 1992

  • SME-ICGCM
    A Method For Assessing The Potential Of Mine Subsidence At Abandoned Mine Sites Through The Assistance Of Finite Element Modeling

    By Richard E. Bischke

    Computer assisted finite element model analysis, originally developed to study stress distributions in aircraft, has been modified into a versatile mining program, that can be used to assist the engi

    Jan 1, 1984

  • SME-ICGCM
    A Method For Determination Of Strength Of Coal Mass

    By Guo Junfeng

    The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst, and its prediction method. Up to now, there has not been a method for determi

    Jan 1, 1992

  • SME-ICGCM
    A Method for Sizing Longwall Pillars Based on Field Measurements

    By Christopher Mark

    A new method for the design of longwall pillars, called "Analysis of Longwall Pillar Stability" (ALPS), is described. The method is the final result of a research program that included two major field

    Jan 1, 1987

  • SME-ICGCM
    A Mine Evaluation Protocol Using Applied Rock Mechanics Techniques

    By Gary B. Petersen

    The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc

    Jan 1, 2012

  • SME-ICGCM
    A Practical Solution to Highwall Mining Coal Reserves Sterilized by Auger Mining

    By Michael Amick

    Over the last few years as the coal industry has seen an increase in the price of coal, a renewed interest in the additional mining of pre-law highwall sites has occurred. Much premium coal and pro

    Jan 1, 2007

  • SME-ICGCM
    A Simple Tool to Measure Stress in Mine Backfill

    By A. MacG. Robertson

    A cone penetrometer has been used to assess the level of stress existing in hydraulically placed mine backill. The test apparatus was fabricated at the mine and consisted of a steel cone, connector ro

    Jan 1, 1986

  • SME-ICGCM
    A Sonic Wave Attenuation Technique For Monitoring Of Stress Levels

    By Po-Ming Lin

    Stress has a significant effect on the stability of pillars. In order to get an accurate picture of pillar stability, one needs information not only on the primary Stress distribution but also on all

    Jan 1, 1984

  • SME-ICGCM
    A Study of Roof Caving in the Eastern U.S. Coalfields

    Appropriate roof control is the most important requirement in underground coal mining and, in the case of longwall panels or second mining in room and pillar extractions, this can be simply expressed

    Jan 1, 1986

  • SME-ICGCM
    A Study On Stress Distribution And Reasonable Size Of Coal Pillar In A Coal Face

    By H. C. Li

    Mechanical models are established in accordance with the degree of mining on both sides of the coal pillar, and formulae were derived which calculated the superposition stress distribution and the wid

    Jan 1, 1992

  • SME-ICGCM
    A Test Of Predictive Numerical Models To Simulate Entry Design Changes Using Field Measurements From A Longwall Mining Gateroad

    By Jennifer Riefenberg

    Research efforts by the U.S. Bureau of Mines include running a series of displacement-discontinuity, boundary-element models to simulate the gateroad design at an underground coal mine in northwestern

    Jan 1, 1993

  • SME-ICGCM
    A Troubleshooting Guide for Roof Support Systems

    By Raymond A. Mazzoni

    Over the last twenty years, roof support technology has made numerous advances since the original wedge and slotted bolts of the 1950's. By comparison, the roof supports used today are more compl

    Jan 1, 1997

  • SME-ICGCM
    Advanced Prediction Methods for Roadway Behaviour by Combining Numerical Simulation, Physical Modelling and In-Situ Monitoring

    By Andreas Hucke

    For the roadway design in the German hard coal mining industry, an advanced combined planning system has been applied during the past 20 years. The German mining industry is working with single entry

    Jan 1, 2006

  • SME-ICGCM
    Airbag Support for Ground Control in Thin Seam Coal Mining

    By Fan Shaogang

    In this paper, the airbags' structure and technical characteristics and its applications in China are described. Based on the practice of the airbags in mining thin seams, the effects on ground c

    Jan 1, 1997

  • SME-ICGCM
    An Analysis Of Longwall Shield Cycle Effectiveness By Polycorder Monitoring

    By Greg Hendon

    Various methods have been used to evaluate the effectiveness of shields in place. The most common method used is static recording of leg pressures by visually examining pressure gauges. In an effort t

    Jan 1, 1990

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    An Application Of Fem Back Analysis Method To Mine Roadway

    Knowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements

    Jan 1, 1990

  • SME-ICGCM
    An Applications Approach To Barrier Pillar Design For Improved Resource Recovery

    By John R. Koehler

    Available barrier pillar design methods do not adequately account for overburden caving characteristics, the timing and magnitude of associated load transfers, the occurrence of unusual geologic featu

    Jan 1, 1989

  • SME-ICGCM
    An Improved Technique of In-Situ Measurement Of Fracture Zones Surrounding Gateroads

    By B. G. D. Smart

    An understanding of the nature of yield zones surrounding coal mine excavations is fundamental to the design of mine support systems. Various methods have been designed for investigation of undergrou