Search Documents

  • SME
    A 4.75m Contractor Manufactured EPB Machine

    By Bruce Richardson

    A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec

    Jan 1, 2008

  • SME-ICGCM
    Regional Two-Seam Stress Analyses At The Deer Creek Mine (58f624e3-fdec-4f72-b0ef-8ec1e65d9bd2)

    By Hamid Maleki

    A geotechnical monitoring program has been implemented at Energy West Mining Company for enhancing site-specific evaluation of longwall stress conditions. This program consists of underground measure

    Jan 1, 2009

  • AIME
    Institute of Metals Division - Primary Recrystallization Textures in Cold Rolled Si-Fe Crystals

    By C. G. Dunn, P. K. Koh

    The primary recrystallization textures of 11 single crystals cold rolled 70 pct were determined. The effect of crystal orientation on recrystallization behavior was investigated also and found to be l

    Jan 1, 1957

  • DFI
    Treated Round Wood Piling Specifications

    By James S. Graham

    Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a

    Jan 1, 1992

  • AUSIMM
    The Deformation of a Duplex Brass by Cold Drawing

    By McDonald G. G

    In the deformation of a metal or a single-phase alloy all the crystals composing the metal after their shape in a similar manner as the metal in bulk and to about· the same extent. This is not th

    Jan 1, 1941

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012

  • ISEE
    An Analytical Approach For Diagnosing and Solving Blasting Complaints

    By Douglas Rudenko

    Have you ever had a neighbor complain about a blast one day, but says the next day’s blast was better, even though the Peak Particle Velocity (PPV) increased? How about neighbors that complain about a

    Jan 1, 2000

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

  • AUSIMM
    Pillar Design in Hard Rock Mines - Can we do this with Confidence?

    This paper gives an overview of the difficulties associated with determining the strength of hard rock pillars. Although a number of pillar design tools are available, pillar collapses still occur. Re

    Nov 25, 2010

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • SME
    Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)

    By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan

    A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove

  • SME
    Electrical Default Detection on Downed DC Trolley Lines – Preprint 97-38

    By J. S. Peterson, G. P. Cole

    The National Institute for Occupational Safety and Health (NIOSH), Pittsburgh Research Center (PRC), has conducted research to improve electrical fault detection on coal mine direct current (dc) troll

    Feb 24, 1997

  • ISEE
    Vibration Control Blasting for Low Stability Final Wall

    By Greg Wyartt

    In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl

    Jan 1, 2018

  • AUSIMM
    The Politics of Mining in New Zealand

    By R Tweedie

    'The politics of mining in New Zealand' is a topic I chose myself because of its importance in the future of the New Zealand mining industry. There are many people in the industry who are cy

    Jan 1, 1991

  • AIME
  • AIME
    Hardening Effects Resulting From The Formation Of Both A Precipitate Phase And A Superlattice

    By M. R. Pickus, I. W. Pickus

    ORDINARILY age-hardening is thought of as being associated with a limited solubility of one metal in another. Much less has been written about the type of age-hardening that attends the formation of s

    Jan 1, 1943

  • DFI
    A Quality Control System For Augered Cast-In-Place Pile Installation

    By George G. Goble

    The use of augercast piles has been limited by the engineer's concern for the structural quality of the installed pile. The nature of the pile is such that its final structural continuity is very

    Jan 1, 1997

  • NIOSH
    The Effects of Water Emulsified Fuel on Diesel Particulate Matter Concentrations in Underground Mines

    By L. D. Patts, J. D. Noll, S. E. Mischler, G. H. Schnakenberg

    In this study, we evaluated the ambient diesel particulate matter (DPM) concentrations (at the intakes and exhausts of the mine) as the entire vehicle fleet of a stone mine switched from using 35% bio

  • TMS
    Onset of Void Coalescence Studied by X-Ray Computed Tomography

    By Akihide Hosokawa

    The void growth and coalescence in model materials involving a pre-existing three dimensional void array (i.e. multiple layers of a void array) was studied by X-ray computed tomography (XCT) coupled w

    Jan 1, 2010

  • AIME
    Determination Of Room And Pillar Dimensions For The Oil-Shale Mine At Rifle, Colorado

    By Fred D. Wright, Philip B. Bucky

    FOREWORD By E. D. Gardner[$] THE present known petroleum reserves are limited, and unless important new fields are discovered the Nation will be dependent, in the not too distant future, upon im

    Jan 1, 1947