Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Integrated Explosive Management, Blast Design and Loading System
By Ola Lindahl, Mark Irving, John Hutchings
"Blasting is a process starting with a geometric description of the block of rock and ending with a pileof fragmented material. A key step in improving the productivity and quality control over the pr
Jan 1, 1997
-
Masterblaster Blasting Management System
By Chris Uys, Johan Labuschagne
Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th
Jan 1, 1997
-
Within a Stones’ Throw
By James Goldberg, Mark Withey
The Material Service Thornton quarry is a multi-million annual production tons complex. Surrounded by busy surface highways, and divided by a railroad on the north/south axis and further divided by a
Jan 1, 2006
-
Expansion of the Panama Canal
By Tom Treleaven
The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has
Jan 1, 1997
-
Basics of Salt Blasting
By Anthony J. Konya
"This paper was written during part of the author’s student co-op with Cargill Salt at its Avery Islandunderground salt mine in Louisiana. Blasting salt is a unique type of blasting that is different
Jan 1, 2016
-
Practical Aspects of GPS Positioning and Equipment Monitoring Technology in Drilling and Blasting
By Carl Hendricks
Aquila Mining Systems Ltd., is the world leader in drill monitoring, control and GPS-based machine navigation systems for the mining industry. This paper will review the design and application of AQUI
Jan 1, 2000
-
Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures
By Ewan Selers, Gary Cavanough
Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech
Jan 1, 2016
-
Analysis of Rock Fragmentation by Blasting Using Combined CFD/FEZ/DEM Models
By Alejandro Ferrada Vergara, Héctor Espinoza Muñoz
Drilling and blasting stages are considered factors that impact downstream processes significantly and over all the mining business value chain. Adequate control of these processes may represent energ
Jan 1, 2016
-
Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk
By Enver Alan
This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the
-
Application of the Blast Fragmentation Models in a Sandstone Quarry
By Türker Hüdaverdi, Özge Akyildiz
"In this research, image analysis technique, Kuz-Ram and KCO Models were used to examineefficiency of the quarry blasts. Investigations were performed in Cendere region, Istanbul. As a firststep, imag
Jan 1, 2016
-
Borehole Inspection with the HRS-1 Video System
By Tom Palangio, Ralph M. Olmstead
Video inspection of boreholes with cameras developed specifically for the mining industry is now possible. These designs are reliable, cost effective, and have the flexibility to be used in other appl
Jan 1, 1998
-
Overburden Blast Cast Designs, Factors Affecting Results and Economics
By Connie Postupack
The purpose of the workshop is to show the effect of various blasting factors on the overall results.
Jan 1, 1994
-
Underwater Blasting and Train-induced Ground Vibrations on 80 Years-old Building
By Paulo José Costa Couceiro Junior, Manuel Lopez Cano
In 2011, two historic outcrop rocks known as Teffé and Itapema located in the navigation channel of the Port of Santos, Brazil (Latin America’s largest port) – were excavated by drilling and blasting
Jan 1, 2016
-
Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA
By William C. B. Gates
Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re
Jan 1, 2016
-
The Effect of Faults, Delay Time and Scaled Distance on Vibration Parameters
By Enver Alan, MerkeziYapı
People are migrating because of economic, social, natural and political reasons. These natural and humane factors effects the distribution of populations. The need for tunnels has grown in order to pr
-
Wipfrag and Wipjoint - To Measure, Record and Predict Blast Results
By John A. Franklin, Tom C. Palangio, Norbert H. Maerz
WipFrag systems I and II have become the world standard in photoanalysis systems to measure fragmentation. Mines, quarries and excavating contractors can now easily measure blast results and track the
Jan 1, 1997
-
A Model for Near and Farfield Blast Vibration Based on Multiple Seed Waveforms and Transfer Functions
By D. Scott Scovira, Ruilin Yang
Blast vibration in the highwall from a cast blast in open pit mines or in the hanging walls from a stope blast in underground mines is a common concern. Vibration in such cases is a typical near-field
Jan 1, 2010
-
Reliability of Timing Sequence Network for Multiple Blast Holes
By Lifeng Li, Jhon Silva-Castro
In a previous work, the authors analyzed the overlapping probability of two adjacent charges in a single hole for pyrotechnic and electronic detonators. This document extends such work to a complete m
Jan 1, 2016
-
Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study
By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody
Nowadays, with such a focus on environmental protection, surface mining activities have come under pressure to ensure their activities do not adversely affect the local surroundings. As part of the ex
-
Garbage Plug Demolition Using a Low Detonation Velocity Explosive in “Presa Mixcoac” Dam, in Mexico City
By Enrique Albarrán, Julian Hernández
"In 1942 The “Presa Mixcoac” dam was built, along with 15 other dams, to control the rain fall waterin the mountains west of Mexico City. Mexico City’s population at that time was around 1.5 millionpe
Jan 1, 2016