Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Overview of Optimizing Strategies for Flotation Banks
By M. Maldonado, J. A. Finch
"A flotation bank consists of a serial arrangement of cells. How to optimally operate a bank remains a challenge. This article reviews three strategies for optimizing bank performance: air profiling,
Jan 1, 2012
-
Unlocking Value through Flotation Equipment Maintenance
By P. Tolvanen, A. Jalili
"When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a
Jan 1, 2015
-
The Gold Gravity Recovery Effort - A New Concept in the Design and Optimization of Recovery Circuits
By Z. Xiao, A. R. Laplante
"The recovery of gold by gravity from grinding circuits differs from virtually all other gravity recovery approaches in that stage (or unit) recoveries are low, typically 1 to 5%, but overall recoveri
Jan 1, 2001
-
Predicting the Effect of Grinding Media Size Distribution on the Performance of a Ball Mill Using Discrete Element Method (DEM) and Population Balance Techniques
By S. Makni, A. Faucher, F. Robichaud, A. Bouajila
"Optimizing the ball charge in a grinding mill may be needed to maximise throughput or alternatively, to achieve proper product size in more challenging situations. Efforts to optimise the ball charge
Jan 1, 2012
-
Mining taxes and social policy
By Robert B. Parsons
"Exploration and development of mineral resources in developing countries by Canadian-based multinational mining companies is becoming increasingly common. One problem being encountered is that the ob
Jan 1, 1991
-
Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate
By A. Drouin, D. Lemieux, C. Chouinard
"A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t
Jan 1, 2017
-
The Kumtor Gold Mill Start Up and Start up Challenges
By John Kazakoff, Andrew Mortimore
"Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the
Jan 1, 1999
-
Geophysical Case Study of Shallow and Deep Structures Based on Traditional and Modified Interpretation Methods: Application to Tectonic Studies and Mineral Exploration
By J. Asfahani
"The Schlumberger configuration used in geoelectrical sounding is slightly adapted here to obtain reliable data for both shallow and deep penetration depths from the same survey. In this configuration
Jan 1, 2009
-
Controlled blasting to minimize overbreak with big boreholes underground
By P. R. Day, W. K. Webster
"The introduction of large boreholes underground initially involved taking the techniques of open-pit bench blasting to the production stope, but with deeper boreholes and narrower stopes more control
Jan 1, 1982
-
Ore Characterisation of the Aqqaluk Deposit at Red Dog
By Steven W. Wilson, Brigitte Lacouture, Nichola A. McKay
"The Aqqaluk deposit is a lead-zinc ore body that lies immediately north of the Main Pit at Teck Cominco’s Red Dog Mine in Alaska. It is scheduled to begin production in 2011 or 2012. A project team w
Jan 1, 2007
-
Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions
By Richard Mcivor, Largo Albert
"Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac
Jan 1, 1988
-
Maintenance management control through utilization of a computerized system at the Key Lake project
By T. Warren, R. Pender
"Significant strides have been made during the past decade to integrate the traditionally separate administrative functions of financial management, materials management and maintenance management.In
Jan 1, 1990
-
A Review of Gas Dispersion Studies in Flotation Plants
By Jan E. Nesset, Julie Fournier, Jorge Torrealba, Colin Hardie
"Gas dispersion studies have been used to benchmark and optimize plant flotation performance for more than a decade, although this technology is not as widely in use as it likely should be based on th
Jan 1, 2015
-
Electrical and environmental protection of high- and low-voltage mine cables
By R. W. Mei, R. A. Strombom, D. J. Moore
"Heat-shrinkable cable accessories are solving problems in the mining industry. This paper describes a range of products used by the industry, including low-voltage splices, high-voltage splices to 8.
Jan 1, 1980
-
Australian Proterozoic Iron Oxide-Cu-Au Deposits: An Overview with New Metallogenic and Exploration Data from the Cloncurry District, Northwest Queensland
By Patrick J. Williams, Peter J. Pollard
"Abstract - Enigmatic hydrothermal vein/breccia/replacement Cu-Au deposits with magnetite and/or hematite are well-represented in Australian 1850 Ma to 1500 Ma terrains and associated with different-a
Jan 1, 2001
-
The geology and economic potential of the Athabasca Basin in Alberta
By John Wilson
"The unconformity beneath 75 per cent or over 6000 km2 of the Athabasca Basin in Alberta lies within economically exploitable depths. The basement beneath this unconformity consists of an extension of
Jan 1, 1987
-
Shaft hoisting system for Olympic Dam
1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and
May 1, 2003
-
Are Ferronickel Furnaces at Thermodynamic Equilibrium?
By M. Y. Solar, W. G. Davenport
Most of the recent growth in nickel demand has been for the production of stainless steels and virtually all of it has been satisfied by new ferronickel and nickel pig iron projects. But "good" lateri
Jan 1, 2014
-
Process Development for Milling B-Zone Ore at Rabbit Lake
By S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988
-
Forage ITH à Haute Pression à la Mine Goldex
By Patrick Frenette
Résumé La Mine Goldex entrera en production au 2ième trimestre de 2008. Pour permettre une production de l?ordre de 6960 tpj, le forage ITH à une pression de 400 psi (28 bar) à été sélectionné. Il s
Feb 1, 2008